Article
Publication date: 12 February 2020

Moshood D. Taofeeq, A.Q. Adeleke and Chia-Kuang LEE

The main parties in construction projects are the engineers, clients, architects, contractors, material suppliers, and consultants such as the project managers. They play the most…

1067

Abstract

Purpose

The main parties in construction projects are the engineers, clients, architects, contractors, material suppliers, and consultants such as the project managers. They play the most important roles in implementing construction projects, and their activities have a significant impact on their risk attitudes during the execution of projects. Because each participant has their particular interests, by proprietary information, each participant is driven to achieve maximum benefit, which can result in improper behaviour concerning each other. The risk in this situation is that there would be a moral hazard and adverse selection based on information asymmetry among principal construction participants especially contractors; this outcome is called risk attitudes. Behaviour is affected by various risk factors and the successful implementation of construction projects depends on effective management of the key risk factors part of which is a personal factor. The purpose of this paper is to identify the critical factors affecting contractors’ risk attitudes among Malaysian construction companies with the moderating role of government policy. Organizational control theory and expected utility theory were used to develop the theoretical framework. The study investigated G7 contractors in the Malaysian construction industry. Data were collected through the use of a questionnaire.

Design/methodology/approach

The research analysis was based on structural equation modelling (SEM), and the research model was ascertained through the Smart PLS 3.0 software (Ringle et al., 2012). Partial least square-SEM is an appropriate analysis that was used to assess the results in the current research because its algorithm permits the unrestricted computation of cause-effect relationship models that use both reflective and formative measurement models. This study uses the quantitative method to identify the individual factors influencing contractors’ risk attitude and the moderating role of government policy among construction companies in Malaysia. This study also focussed on the G7 contractors operating in the Malaysia construction industry that specializes in building, bridge and road construction projects. The duration of the data collection was between two and three weeks. The questionnaire was prepared both in Malay and English languages to allow the respondents to respond most conveniently. Before the copies of the questionnaire were distributed, the selected contractors’ committees were duly informed about the details of the survey procedures. The adopted Likert scale was originally a five-point scale that ranges from “very low” to “very high” with “low or high” in between.

Findings

The result of this study moderately supports the hypothesized relationships proposed in the theoretical model. In particular, the results recommended that personal factors that affect risk attitudes (working experience, emotional intelligence, professional competence and physical health) have a significant relation with contractors’ risk attitudes in the construction companies in Malaysia. Also, it has been found that government policy (rules and regulations) are important determinants of risk attitudes.

Research limitations/implications

The study focussed on individual factors affecting contractors’ risk attitudes in the construction company’s in Malaysia. Therefore, the dimensions of factors affecting risk attitudes can be used in another aspect of construction projects such as management factors, economic factors and technical factors. Therefore, further research might investigate other grades of Malaysian construction companies apart from Grade 7 contractors to know if there is a similarity in the results; other grades of the contractors might have potential positive contributions to the construction industry as well.

Practical implications

With consider to the practical, the current research findings have several contributions for the contractors and project managers. The research results demonstrate that government policy plays an important role in the construction industry and organizational support will also help contractors to control their attitudes in working place. Individual factor has a direct relationship with contractor risk attitudes (CRA), project managers must ensure that the government policy has an impact in all their workers and offered is competitive, fair and by their employees’ contribution. Apart from that managers should also focus on organizational goals especially in managing professional and skilled contractors in the companies. Employees who perceived their employers as uncaring or not supporting their needs and well-being may not be happy working with the organization and the tendency for them to change their attitudes towards risk will be high.

Social implications

This study also contributes knowledge by lending empirical support to the organizational control theory and expected utility theory system’s effect on CRA and confirming that changing one individual attitude will change the whole equilibrium. This is useful to aid in further synthesis of organizational control theory and expected utility theory in construction companies.

