Search results

1 – 10 of over 2000
Open Access
Article
Publication date: 16 May 2024

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

The sustainability of the construction industry is associated with the productivity, profitability and competitiveness of the firms, which are significantly affected by…

1164

Abstract

Purpose

The sustainability of the construction industry is associated with the productivity, profitability and competitiveness of the firms, which are significantly affected by inefficient site supervision and labour management approaches. This study aims to use a case study with mixed methods to evaluate the site supervisory characteristics in labour management, labour performance assessment and labour productivity measurement towards developing meaningful guidelines in polishing construction supervision attributes.

Design/methodology/approach

Well-developed modern apprenticeship elements were applied to 62 construction supervisors who were selected using the snowball sampling method, and their relevant competency characteristics were assessed using a comprehensively developed grading mechanism connected with useful training manuals/tools. Academic reviews, experts’ consultations and other meticulous mixed approaches were applied at different stages of the research plan’s sequential layout.

Findings

The mean performance scores of supervisors indicate proficient-level grades in the competency characteristics related to applying efficient labour management procedures and developing-level grades in designing productivity measurement tools, performing assessments on efficiency and productivity and proposing enhancement practices on efficiency and productivity for site operations. The findings point to a modern generalised guideline that establishes the ranges of supervisory attributes within the scope of the study. The validity, reliability, adaptability and generalisability of the findings were assured by using pertinent statistical tests and professional assessments.

Research limitations/implications

Though the study’s conclusions/findings are primarily applicable to the construction environment of a developing country comparable to the Sri Lankan context, they will considerably impact current/future industrial practices in various other countries and emerging industries.

Originality/value

The research has produced a conceptualised modern tool that guides determining the capacity levels of supervisory attributes for carrying out labour management, labour performance assessment and labour productivity measurement aspects in construction. The research has opened a pump that inflows new values of highly workable supervision features for strengthening the site management structures and filling the industry’s knowledge vacuum in the methodical execution of apprenticeships.

Details

Journal of Responsible Production and Consumption, vol. 1 no. 1
Type: Research Article
ISSN: 2977-0114

Keywords

Open Access
Article
Publication date: 18 July 2022

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Past studies highlight a wide range of labour-related problems resulting in productivity loss in the construction industry of many developing countries. This study aims to…

4958

Abstract

Purpose

Past studies highlight a wide range of labour-related problems resulting in productivity loss in the construction industry of many developing countries. This study aims to quantify the impacts of labour-related factors on the productivity of construction operations in Sri Lankan building projects based on the viewpoint of engineers and construction managers for upgrading management/organisational policies and practices.

Design/methodology/approach

Qualitative and quantitative approaches were used to identify the critical factors. Further, a series of industry consultative discussions were conducted through problem-based communication approaches to analyse the actions required.

Findings

A total of 21 factors were determined as critical, where skills shortage, labourers’ thinking abilities, work experience, knowledge in construction works and discipline were leading in the list. The statistical tests and the experts’ discussion outcomes ensured the validity and reliability of the study findings.

Research limitations/implications

The study outcomes will contribute to finding out better ways for directing labour in the industry practices and revising organisational policies towards achieving higher productivity levels in construction operations. Though the study findings are limited to the Sri Lankan context, some findings may be tested in other developing countries in similar scenarios.

Originality/value

The study findings show why the identified factors are critical, how those influence construction practices and what actions need to be considered for addressing the industry’s productivity-related challenges. These can play a key role in upgrading the construction management practices and organisational policies to the near-future stages.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 4
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 20 May 2024

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Productivity increase is correlated with profitability, sustainability and competitiveness of the construction firms. Recent studies reveal that the primary causes of productivity…

Abstract

Purpose

Productivity increase is correlated with profitability, sustainability and competitiveness of the construction firms. Recent studies reveal that the primary causes of productivity decline are poor usage of scientific and technological advances, ineffective supervision strategies and poor apprenticeship facilities/opportunities. Accordingly, the purpose of this study was to evaluate how well construction supervisors can utilise fundamental science and technological concepts/ideas to increase the efficiency and productivity of construction activities.

Design/methodology/approach

A new strategic layout was designed with the use of potential training guide tools. Based on the designed layout, a new supervisory training programme was developed, and 62 construction supervisors were selected, trained and evaluated in line with six parts of competencies and the relevant learning domains. An assessment guide with different levels of descriptions and criteria was developed through literature analysis and expert interviews. The research tools were verified using comprehensive approaches.

