Search results

1 – 10 of over 2000
Article
Publication date: 15 July 2022

Guodong Ni, Qi Zhang, Yaqi Fang, Ziyao Zhang, Yaning Qiao, Wenshun Wang and Yongliang Deng

The purpose of this paper is to explore the correction mechanism of resilient safety culture on new generation of construction workers (NGCWs)' unsafe behavior and test the…

1079

Abstract

Purpose

The purpose of this paper is to explore the correction mechanism of resilient safety culture on new generation of construction workers (NGCWs)' unsafe behavior and test the multiple mediation effects of job crafting and perceived work meaningfulness based on the context of Chinese construction industry in order to find a new way to effectively correct the NGCWs' unsafe behavior.

Design/methodology/approach

A theoretical model of correction mechanism was established based on literature research and theoretical deduction. An empirical study was employed based on confirmatory factor analysis and regression analysis with a sample of 404 NGCWs in China.

Findings

The results indicated that resilient safety culture can effectively correct NGCWs' unsafe behavior through job crafting and perceived work meaningfulness. Job crafting and perceived work meaningfulness can play independent and serial mediating roles between resilient safety culture and unsafe behavior.

Research limitations/implications

Research results only represent a short-term law about the correction mechanism of NGCWs' unsafe behavior based on a questionnaire study from China's construction industry. It is necessary to continue to implement a longitudinal study to test it in a relatively long period in future research. The findings also need to be verified based on the young construction workers in other countries.

Practical implications

This study provides a theoretical basis and feasible management reference for construction enterprises in China to correct NGCWs' unsafe behavior from the perspective of resilient safety culture. Furthermore, the construction of resilient safety culture in construction enterprises can help NGCWs better carry out job crafting and perceive the meaning of work.

Originality/value

This paper clarifies the correction mechanism of resilient safety culture on unsafe behavior of NGCWs, and further tests the independent mediating roles and a serial mediating role of job crafting and perceived work meaningfulness between resilient safety culture and unsafe behavior, which fills the research gap about the influence mechanism of resilient safety culture on young construction workers' unsafe behavior and enriches the theoretical system of unsafe behavior correction of construction workers.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 October 2022

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Sources highlight that lack of systematic labour training components results in low performance and productivity of labour, which leads the construction industry of many countries…

Abstract

Purpose

Sources highlight that lack of systematic labour training components results in low performance and productivity of labour, which leads the construction industry of many countries to face various challenges. This study aims to quantify the variations in the performance and productivity levels of labour in building construction projects through the applications of effective work-based training components.

Design/methodology/approach

A comprehensive literature review and a series of experts’ discussions with action-oriented communication approaches were conducted to develop a set of practices related to labour training, performance assessment and productivity measurements within a framework. The developed practices were applied to around 100 labourers working on nine building construction projects through a construction supervisory training programme.

Findings

The study presents the detailed patterns of the significant changes in labour performance and productivity levels. The majority of trained labourers have grown to perform the work process with some relevant theoretical and operational knowledge and skills. The overall results spotlight the significant behavioural changes that can be observed in workforce operations by improving labour performance, which resulted in implementing effective labour-rewarding practices within a framework.

Research limitations/implications

Although the study findings were limited to the Sri Lankan context, the proposed practices can be applied to the industry practices of the construction sector of other developing countries and the other developing industries in similar ways/scenarios.

Practical implications

The study outcomes contribute to uplifting the work qualities of labourers with life-long learning opportunities and unlocking the potential barriers for expanding the local labour supply while controlling the excessive inclination of the local firms towards foreign labour. This paper describes further implications and future scopes of the study elaborately.

Originality/value

The study provides generalised mechanisms and practices that transform the labour characteristics and add new attributes for strengthening the values of construction supervision practices to obtain well-improved work outputs. The study outcomes reinforce the chain relationships among the training elements, labour performance and productivity levels, leading to upgrading current planning and operational management practices, especially adding constructive mechanisms in resource levelling and productivity benchmarking practices.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 8 November 2022

Junlong Peng and Xiang-Jun Liu

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined…

Abstract

Purpose

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined with nonlinear programming algorithm, study how to schedule the number of labor in each process at the minimum cost to achieve an extremely short construction period goal.

Design/methodology/approach

The method of inverse optimization is mainly used in this study. In the first phase, establish a positive optimization model, according to the existing labor constraints, aiming at the shortest construction period. In the second phase, under the condition that the expected shortest construction period is known, on the basis of the positive optimization model, the inverse optimization method is used to establish the inverse optimization model aiming at the minimum change of the number of workers, and finally the optimal labor allocation scheme that meets the conditions is obtained. Finally, use algorithm to solve and prove with a case.

Findings

The case study shows that this method can effectively achieve the extremely short duration goal of the engineering project at the minimum cost, and provide the basis for the decision-making of the engineering project.