Originality/value

This study is the first attempt at evaluating the direct and moderating effect relationships among individual factor affecting risk attitudes, government policy and CRA in Malaysian construction companies. These findings also prop up the applicability of the organizational control theory and expected utility theory within the context of construction companies in Malaysia. Also, this study contributed to the literature on psychology by subjective (psychological) measures of individuals’ behaviour and decisions. In the CRA literature, there has been much discussion on personal characteristics to understand behaviours such as attitudes of a contractor towards risk and morals.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 1 February 2021

B.A.K.S. Perera and Kaveesha Gihani Dewagoda

Delayed payments have been long standing, pressing issue in construction projects, especially in Government-funded construction projects. The root causes and the consequences of…

Abstract

Purpose

Delayed payments have been long standing, pressing issue in construction projects, especially in Government-funded construction projects. The root causes and the consequences of delayed payments must be identified before implementing strategies to mitigate the consequences of such delayed payments. However, these causes and consequences and the parties responsible for managing the delayed payments have not been identified so far. Therefore, the purpose of this study is to investigate the management of payment delays in Government-funded construction projects.

Design/methodology/approach

The study used a mixed approach comprising four case studies and a questionnaire survey. The empirical data collected from the case studies and the questionnaire survey were analysed using manual content analysis and mean rating, respectively.

Findings

The study identified the most significant causes and the most significant consequences of delayed payments that occur in Government-funded construction projects. It also revealed the strategies that clients, consultants, contractors and other parties can adopt to mitigate the adverse consequences of such delayed payments.

Originality/value

This study identified the most significant causes of delayed payments in Government-funded construction projects, the most significant consequences of such delayed payments and the most suitable strategies the clients, consultants and contractors can adopt to mitigate the consequences of such delayed payments. Thus, this study supports streamlining the management of payment delays in Government construction projects and identifies the roles that different parties must play in managing payment delays in Government building projects, which is an under-researched area.

Details

Journal of Financial Management of Property and Construction , vol. 26 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 23 April 2018

Isaac Sakyi Damoah and Desmond Kwadjo Kumi

The purpose of this paper is to investigate the factors that cause government construction projects failure in a developing economy.

2413

Abstract

Purpose

The purpose of this paper is to investigate the factors that cause government construction projects failure in a developing economy.

Design/methodology/approach

The study used the sequential data collection approach through an in-depth semi-structured interview (16 participants) and questionnaire survey (230 participants) to solicit their perceptions from project management practitioners (PMP), contractors and client (government officials) about the factors that lead to Ghanaian Government construction projects. The relative importance index was used to determine the relative importance of the factors identified. This was followed by Spearman rank correlation coefficient and Kendall’s coefficient of concordance to measure the degree of agreement among the participants on their perceptions.

Findings

In total, 34 factors were identified as the main factors that lead into Ghanaian Government construction projects failure. The top ten most important factors that cause Ghanaian Government construction projects failure are: political interferences, delays in payment, partisan politics, bureaucracy, corruption, poor supervision, lack of commitment by project leaders, poor planning, starting more projects than the government can fund and change in government. The failure factors were grouped into four main themes and found that the most important failure factors are leadership. This is followed by management and administrative practices, resources and external forces, respectively.

Research limitations/implications

This study is limited to only the public sector, and therefore the findings may not be applicable in the private sector.

Practical implications

Policy makers and construction PMP would be able to use the findings as a guide during the implementation of government projects in order to reduce and/or avoid government construction projects failure.

Originality/value

Construction projects failure in developing countries is high. Accordingly, the extant literature has been devoted to identifying the factors that lead to failure; however, they have mainly been discussed from a generic point of view or individual case studies. Researches that focus exclusively on government construction projects in developing countries are rare despite the dynamics in which these projects are implemented. This research extends the construction project management literature by focussing on government construction projects in a developing economy, where there are weak public institutional systems coupled with partisanship politics and bad cultural orientation towards government sector work inherited from a colonial rule.

Details

International Journal of Managing Projects in Business, vol. 11 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 20 May 2022

Heba Ayoub, Ghaleb Sweis, Waleed Abu-Khader and Rateb Sweis

This study aimed to provide a framework that includes the principles of sustainable construction to evaluate their application in the construction of government building projects

Abstract

Purpose

This study aimed to provide a framework that includes the principles of sustainable construction to evaluate their application in the construction of government building projects in various environmental, economic, and social aspects distributed over the project phases throughout its life cycle.

Design/methodology/approach

Qualitative methods from literature review and analysis of sustainability assessment tools were used to design the framework. The designed framework included six main categories, comprising 19 indicators that include sustainable building principles to assess application levels in government construction projects. It was used to evaluate applying sustainability practices in Jordanian government construction projects. 133 questionnaires were distributed to a convenience sample of three government institutions concerned with the design, implementation, and management of government buildings in Jordan.

