Search results

1 – 10 of 19
Open Access
Article
Publication date: 8 February 2021

Eryk Głodziński

The purpose of this paper is to discuss contemporary knowledge relevant to the application of performance measurement (PMe) in the concept of OPM and to compare findings from a…

1666

Abstract

Purpose

The purpose of this paper is to discuss contemporary knowledge relevant to the application of performance measurement (PMe) in the concept of OPM and to compare findings from a literature review with solutions recommended for utilization by managers from general contractors operating in Poland. There are few studies related to the mentioned topic, much fewer describing the geographical area of Eastern Europe.

Design/methodology/approach

Triangulation of research methods was selected. First literature review, next desk research and finally descriptive statistical analysis and interview were conducted. The research methods were applied in three steps whose beginnings overlapped and the mid-term findings from one study complemented others.

Findings

PMe should be focused on management and governance issues. Its evaluation is related to various organizational levels (permanent organization, portfolio, program, project, construction site and supply chain), most of them are under valuated by practitioners. The conducted study pointed out that there are numerous supporting tools and measures applicable in organizational project management (OPM). The managers recommend combining various tools in one comprehensive OPM system, to limit multiple manual incorporations of the same data to the various databases. The managers call to increase the practical usefulness of researchers’ proposals, to educate the construction managers in the application of complex performance systems and to promote portfolio thinking.

Originality/value

The comparison of performance measurement solutions proposed by academia with experience collected from Polish construction managers could support the better application of theoretical ideas in practice.

Details

Measuring Business Excellence, vol. 25 no. 3
Type: Research Article
ISSN: 1368-3047

Keywords

Open Access
Article
Publication date: 19 October 2021

Veronica Johansson and Jörgen Stenlund

Representations of time are commonly used to construct narratives in visualisations of data. However, since time is a value-laden concept, and no representation can provide a…

1621

Abstract

Purpose

Representations of time are commonly used to construct narratives in visualisations of data. However, since time is a value-laden concept, and no representation can provide a full, objective account of “temporal reality”, they are also biased and political: reproducing and reinforcing certain views and values at the expense of alternative ones. This conceptual paper aims to explore expressions of temporal bias and politics in data visualisation, along with possibly mitigating user approaches and design strategies.

Design/methodology/approach

This study presents a theoretical framework rooted in a sociotechnical view of representations as biased and political, combined with perspectives from critical literacy, radical literacy and critical design. The framework provides a basis for discussion of various types and effects of temporal bias in visualisation. Empirical examples from previous research and public resources illustrate the arguments.

Findings

Four types of political effects of temporal bias in visualisations are presented, expressed as limitation of view, disregard of variation, oppression of social groups and misrepresentation of topic and suggest that appropriate critical and radical literacy approaches require users and designers to critique, contextualise, counter and cross beyond expressions of the same. Supporting critical design strategies involve the inclusion of multiple datasets and representations; broad access to flexible tools; and inclusive participation of marginalised groups.

Originality/value

The paper draws attention to a vital, yet little researched problem of temporal representation in visualisations of data. It offers a pioneering bridging of critical literacy, radical literacy and critical design and emphasises mutual rather than contradictory interests of the empirical sciences and humanities.

Details

Journal of Documentation, vol. 78 no. 1
Type: Research Article
ISSN: 0022-0418

Keywords

Open Access
Article
Publication date: 2 October 2023

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Godspower C. Amadi and Okechukwu Dominic Saviour Duru

In most developing countries, indigenous emerging construction contractors (ECCs) face severe problems of not adopting a project management framework (PMF) in their business…

Abstract

Purpose

In most developing countries, indigenous emerging construction contractors (ECCs) face severe problems of not adopting a project management framework (PMF) in their business activities. It has increased their business risk and threatened their sustainability. Studies showed that government policy support (GPS) helps mitigate business risks. Thus, there is a paucity of literature concerning GPS on emerging Nigerian construction contractors' business sustainability. Therefore, the paper aims to investigate the moderating effect of GPS on the relationship between PMF and ECCs in Nigeria.

