1 – 10 of over 1000The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service…
Abstract
Purpose
The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service provider (LSP). However, construction logistics is normally approached either as a strategic decision or as an operational issue and rarely as a tactical concern. The purpose of this study is to explore how to organize the logistics outsourcing decision at strategic, tactical and operational levels.
Design/methodology/approach
This study is performed as a single-case study within a construction corporation, containing (amongst others) a building contractor (BC) and a construction equipment rental company (CERC) offering logistics services.
Findings
The study shows that to procure construction logistics service successfully, BCs need logistics capabilities at strategic and tactical levels to maintain an alignment between the use of logistics services and operational characteristics. Simultaneously, CERC’s need to design their service offerings to correspond to the needs of the BC.
Research limitations/implications
This study builds on a single-case study of a Swedish construction corporation. Further research is needed to better understand current logistics outsourcing and development practices and how these can be improved to foster better logistics management at the project level.
Practical implications
BCs find suggestions of different logistics organization structures and suitable outsourcing arrangements. CERCs and LSPs can use the findings to understand their customers’ needs and adapt service offerings.
Originality/value
To the best of the authors’ knowledge, this study is one of the first studies of how two companies within a corporation can work together to develop construction logistics service offerings.
Details
Keywords
Lars Stehn and Alexander Jimenez
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…
Abstract
Purpose
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.
Design/methodology/approach
Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.
Findings
According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.
Originality/value
Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.
Details
Keywords
Siraj Ahmed, Jukka Majava and Kirsi Aaltonen
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…
Abstract
Purpose
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.
Design/methodology/approach
A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).
Findings
The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.
Originality/value
Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.
Details
Keywords
Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…
Abstract
Purpose
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.
Design/methodology/approach
Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.
Findings
The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.
Originality/value
A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.
Details
Keywords
Ornella Tanga Tambwe, Clinton Ohis Aigbavboa and Opeoluwa Akinradewo
Data represents a critical resource that enables construction companies’ success; thus, its management is very important. The purpose of this study is to assess the benefits of…
Abstract
Purpose
Data represents a critical resource that enables construction companies’ success; thus, its management is very important. The purpose of this study is to assess the benefits of construction data risks management (DRM) in the construction industry (CI).
Design/methodology/approach
This study adopted a quantitative method and collected data from various South African construction professionals with the aid of an e-questionnaire. These professionals involve electrical engineers, quantity surveyors, architects and mechanical, as well as civil engineers involved under a firm, or organisation within the province of Gauteng, South Africa. Standard deviation, mean item score, non-parametric Kruskal–Wallis H test and exploratory factor analysis were used to analyse the retrieved data.
Findings
The findings revealed that DRM enhances project and company data availability, promotes confidentiality and enhances integrity, which are the primary benefits of DRM that enable the success of project delivery.
Research limitations/implications
The research was carried out only in the province of Gauteng due to COVID-19 travel limitations.
Practical implications
The construction companies will have their data permanently in their possession and no interruption will be seen due to data unavailability, which, in turn, will allow long-term and overall pleasant project outcomes.
Originality/value
This study seeks to address the benefits of DRM in the CI to give additional knowledge on risk management within the built environment to promote success in every project.
Details
Keywords
Christopher Amoah and Hlatshwayo Nkosazana
Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study…
Abstract
Purpose
Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.
Design/methodology/approach
A quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.
Findings
The findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.
Research limitations/implications
Even though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.
Practical implications
To effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.
Originality/value
The study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.
Details
Keywords
Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…
Abstract
Purpose
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.
Design/methodology/approach
The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.
Findings
The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.
Practical implications
The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.
Originality/value
This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.
Details
Keywords
Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz
This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…
Abstract
Purpose
This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.
Design/methodology/approach
A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.
Findings
The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.
Originality/value
This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.
Details
Keywords
Henry Okpo, Dubem Ikediashi and Afolabi Dania
The rate of project failure across the globe seems to reinforce poor performance as a norm. However, engagement with construction digitalisation (CD) represents a departure point…
Abstract
Purpose
The rate of project failure across the globe seems to reinforce poor performance as a norm. However, engagement with construction digitalisation (CD) represents a departure point for improving project performance. Amidst researchers' recent empirical engagement with CD, the knowledge of the relationship model between CD and project delivery (PD) is abysmal. As a result, developing a business case for CD in developing countries has been slow due to the dearth of empirical evidence. This paper aims to investigate the influence of digitalisation on project performance.
Design/methodology/approach
Anchored on cross-sectional survey research design using a questionnaire survey in which a total of 183 copies of structured questionnaires were randomly distributed to medium- and large-sized construction firms operating in Abuja, Nigeria's federal capital. A total of 126 valid responses were received giving an overall response rate of 68.8%. The responses were analysed using mean item score, principal component analysis and multiple linear regression.
Findings
Findings from the regression analysis reveal that digitalisation has varying levels of impact on PP measured using quality, time and cost. The relationship model with time performance is weak (r = 0.526, r2 = 0.277); on cost performance, the significant model is also weak (r = 0.502, r2 = 0.252) and moderate on quality (r = 0.663, r2 = 0.439). CD influences project cost, time and quality performance despite the weak relationship model. The results indicate that the most effective benchmark of CD is quality performance.
Originality/value
This study established the relationship between digitalisation and construction PD within the construction industry context, an area lacking research attention in emerging economies. This study is the first study in emerging economies that established the influence of digitalisation on construction PD statistically.
Details
Keywords
Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva
Sources highlight that insufficient skills of site supervisors considerably influence the progress of many construction projects in numerous countries. This study intends to…
Abstract
Purpose
Sources highlight that insufficient skills of site supervisors considerably influence the progress of many construction projects in numerous countries. This study intends to identify the crucial supervisory competencies that influence the effectiveness of building project operations in the context of developing countries.
Design/methodology/approach
The crucial construction site supervisory competencies were qualitatively identified through a comprehensive literature survey and a series of expert interviews with the use of thematic analysis approaches. A questionnaire survey was then carried out among 154 building project firms to quantify the impacts of the competencies on the effectiveness of project tasks with the use of the relative importance index approach. Additionally, industry-consultative meetings were held using problem-focused communication strategies to scrutinise the necessary actions.
Findings
Overall, 22 cognitive elements and 24 skills/abilities of supervisors were determined as being critical according to their impact values, where the site supervisors cognitive domains in construction planning and construction materials were determined as the top-ranking competencies in the list, with their manual skills/abilities in labour management and labour performance evaluation. Accordingly, a group of key competency outcomes were produced for the considerations in developing new site supervisory training components. Relevant statistical analysis results and the industry consultative outcomes substantiated the validity and dependability of the overall results.
Research limitations/implications
Although the study's focus was to site supervision procedures used in Sri Lankan building construction projects, the overall findings/outcomes might be put to the test in related situations in other emerging industries in other countries.
Originality/value
The study has constructed a base that shows how the significant site supervisory competencies influence the effectiveness of building construction operations, contributing to making a big difference in the methods of reskilling/upskilling in the industry associated with construction labour, supervision, efficiency management and productivity enhancement.