Findings

After collecting the quantitative data, the results showed that there is an application of six sustainability principles during the initial planning, analysis, and design stages of Jordanian government construction projects. The results focused on the application levels in social sustainability principles versus environmental and economical, especially in the operating stages during the project life cycle.

Originality/value

This study contributes by providing a tool to evaluate the sustainability of government construction projects and increase the efficiency and effectiveness of these types of buildings in both the short and long term by making them more sustainable. Subsequently, recommendations are made on reorienting government construction projects toward a sustainable building approach.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 January 2022

Mohammad Hashim Ibrahimkhil and Laith Hadidi

The aim of this paper is to assess the safety level of construction sites in Afghanistan following the US Army Corps of Engineers (USACE) safety practices and compare this with…

Abstract

Purpose

The aim of this paper is to assess the safety level of construction sites in Afghanistan following the US Army Corps of Engineers (USACE) safety practices and compare this with other construction sites in Afghanistan that follow local government safety guidelines. The USACE oversees and funds many infrastructure projects in Afghanistan, and these projects are supposed to follow the same standards implemented in the USA, including safety standards. The local government of Afghanistan also funds infrastructure projects in Afghanistan; however, these do not follow USACE best practices. This research explores the question of whether the USACE standards provide a safer construction site. The effect of the USACE standards on safety practices in construction projects is also investigated in the Afghanistan construction industry.

Design/methodology/approach

A literature review and other safety checklists were used to develop a safety checklist containing 104 items (questions) in 17 categories. Subsequently, the checklist was used to assess the safety performance of 57 construction projects (25 USACE projects, and 32 governmental projects). Utilizing quantitative analysis, the Spearman rank correlation coefficient (Rho) and Mann–Whitney tests were carried out for correlation and statistical disparity between USACE and governmental projects.

Findings

The safety performance level of Afghan government projects was found to be poor in relation to other developing countries, while in USACE projects it was excellent. In addition, fire prevention, safety administration, PPE, heavy equipment, and handling and storage of materials for all types of contractors were the most overlooked aspects of Afghan Government projects.

Practical implications

The findings clearly demonstrate the deficiencies in construction sites observed during this study and also support the adoption of USACE standards in Afghanistan projects.

Originality/value

To the best of the authors’ knowledge, this study is the first to investigate the safety of construction sites in Afghanistan. The study also demonstrates the benefits of adopting international standards (USACE) to improve the safety of construction sites in a developing country such as Afghanistan. The findings provide evidence of the safety of the Afghanistan construction industry compared to other developing countries. These findings will contribute to the Afghan Government's efforts to track injury statistics.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 August 2021

Kwadwo Oti-Sarpong, Erika Anneli Pärn, Gemma Burgess and Mohamed Zaki

Government initiatives to improve construction have increasingly become more focused on introducing a repertoire of technologies to transform the sector. In the literature on…

1304

Abstract

Purpose

Government initiatives to improve construction have increasingly become more focused on introducing a repertoire of technologies to transform the sector. In the literature on construction industry transformation through policy-backed initiatives, how firms will respond to the demands to adopt and use innovative technologies and approaches is taken for granted, and there is scarcely any attention given to the institutional implications of transformation agenda. The purpose of this paper is to discuss these gaps and offer directions for future research.

Design/methodology/approach

Following a synthesis of literature on the UK’s industry transformation agenda, the authors use the concepts of institutional logics, arrangements, complexity and strategic responses to suggest seven research questions that are at the nexus of policy-backed transformation and institutional theory.

Findings

In this paper, the authors argue that increasing demands for the adoption and use of digital technologies, platforms, manufacturing approaches and other “industry-4.0”-related technologies will reconfigure existing logics and arrangements in the construction industry, creating a problem of institutional complexity for general contracting firms in particular.

Originality/value

The questions are relevant for our understanding of the nature of institutional complexities, change, strategic firm responses, field-level dynamics and implications for the construction industry in relation to the transformation agenda. This paper is positioned to spur future research towards exploring the consequences of industry transformation through the lens of institutional theory.

Open Access
Article
Publication date: 7 May 2024

Yazeed A. Alragabah and Mohd. Ahmed

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…

Abstract

Purpose

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.

Design/methodology/approach

This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.

Findings

The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.

Research limitations/implications

This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.

Originality/value

Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.