Design/methodology/approach

SmartPLS was used to analyse the collected data from the useable 310 questionnaires retrieved from respondents in Abuja and Lagos, Nigeria. Systems Theory was used to support the developed framework.

Findings

Findings show that government policy support significantly moderates the relationships between PMF and ECCs in the Nigerian construction sector. It implies that the study's results offer more understanding regarding issues affecting construction entrepreneurs' sustainable business cycle via applying PMF to mitigate business sustainable associated risks.

Practical implications

The study will stir Nigeria's ECCs and policymakers to promote construction business sustainability for a new entrepreneur, emphasising business risk management via PMF and GPS to enhance the sustainable business cycle.

Originality/value

The research (PMF and GPS) is strategies to enhance ECCs business sustainability in the Nigerian construction sector and other developing countries with similar political and economic attributes. Besides the study guiding old and intending ECCs and policymakers in the developing countries industries, it would contribute to bridge the theoretical gap regarding PMF and ECC, especially ECCs in developing countries with similar business sustainability issues.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 16 October 2017

Muhammad Ali Memon, Mohamed Hedi Karray, Agnès Letouzey and Bernard Archimède

In difficult geographical zones (mountain, intra-cities areas, etc.), many shippers, from small and medium enterprises to individuals, may demand delivery of different food…

2847

Abstract

Purpose

In difficult geographical zones (mountain, intra-cities areas, etc.), many shippers, from small and medium enterprises to individuals, may demand delivery of different food products (fresh, refrigerated, frozen, etc.) in small quantities. On the other side, carrier companies wish to use their vehicles optimally. Taking into account the perishability constraints (short-shelflife, temperature limits, etc.) of the transported food products and environmental constraints (pollution, carbon impact) while consolidating multiple kinds of food products to use vehicles optimally is not achieved by current transportation planning solutions. The purpose of this paper is to present an interoperable solution of a marketplace, formed by shippers and carriers, dedicated to the schedule of food transport orders.

Design/methodology/approach

This transportation planning system named Interoperable-Pathfinder, Order, Vehicle, Environment and Supervisor (I-POVES) is an interoperable multi-agent system, based on the SCEP (supervisor, customer, environment and producer) model (Archimede and Coudert, 2001). Ontologies are developed to create the planning marketplace comprising demands and offers from different sources (multiple shippers and carriers).

Findings

A hierarchy ontology for food products. A transporter system ontology. A global ontology that contains all shared concepts used by local ontologies of both shippers and carriers. I-POVES an interoperable model, which facilitates collaboration between carriers and their shippers through its active agents.

Practical implications

I-POVES is tested on a case study from the TECCAS Poctefa project, comprising transport and food companies from both sides of the Pyrenees (France and Spain).

Originality/value

There has been much work in the literature on the delivery of products, but very few on the delivery of food products. Work related to delivery of food products focuses mostly on timely delivery for avoiding its wastage. In this paper, constraints related to food products and to environment (pollution and carbon impact) of transport resources are taken into account while planning the delivery.

Details

Industrial Management & Data Systems, vol. 117 no. 9
Type: Research Article
ISSN: 0263-5577

Keywords

Open Access
Article
Publication date: 20 March 2023

Adriano Rehder, João Valsecchi Souza, Roberto Marx and Mario Sergio Salerno

Agile methods are increasingly being applied in the contexts of innovation beyond traditional information technology (IT) and physical product development projects, such as when…

2197

Abstract

Purpose

Agile methods are increasingly being applied in the contexts of innovation beyond traditional information technology (IT) and physical product development projects, such as when process improvements are being implemented. Nevertheless, this phenomenon is still recent and little addressed in the literature, with few descriptions of empirical cases. This study aims to address this gap.

Design/methodology/approach

This multiple case study aims to present and discuss the application of Agile practices embedded in large companies’ innovation value chains, focusing on improvements of business processes. The following research question is pursued: How are large companies applying elements of Agile methods to their innovation processes when implementing incremental improvements in their operational processes? Based on the idea that the Agile-Stage-Gate model is an alternative to this challenge, this study investigates the application of this hybrid model in two large Brazilian companies by presenting their idiosyncrasies, lessons learned, adaptations, challenges and benefits.

