Search results

1 – 10 of over 22000
Open Access
Book part
Publication date: 1 May 2019

Sondre Evjen, Gustav Gunnerud, Ola Lædre, Rune Søfting and Jardar Lohne

Reports from the Norwegian police indicate that actors in the architecture, engineering and construction industry face severe competition from criminal actors. Sub-contractors

Abstract

Purpose

Reports from the Norwegian police indicate that actors in the architecture, engineering and construction industry face severe competition from criminal actors. Sub-contractors working within the law struggle to be competitive compared to dubious sub-contractors. This study aims to examine (1) what the sub-contractors’ perceptions of current contracting practices are, (2) what problems they face and (3) what countermeasures can be used to improve the situation.

Design/Methodology/Approach

The research was carried out on the basis of a qualitative approach. A literature review and a document study of reports from the sub-contractors, public agencies and other relevant organisations were conducted. In addition, in-depth interviews were conducted with the management of eight sub-contractors in the Norwegian architecture, engineering and construction industry.

Findings

There is a significant difference in the perception of the reality between contractors’ management and the blue-collar workers. Management among the contractors maintain that their control systems work; however, the result from this study shows that it is easy for the sub-contractors to take advantage of loopholes or avoid the countermeasures.

Research Limitations/Implications

This paper is limited to Norway and use only the paint industry as a case study.

Practical Implications

This study shows that sub-contractors constitute an important source of information in the effort to prevent dubious sub-contractors as they are the actors who experience the greatest pressure and competition from them. Therefore, contractors should include the sub-contractors in the process of developing measures to prevent this misconduct.

Originality/Value

A very little research has been carried out within this field of study in Norway.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Article
Publication date: 1 June 1997

H.H. Martin

Presents a discussion of the research survey carried out at the Faculty of Technology Management at the Eindhoven University of Technology concerning contractors’ maintenance…

1920

Abstract

Presents a discussion of the research survey carried out at the Faculty of Technology Management at the Eindhoven University of Technology concerning contractors’ maintenance. First, gives a brief introduction to the emerging contracting out phenomenon in The Netherlands. Then, provides an overview of several contract types that can be offered by contractors and the potential difficulties that have to be solved in establishing such contracts. Complements this with some first‐hand experiences gained in actual situations. Further discusses the importance of taking the initiative by the contractor in developing a contracting out market for maintenance. Finally, makes suggestions with respect to developing in‐depth research in this area.

Details

Journal of Quality in Maintenance Engineering, vol. 3 no. 2
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 29 May 2007

Rosanna Duncan, Julianne Mortimer and Jane Hallas

The UK Race Relations (Amendment) Act 2000 places a statutory duty on all public authorities to promote race equality throughout all their functions. The purpose of this paper is…

Abstract

Purpose

The UK Race Relations (Amendment) Act 2000 places a statutory duty on all public authorities to promote race equality throughout all their functions. The purpose of this paper is to discuss steps being taken by social landlords in Wales and contractors and consultants to promote race equality within the construction procurement process.

Design/methodology/approach

The principle methods of data collection were focus groups with social landlords and postal questionnaires and semi structured telephone interviews with construction contractors and consultants.

Findings

Little action is being taken by social landlords in Wales to promote race equality within the construction procurement process. Furthermore, construction contractors and consultants that undertake work on behalf of social landlords are doing little to ensure race equality within their own organisations.

Research limitations/implications

A relatively small sample of construction contractors and consultants took part in the research.

Practical implications

In order to meet their obligations under current legislation social landlords need to ensure that they promote race equality within the procurement process. Construction companies including maintenance and minor works contractors that aspire to be engaged by social landlords will need to demonstrate that they are committed to race equality and its implementation and have the appropriate policies and procedures in place to ensure this.

Originality/value

This research is the first to evaluate the procurement practices of social landlords in Wales and how these practices may impact on race equality within the procurement process. The research also examined the steps being taken to promote equality by construction contractors and consultants operating within the social housing sector in Wales.

Details

Facilities, vol. 25 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 22 August 2008

Robert H. Kieserman

This paper aims to explain the rules and regulations for using independent contractors in a library setting.

1897

Abstract

Purpose

This paper aims to explain the rules and regulations for using independent contractors in a library setting.

Design/methodology/approach

The paper uses the personal expertise of the author who has been a professor of human resources management as well as a library consultant to all types of libraries for over 15 years.

Findings

The importance of treating independent contractors very differently from employees is emphasized. The paper provides a step‐by‐step guideline on the compliance issues by which every library and independent contractor must abide to guarantee a legitimate relationship in the eyes of the Internal Revenue Service.

Originality/value

This paper helps the library director and the library department manager more intelligently use independent contractors within the operation of a library organization.

Details

The Bottom Line, vol. 21 no. 2
Type: Research Article
ISSN: 0888-045X

Keywords

Article
Publication date: 8 May 2007

Thanapun Prasertrungruang and B.H.W. Hadikusumo

This study is intended to investigate the current practices and problems in heavy equipment management as well as to identify practices capable of alleviating equipment management…

1580

Abstract

Purpose

This study is intended to investigate the current practices and problems in heavy equipment management as well as to identify practices capable of alleviating equipment management problems for highway contractors in Thailand.

Design/methodology/approach

Equipment management practices were identified and analysed by SPSS using a questionnaire survey. ANOVA test was used to reveal significant differences in equipment management practices among different contractor sizes. Relationships between equipment management practices and problems were also revealed.