Details

Frontiers in Engineering and Built Environment, vol. 4 no. 3
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 10 June 2021

Yogeshwar V. Navandar, Chintaman Bari and P. G. Gaikwad

The purpose of the present study is to examine the failure factors for the construction firms in a developing nation. Furthermore, the comparison of failure factors for private…

Abstract

Purpose

The purpose of the present study is to examine the failure factors for the construction firms in a developing nation. Furthermore, the comparison of failure factors for private and government firms are evaluated.

Design/methodology/approach

In the present study, comparison between private and government construction firms is done in the context of a construction firm failure. About 60 construction firms were selected in and around the Nashik region for the investigation, where a simple multi-attribute rating technique (SMART) is used for analysis purpose.

Findings

It is found that for private firms (private contractors and builders) lack of experience is the major factor for failure of the business as against lack of managerial experience is a critical factor in case of a government contractor.

Practical implications

The outcome of the present study will be used to guide the policymakers during the implementation of governmental and private projects in order to lessen the construction project failures.

Originality/value

Construction company failure is an important aspect in developing countries like India. The limited studies were available in literature which shows failure factors for government and private firms and distinguished them. Hence, the present study extends the construction company failure literature by focusing on government and private firms. Also, the study provides some theoretical guidelines for management to avoid construction company failure in India.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 November 2013

Lu Weisheng, Anita M.M. Liu, Wang Hongdi and Wu Zhongbing

The purpose of this paper is to attempt to shed light on procurement innovation by examining two state-of-the-art procurement systems in China – an agent-construction system (ACS…

4967

Abstract

Purpose

The purpose of this paper is to attempt to shed light on procurement innovation by examining two state-of-the-art procurement systems in China – an agent-construction system (ACS or in Chinese Dai Jian Zhi) and public-private partnership (PPP), with special consideration given to the systems’ particular political, economic, social, technological, environmental, and legal (PESTEL) background.

Design/methodology/approach

The paper does so by using content analyses, semi-structured interviews, and a “PESTEL-Procurement Innovation” framework.

Findings

It is found that PPP has not been as popular as expected, while the ACS, which is little known to the international construction management community, is widespread in China. The study of ACS and PPP further reveals that congruence between a procurement system and its external PESTEL conditions is essential for procurement innovation.

Research limitations/implications

The “PESTEL-Procurement Innovation” framework could be a useful tool for devising procurement innovation; although there are many questions yet to be answered by further research.

Practical implications

The paper provides useful insights into procurement innovation, particularly when governments worldwide are searching for innovative procurement systems to help deliver public projects and services.

Originality/value

The paper possesses originality in that it tackles procurement innovation, an area that is under researched in construction management. It exhorts the re-connection between a procurement system and its external PESTEL conditions for devising bona fide procurement innovations.

Details

Engineering, Construction and Architectural Management, vol. 20 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 March 2021

Rui Jiang, Chengke Wu, Xiang Lei, Ammar Shemery, Keith D. Hampson and Peng Wu

The government plays a critical role in driving building information modeling (BIM) implementation. The purpose of this study is to investigate the government efforts for driving…

2002

Abstract

Purpose

The government plays a critical role in driving building information modeling (BIM) implementation. The purpose of this study is to investigate the government efforts for driving BIM implementation in three benchmark countries, namely, Singapore, the UK and the US, so as to develop appropriate roadmaps for increasing BIM implementations in other countries.

Design/methodology/approach

This study performs a review on the government efforts and roles in BIM implementation in three benchmark countries, namely, Singapore, the UK and the US.

Findings

Through cross comparison with existing literature, it is found that Singapore and the UK adopt a government-driven approach and a phase-by-phase development pattern is observed. The first phase focuses on the building sector to rapidly increase the use of BIM and the government generally plays the role of an initiator. In the second phase, BIM is expanded to other implementation areas, e.g. smart city. The importance of the initiator role decreases and more attention is paid to supporting roles such as researcher, educator and regulator. In contrast, an industry-driven approach is adopted in the US. The main role of the government is that of a regulator, with research institutions actively supporting the BIM implementation.

Research limitations/implications

General roadmaps of the two mandating approaches are presented. The results can provide a useful reference for countries and regions that intend to develop roadmaps to increase their BIM maturity level and enhance readiness to accept and implement BIM.

Originality/value

This study is one of the first studies that investigate the step-by-step roadmaps for implementing BIM from the perspective of changing government roles.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 49000