Findings

The overall mean values of supervisors’ performance scores indicate proficient-level grades in the competency characteristics related to taking measurements, generating drawings/designs using manual techniques and computer-aided tools, involving Bill of Quantities (BOQ) preparations and preparing training plans/materials for improving the competencies of labourers on estimation, measurements and understanding drawings. Their proficiency was notably lower in the use of information and communication technology application tools in construction tasks compared to others. The findings point to a modern generalised guideline that establishes the ranges of supervisory attributes associated with science and technology-related applications.

Research limitations/implications

The study outcomes produce conceptualised projections to restructure and revalue the job functions of various working categories by adding new definitions within the specified scope. This may result in constructive benefits to upgrading the current functions associated with urbanisation, sustainability and society. The implementation of the study’s findings/conclusions will have a significant impact on present and future practices in other developing nations and developing industries, even if they are directly applicable to the Sri Lankan construction industry.

Originality/value

Up to certain limits/stages, the study fills not only the knowledge gap in the field of creating protocols and application techniques connected to lifelong learning and skill enhancement/upgrading but also the existing gaps in work attributes and roles of construction supervisors associated with the utilisation of fundamental science and technological concepts/ideas towards reinforcing sustainable and productive site operations.

Details

Urbanization, Sustainability and Society, vol. 1 no. 1
Type: Research Article
ISSN: 2976-8993

Keywords

Open Access
Article
Publication date: 15 November 2022

Cathal Ryan, Darragh Faherty, John P. Spillane, Jim G. Bradley, Mohamed Issa and Elma McMahon

To examine the perspective of third-level university students in the context of the value proposition of construction apprenticeships in Ireland.

1437

Abstract

Purpose

To examine the perspective of third-level university students in the context of the value proposition of construction apprenticeships in Ireland.

Design/methodology/approach

The research uses a qualitative method, conducting semi-structured interviews with 20 third-level university students enrolled on a Bachelor of Science (Honours) degree program in Construction Management in Ireland.

Findings

The results highlight six themes. These include that society appears to be directly and/or indirectly steering students towards university. This is driven by what appears to be a prevailing stigma in that apprenticeships are not seen as an achievement by society. Also, apprenticeships are seen as a limited career choice, while also being one which appears to repel female entrants.

Practical implications

If the shortage of new skilled workers entering the construction industry continues, construction organisations will not have the necessary resources to tender for, and subsequently, complete new work.

Social implications

The perception of what could have been seen as potential new apprenticeship entrants, but ultimately chose university, is worth examining further with a view to industry addressing the shortcomings identified. This therefore can provide an opportunity to stem the tide of reducing apprenticeship numbers, while also providing a viable alternative to university for those who wish to pursue alternative routes of entering the sector.

Originality/value

The paper uniquely focuses on the third-level university student's perspectives and what influenced their decision to pursue third-level university education over that of an apprenticeship within the built environment; an area which has yet to be investigated.

Details

Higher Education, Skills and Work-Based Learning, vol. 13 no. 1
Type: Research Article
ISSN: 2042-3896

Keywords

Open Access
Article
Publication date: 24 November 2022

Eleni Papadonikolaki, Algan Tezel, Ibrahim Yitmen and Per Hilletofth

Rapid advancements in blockchain technology transform various sectors, attracting the attention of industrialists, practitioners, policymakers and academics, and profoundly affect…

2337

Abstract

Purpose

Rapid advancements in blockchain technology transform various sectors, attracting the attention of industrialists, practitioners, policymakers and academics, and profoundly affect construction businesses through smart contracts and crypto-economics. This paper explores the blockchain innovation ecosystem in construction.

Design/methodology/approach

Through a qualitative study of 23 diverse interviewees, the study explores how open or closed the blockchain innovation ecosystem in construction is and who its emerging orchestrators are.

Findings

The data showed that construction aims towards an open innovation blockchain ecosystem, although there are elements of hybridisation and closedness, each system pointing out to different orchestrators.

Practical implications

The study has implications for governments and large companies in construction, showing that open innovation initiatives need to be encouraged by policymakers through rules, regulations and government-sponsored demonstrator projects.

Social implications

The data showed that there is lack of readiness for business model change to support open innovation blockchain ecosystems in construction.

Originality/value

This is the first study applying the open innovation theory in the construction industry and sheds light into the phenomenon of blockchain, suggesting routes for further democratisation of the technology for policymakers and practitioners.

Details

Industrial Management & Data Systems, vol. 123 no. 2
Type: Research Article
ISSN: 0263-5577

Keywords

Open Access
Article
Publication date: 9 November 2023

Abdulmohsen S. Almohsen, Naif M. Alsanabani, Abdullah M. Alsugair and Khalid S. Al-Gahtani

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the…

Abstract

Purpose

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the quality of the owner's estimation for predicting precisely the contract cost at the pre-tendering phase and avoiding future issues that arise through the construction phase.