Findings

The equipment management practices vary, to some extent, among different contractor sizes. While practices of medium and small contractors tend to be similar, practices of large contractors are different from those of smaller contractors. Large contractors often put more emphasis on outsourcing strategy for equipment management. Moreover, large contractors frequently dispose of or replace equipment as soon as the equipment becomes inefficient before incurring high repair costs. Conversely, smaller contractors tend to mainly emphasise on the company finance and the budget availability as they often rely on purchasing strategy, especially buying used machines. Overall, equipment practices of large contractors were found to be more successful than smaller contractors in minimising equipment management problems, including long downtime duration and cost.

Originality/value

This research is of value for better understanding practices and problems relating to heavy equipment management among different contractor sizes. The study also highlights practices that are capable of reducing problems relating to heavy equipment management for highway contractors.

Details

Engineering, Construction and Architectural Management, vol. 14 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 October 2002

C.Y. Yiu, S.M. Lo, S. Thomas Ng and Michael M.F. Ng

Contractor selection models have been developed for large scale works with the assumption of the availability of contractor’s information for the clients. However, a similar study…

1884

Abstract

Contractor selection models have been developed for large scale works with the assumption of the availability of contractor’s information for the clients. However, a similar study of small building works, especially building maintenance and repair works, is almost ignored. In light of the small amount of work, the employment of building consultants for the selection of contractors in small works is often not feasible, and the cost of acquiring the contractor’s information is often prohibitively high. This research uses case studies to show that a contractor selection model for large scale works does not perform well in small works without the advice of the consultant. The high proportion of specification costs in small works contracting deters the detailed design and documentation stage. A wider variation of tender sums is therefore expected and revealed in the case studies. This paper reviews the building procurement mechanism in small building works in Hong Kong and argues that the employment of a property management agent is conducive to the contractor selection process. Accordingly, further investigations are warranted for a contractor selection model for small building works.

Details

Structural Survey, vol. 20 no. 4
Type: Research Article
ISSN: 0263-080X

Keywords

Article
Publication date: 1 August 1996

Nasrollah Ahadiat and Keith Ehrenreich

Government contractors operate under circumstances unmatched in the commercial marketplace. A significant factor for conducting business in that environment is the use of heavy…

1574

Abstract

Government contractors operate under circumstances unmatched in the commercial marketplace. A significant factor for conducting business in that environment is the use of heavy regulations. Government regulations for defence contractors include such procurement requirements as cost accounting standards, cost limitations and cost exclusions as outlined in the Defense Contract Audit Manual, Federal Acquisitions Regulations and Defense Acquisition Regulations. Defense Contract Audit Agency auditors must perform all necessary audits and ascertain contractor compliance with these standards as part of their internal control review. While contractors maintain costly accounting systems for the sole purpose of reporting to the Government, frequently adverse audit opinions are presented resulting in adversarial relationship between the two parties. First, addresses some of the most significant issues that lead to the development of conflict between the Goverment auditors and contractors, then provides some recommendations which are expected to reduce tension and increase efficiency of audit operations.

Details

Managerial Auditing Journal, vol. 11 no. 6
Type: Research Article
ISSN: 0268-6902

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 January 2024

Joseph Kuruneri and Wiston Zivanai

Governments worldwide seek to optimize value in public project bids. Social procurement (SP) has become a global tool for achieving project goals. The purpose of this study is to…

Abstract

Purpose

Governments worldwide seek to optimize value in public project bids. Social procurement (SP) has become a global tool for achieving project goals. The purpose of this study is to assess the understanding of SP among contractors and identify its drivers to optimize the value associated with public projects.

Design/methodology/approach

A total of 15 major contractors were interviewed to obtain their views on SP, appreciate their current practices and identify the main drivers of SP in projects. A semistructured interview was used to gather relevant data. Neo-institutional theory is the lens of the study used to provide the focus of the research. The collected data were analyzed using the thematic data analysis technique.

Findings

The study found that SP is understood as corporate social responsibility and is not handled in a structured manner guided by policies or clearly defined procedures. Additionally, research has shown that compliance requirements, rather than value and goodwill, are the main inspiration for SP practices.

Research limitations/implications

The study’s limitation is the fact that it was conducted in the context of Botswana and only used the interview technique as the solo data collection method. The other limitation is the lack of empirical literature on SP concerning the lack of SP policy in Botswana.

Originality/value

This study raises awareness of the concept of SP among contractors in Botswana and eases its implementation within the industry.

Details

Modern Supply Chain Research and Applications, vol. 6 no. 1
Type: Research Article
ISSN: 2631-3871

Keywords

Article
Publication date: 8 February 2024

Suhaib Arogundade, Mohammed Dulaimi, Saheed Ajayi and Ali Saad

The decisions of contractors could impact the reduction of construction carbon footprint. These decisions are linked to the belief of contractors which equally affects how they…

Abstract

Purpose

The decisions of contractors could impact the reduction of construction carbon footprint. These decisions are linked to the belief of contractors which equally affects how they behave while delivering projects. This study aims to investigate the behavioural tendencies of contractors that could lead to carbon minimisation during the execution of construction projects.

Design/methodology/approach

An industry survey was performed amongst 41 UK construction professionals. Spearman’s correlation and factor analysis were used to analyse the data.

Findings

The result of the Spearman’s correlation gave rise to 14 contractors’ carbon reduction behaviour (CCRB) variables and their factor analysis yielded two distinct factors, namely, contractors’ consummate carbon reduction behaviour and contractors’ pragmatic carbon reduction behaviour. The findings suggest that in the UK, contractors are willing to take voluntary practical steps to decrease the carbon footprint of construction projects.

Practical implications

This finding might be unexpected to construction stakeholders, especially construction clients who may believe that infusing strict carbon reduction obligations in contracts is sufficient in nudging contractors to lessen the carbon impact of projects.

Originality/value

The study attempted to quantitatively derive CCRB, thereby extending the breadth of knowledge in the construction carbon reduction domain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of over 22000