Findings

Overall, it was observed that the experience with the application of the Agile-Stage-Gate model is positive for these companies, with better customer engagement, easier project control and increased productivity of the project team.

Originality/value

For those aiming to implement the Agile-Stage-Gate model, this paper identifies the main adaptations made in order to combine the purist approaches and critical success factors for its implementation.

Open Access
Article
Publication date: 28 February 2023

Anna Trubetskaya, Olivia McDermott and Anthony Ryan

This paper outlines how Design for Lean Six Sigma methods aided a medical device manufacturing company in developing a new strategic space management and approval process for its…

2224

Abstract

Purpose

This paper outlines how Design for Lean Six Sigma methods aided a medical device manufacturing company in developing a new strategic space management and approval process for its manufacturing site.

Design/methodology/approach

The project demonstrates the application of the Design for Lean Six Sigma and structured Define, Measure, Analyse, Design, and Verify methodology in designing and implementing a process that enables the case study manufacturing site to improve its space utilisation and free up space.

Findings

The project was validated in one manufacturing department, and the Design for Lean Six Sigma methodology resulted in creating 15% new space for that area, with opportunities identified to free up 44.7% of the total manufacturing floor space and realise over €2.2 million cost savings as well as start to manufacture new products launched.

Research limitations/implications

The manuscript highlights for the first time how the Design for Lean Six Sigma methodology can be utilised for space utilisation and can be leveraged by other manufacturers. The current study's limitations are that it is a single-site case study application. Future longitudinal case studies on Design for Lean Six Sigma application in more manufacturing space utilisation projects would be useful. This study has implications for identifying best practices for Design for Lean Six Sigma methodology application in the device industry, thus improving the state of the art for introducing new manufacturing lines.

Originality/value

This is the first published work to utilise Design for Lean Six Sigma methodology for space utilisation in a medical device company. This review will provide medical devices and other manufacturing organisations with recommendations on utilising Design for Lean Six Sigma and design for improved space utilisation to reduce costs.

Details

The TQM Journal, vol. 35 no. 9
Type: Research Article
ISSN: 1754-2731

Keywords

Open Access
Article
Publication date: 9 November 2018

Viviane Souza Vilela Junqueira, Marcelo Seido Nagano and Hugo Hissashi Miyata

This paper aims to exemplify the use of project management tools in the scheduling of aircraft maintenance activities. This process is known as maintenance, repair and overhaul…

6662

Abstract

Purpose

This paper aims to exemplify the use of project management tools in the scheduling of aircraft maintenance activities. This process is known as maintenance, repair and overhaul and it has gained importance within the aeronautical sector due to its expected growth in the coming years; however, it also faces increasing competitiveness in its market. This fact gives rise to the need of acting in maintenance management and seeking lower costs while maintaining the quality of the service provided. The purpose of this paper is to propose the structuring of a procedure that aims to reduce the total maintenance time (downtime) and guarantee the delivery of the aircraft on time.

Design/methodology/approach

The paper, through a case study at a Brazilian aircraft maintenance center, used critical path method and critical chain project management, the latter being derived from the theory of constraints, with the purpose of analyzing resources systematically and synchronizing the activities in the precedence network.

Findings

As a result, it is shown that downtime can be reduced from 11 to 5 days and improvements are proposed to achieve greater market competitiveness.

Originality/value

This paper demonstrates the competitive advantage that resulted from the application of project management tools in the aircraft maintenance planning and execution.

Details

Revista de Gestão, vol. 27 no. 1
Type: Research Article
ISSN: 2177-8736

Keywords

Open Access
Article
Publication date: 7 September 2020

Paolo Canonico, Ernesto De Nito, Vincenza Esposito, Mario Pezzillo Iacono and Gianluigi Mangia

In this paper, we depart from extant conceptualisations of knowledge translation mechanisms to examine projects as a way to achieve effective knowledge transfer. Our empirical…

1836

Abstract

Purpose

In this paper, we depart from extant conceptualisations of knowledge translation mechanisms to examine projects as a way to achieve effective knowledge transfer. Our empirical analysis focused on a university–industry research project in the automotive industry.