Design/methodology/approach

This paper integrated artificial neural networks (ANN), deep neural networks (DNN) and time series (TS) techniques to estimate the ratio of a low bid to the OEC (R) for different size contracts and three types of contracts (building, electric and mechanic) accurately based on 94 contracts from King Saud University. The ANN and DNN models were evaluated using mean absolute percentage error (MAPE), mean sum square error (MSSE) and root mean sums square error (RMSSE).

Findings

The main finding is that the ANN provides high accuracy with MAPE, MSSE and RMSSE a 2.94%, 0.0015 and 0.039, respectively. The DNN's precision was high, with an RMSSE of 0.15 on average.

Practical implications

The owner and consultant are expected to use the study's findings to create more accuracy of the owner's estimate and decrease the difference between the owner's estimate and the lowest submitted offer for better decision-making.

Originality/value

This study fills the knowledge gap by developing an ANN model to handle missing TS data and forecasting the difference between a low bid and an OEC at the pre-tendering phase.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 22 July 2024

Michael Chuba Okika, Andre Vermeulen and Jan Harm Christiaan Pretorius

This study aims to comprehensively identify supply chain risks and their causes, the factors influencing supply chain management and techniques to successfully mitigate and…

Abstract

Purpose

This study aims to comprehensively identify supply chain risks and their causes, the factors influencing supply chain management and techniques to successfully mitigate and control supply chain risks in construction projects. This study developed a comprehensive framework showing various supply chain risks and how these risks that influence project execution are systematically identified and managed for the overall construction project success.

Design/methodology/approach

The research conducted was characterised by its descriptive, exploratory and quantitative nature. The collection of quantitative data was conducted by means of structured online questionnaires. The sample consisted of 205 construction project professionals who were selected randomly. This group included individuals with various roles in the construction industry, such as project managers, civil/structural engineers mechanical engineers, risk managers, architects, quantity surveyors, electrical engineers, construction managers, health, safety and environment managers, estate managers and other professionals. All participants were actively involved in construction projects located in the Gauteng province of South Africa. The data was analysed, using descriptive statistical methods, including factor analysis, reliability assessment and calculations of frequencies and percentages.

Findings

The result showed that predictable delivery, funding schedule, inventories, balanced demands, production capabilities, timely procurement, construction supply chain management coordination, delivery reliability, the proximity of suppliers, identification of supply chain risks in the conceptualisation stage of a project, identification of supply chain risks in the planning stage of a project, identification of supply chain risks in the execution stage and the reconciliation of material flows of the subcontractors with the contractors were identified as the key factors that influenced the construction supply chain management the most. The result also showed that subcontractor’s negative attitudes towards supply chain management, procurement delays, imbalanced demands, clients’ negative attitudes towards other project stakeholders, unpredictable delivery reliability, disorganised construction supply chain management approach, delayed funding, low delivery reliability, poor inventories, poor construction supply chain co-ordination, suppliers’ negative attitudes towards supply chain management and when the material flows of the subcontractors with the contractors are not reconciled were identified as the factors that have the greatest impacts on construction supply chain risks management.

Research limitations/implications

For future research, it is recommended to incorporate fourth industrial revolution) such as machine learning prediction models and algorithms, Artificial intelligence and blockchain to identify and manage supply chain, supply chain risks and project stakeholders involved in supply chain in construction projects. Green construction or sustainable construction was not fully covered in this study. The findings will be beneficial for sustainable construction projects in developing countries for sustainability, although it did not extensively cover green buildings and related risks.

Practical implications

Supply chain risk is one of the major challenges facing the construction industry because construction projects are complex by nature involving a lot of activities and participants with different responsibilities and tasks therefore it is highly recommended to implement the proposed frameworks in this paper from the conceptualisation stage to the execution stage, carefully identifying parties involved in supply chain, supply chain management, stakeholders, tasks, activities, responsibilities and supply chain risks generated as a result of the interactions between stakeholders involved in supply chain management and coordination to realise project objectives. The findings will be a foundation for identifying and managing supply risks in sustainable buildings in developing countries.

Social implications

Supply chain management is crucial in every enterprise. Managing supply chain risks is a major aspect of risk and disaster management and this implies that supply chain excellence is achievable by building communication, trust and mutual objectives, no blame culture, performance measurement, constant improvement and partnering.