Design/methodology/approach

The empirical analysis was based on a qualitative investigation. We analysed material collected within a research project involving a partnership between two universities and Fiat-Chrysler Automotive (FCA), a multi-brand auto manufacturer with a product range covering several different market segments. We used three data collection techniques: internal document analysis, participant observation and semi-structured interviews.

Findings

Our findings show that, in a U-I research project, goals represent a key dimension to support knowledge translation. Defining the goal implies an ongoing negotiation process, where researchers and company employees work together, in order to converge towards a shared meaning of the goal. In this sense, goal orientation and goal-based interaction have significant implications for knowledge translation processes.

Originality/value

Studies to date have focussed on the concept of knowledge translation as a way to contextualise the transfer from the source of knowledge to the receiver and to interpret the knowledge to be exchanged. This study expands the understanding of knowledge translation mechanisms in university–industry research settings. It investigates the concept of projects as powerful knowledge translation mechanism in a dynamic and longitudinal perspective. Our contribution provides insight, reflecting on how the use of projects may represent a way to facilitate knowledge transfer and build up new ideas and solutions.

Details

Management Decision, vol. 58 no. 9
Type: Research Article
ISSN: 0025-1747

Keywords

Open Access
Article
Publication date: 16 November 2015

Pablo Ballesteros-Pérez, Maria Luisa del Campo-Hitschfeld, Manuel Alejandro González-Naranjo and Mari Carmen González-Cruz

Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The…

10134

Abstract

Purpose

Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze the influence of climate on standard construction work activities through a case study.

Design/methodology/approach

By studying the extent at which some weather variables impede outdoor work from being effectively executed, new maps and tables for planning for delays are presented. In addition, a real case regarding the construction of several bridges in southern Chile is analyzed.

Findings

Few studies have thoroughly addressed the influences of major climatic agents on the most common outdoor construction activities. The method detailed here provides a first approximation for construction planners to assess to what extent construction productivity will be influenced by the climate.

Research limitations/implications

Although this study was performed in Chile, the simplified method proposed is entirely transferable to any other country, however, other weather or combinations of weather variables could be needed in other environments or countries.

Practical implications

The implications will help reducing the negative social, economic and environmental outcomes that usually emerge from project delays.

Originality/value

Climatic data were processed using extremely simple calculations to create a series of quantitative maps and tables that would be useful for any construction planner to decide the best moment of the year to start a project and, if possible, where to build it.

Details

Engineering, Construction and Architectural Management, vol. 22 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 10 January 2023

Anna Trubetskaya, Olivia McDermott and Seamus McGovern

This article aims to optimise energy use and consumption by integrating Lean Six Sigma methodology with the ISO 50001 energy management system standard in an Irish dairy plant…

2939

Abstract

Purpose

This article aims to optimise energy use and consumption by integrating Lean Six Sigma methodology with the ISO 50001 energy management system standard in an Irish dairy plant operation.

Design/methodology/approach

This work utilised Lean Six Sigma methodology to identify methods to measure and optimise energy consumption. The authors use a single descriptive case study in an Irish dairy as the methodology to explain how DMAIC was applied to reduce energy consumption.

Findings

The replacement of heavy oil with liquid natural gas in combination with the new design of steam boilers led to a CO2 footprint reduction of almost 50%.

Practical implications

A further longitudinal study would be useful to measure and monitor the energy management system progress and carry out more case studies on LSS integration with energy management systems across the dairy industry.

Originality/value

The novelty of this study is the application of LSS in the dairy sector as an enabler of a greater energy-efficient facility, as well as the testing of the DMAIC approach to meet a key objective for ISO 50001 accreditation.

Details

The TQM Journal, vol. 35 no. 9
Type: Research Article
ISSN: 1754-2731

Keywords

1 – 10 of 19