Originality/value

The implementation of construction supply chain risk management framework involves assessing the impacts of these supply chain risks on the objectives of construction projects with respect to time, cost, safety, health, environment, stakeholders, financial performance, client satisfaction and quality.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Book part
Publication date: 1 May 2019

Oluseun Olubajo, Will Hughes and Libby Schweber

The purpose of the study is to explore the dominant ideas in research on the management of time in construction. The focus of research has been to improve techniques for…

Abstract

Purpose

The purpose of the study is to explore the dominant ideas in research on the management of time in construction. The focus of research has been to improve techniques for optimising the timing and sequence of activities.

Design/Methodology/Approach

A critical review of research on construction time management, challenging the typical focus. We examine the assumptions different authors make, underline the limitations of the dominant research approaches and examine the prospects for developing a new approach to researching these issues.

Findings

The dominant approach in literature focuses on unique activity traits in construction planning and measurable patterns between time-related variables. This assumes that time in construction can be managed by changing the way activities are calculated. These approaches have not been correlated with improvement in performance. Social practice theory may help to explain how programmes figure as one of many objects used during construction.

Research Limitations/Implications

The focus is on reviewing indicative literature from key journals in construction management. The implication is that research is needed about how such documents are used in practice, which goes further than optimising plans in theory.

Practical Implications

Future research could focus on understanding the context of construction planning practice and shift the debate from a focus on optimisation to practice.

Originality/Value

An interpretivist approach with a focus on how tools such as planning documents are used on site. Social practice theory may provide a clearer explanation of the place of construction planning within the practice of construction management. This could provide solutions that deal effectively with stakeholder expectations around timely completion of construction projects.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 11 February 2022

Oluseyi Julius Adebowale and Justus Ngala Agumba

Labour productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades. Although several scholarly research projects…

3496

Abstract

Purpose

Labour productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades. Although several scholarly research projects have been conducted to salvage the prevalent low labour productivity in construction, contractors in the construction industry have continued to grapple with the devastating impact of low productivity. The purpose of this study is to determine key areas of focus necessary to promote productivity growth in construction.

Design/methodology/approach

Bibliometric and scientometric assessments were conducted to map the existing construction labour productivity (CLP) studies and establish key focus areas in the research domain. The keywords “Construction Productivity” OR “Construction Labour Productivity” OR “Construction Labor Productivity” OR “Construction Worker Productivity”.

Findings

Emerging trends in the CLP research field are reported. The study also determined the most productive authors and collaboration among authors, most productive journals, most active regions and publications with the highest impact in CLP research.

Research limitations/implications

Documents published in the Scopus database were considered for analysis because of the wider coverage of the database. Journal and conference articles written in English language represent the inclusion criteria, while articles in press, review, book chapters, editorial, erratum, note, short survey and data paper were excluded from analysis. The study is also limited to documents published from 2012 to 2021.

Practical implications

The study brought to the awareness of the industry practitioners and other construction stakeholders, the key knowledge areas that are critical to promoting productivity growth in construction.

Originality/value

Except bibliometric analysis, previous research studies have used different approaches to investigate productivity in construction. The study presented future research directions through the emerging knowledge areas identified in the study.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 7
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 24 November 2023

Ornella Tanga Tambwe, Clinton Ohis Aigbavboa and Opeoluwa Akinradewo

Data represents a critical resource that enables construction companies’ success; thus, its management is very important. The purpose of this study is to assess the benefits of…

Abstract

Purpose

Data represents a critical resource that enables construction companies’ success; thus, its management is very important. The purpose of this study is to assess the benefits of construction data risks management (DRM) in the construction industry (CI).

Design/methodology/approach

This study adopted a quantitative method and collected data from various South African construction professionals with the aid of an e-questionnaire. These professionals involve electrical engineers, quantity surveyors, architects and mechanical, as well as civil engineers involved under a firm, or organisation within the province of Gauteng, South Africa. Standard deviation, mean item score, non-parametric Kruskal–Wallis H test and exploratory factor analysis were used to analyse the retrieved data.

Findings

The findings revealed that DRM enhances project and company data availability, promotes confidentiality and enhances integrity, which are the primary benefits of DRM that enable the success of project delivery.

Research limitations/implications

The research was carried out only in the province of Gauteng due to COVID-19 travel limitations.

Practical implications

The construction companies will have their data permanently in their possession and no interruption will be seen due to data unavailability, which, in turn, will allow long-term and overall pleasant project outcomes.

Originality/value

This study seeks to address the benefits of DRM in the CI to give additional knowledge on risk management within the built environment to promote success in every project.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of over 2000