Originality/value

The contribution of this paper to the existing knowledge is to carry out a preliminary study on the relatively blank field of the current engineering project with a very short construction period, and provide a path for the vast number of engineering projects with strict requirements on the construction period to achieve a very short construction period, and apply the inverse optimization method to the engineering field. Furthermore, a double-nested genetic algorithm and nonlinear programming algorithm are designed. It can effectively solve various optimization problems.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 July 2022

Edson Neves da Silva, Luiz Carlos Brasil de Brito Mello and Gustavo Oliveira Pinto

This paper aims to evaluate the current level of knowledge about lean construction (LC) practices in construction companies, universities and class organizations in Brazil and…

Abstract

Purpose

This paper aims to evaluate the current level of knowledge about lean construction (LC) practices in construction companies, universities and class organizations in Brazil and identify the barriers to implementing LC in the Brazilian construction industry and prioritize them through comparison with global challenges.

Design/methodology/approach

This multiple case study was carried out through a questionnaire answered by 56 construction companies, 15 universities and 10 professional associations. The questionnaire evaluation allowed the authors to determine the level of knowledge about the LC, its adoption and barriers to its adoption in the Brazilian industry. The results were statistically analyzed using the weighted average (MIS) of results using the Kruskal–Wallis test, which compares sample distribution among groups, and Cronbach’s alpha test to measure the questionnaire reliability.

Findings

This study points to universities as the main ones responsible for the low adoption of LC in Brazil and points to the need for an integrated action among construction companies, universities and class organizations to overcome the traditional project management culture and raise the level of knowledge about LC.

Originality/value

This study evaluated the current LC situation in an emerging country, Brazil, and compared it with the principal international challenges observed in studies of other developing countries – China, India, Morocco, Saudi Arabia and Singapore – least developed countries – Bangladesh and Nigeria – and developed country – UK. These studies evaluated construction companies located in the listed countries. Based on that, 22 international challenges were established for the LC adoption. Additionally, this research also evaluated universities and working-class organizations in addition to construction companies. This addition can contribute to a better result understanding that can be explored by Brazil and other countries.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 17 January 2023

Martin Evans and Peter Farrell

The modern construction industry is highly competitive and cost driven, with tangible adversarial relationships between projects' contractual parties at individual and…

Abstract

Purpose

The modern construction industry is highly competitive and cost driven, with tangible adversarial relationships between projects' contractual parties at individual and organisational levels; there are conflict of interest as people to survive. Accordingly, team leaders on construction megaprojects (CMPs) in multinational engineering organisations strive to survive in such competitive markets. The research’s aim is to investigate relationships between team leaders' tenure and management styles towards professional subordinates on CMPs and elaborate how corporate governance can optimally address this conflict of interest and adversarial relationships.

Design/methodology/approach

The research methodology adopted processes of inducting theory using case studies. A qualitative approach was adopted as a primary data collection and analysis source. It involved case studies through primary data collection in semi-structured face-to-face interviews with 38 professional subordinates (interviewees) to discuss impacts of team leaders' tenure on their management style (a five-team leader, case studies). The research methodology is based on building theories from case study grounded theory research methodologies.

Findings

The research introduced the notion that team leader survival syndrome is pronounced and evidenced by adversarial reactions towards new or experienced professional subordinates where team leaders perceive professional subordinates, especially at senior technical levels, as potential risks that jeopardise their positions and employment survival possibilities. The syndrome is proven based on real-life case studies; it is constant, tangible and serious disorder of attitudes and behaviours. Longer tenure stimulates and accelerates these phenomena and syndrome, with 58% of team leaders exhibiting such syndromes. Optimum employee tenure is between 7 and 10 years. Corporate governance provides good resolution practices.

Research limitations/implications

The research implications are useful to construction industry and academia. However, the analysis is limited to the case studies considered in Canada and Qatar. Due to small sample size for both case studies and respondents to the questionnaire survey, it is recommended for future exploration to expand the scope of research to larger sample size and various demographic and geographical locations.

Practical implications

Corporates should acknowledge the presence of team leader survival syndromes. They should thoroughly investigate sociopolitical relationships behind it and seek to understand consequences on professional subordinates. Corporates should also adopt a 360-degree feedback system; they should limit trust given to team leaders in this regard to responsible trust, to eliminate manipulation. Team leaders are perceived as being not always truthful and misrepresent capabilities and performance of their professional subordinates to senior managers. Corporate governance holistic multidimensional perspectives are required to provide resolutions of team leader survival syndromes.

Originality/value

The research has discovered a phenomenon that team leaders on CMPs in architecture, engineering and construction (AEC) organisations, prompted by virtue of long tenure in corporates or by power of their managerial level in organisations, perceive their professional subordinates, especially senior technical employees, as potential risks. It is thought promoting them would put their own positions and security of tenure at risk. Hence, team leaders act adversarially, to enhance their own survival prospects. This research introduced the novel team leader survival syndrome and introduced analyses, practical implications and recommendations.

Article
Publication date: 28 July 2023

Mohammad Omar Aburumman, Rateb Sweis and Ghaleb J. Sweis

The construction industry sector is developing rapidly, especially with the increasing pace of the Fourth Industrial Revolution in this sector. Construction projects can benefit…

Abstract

Purpose

The construction industry sector is developing rapidly, especially with the increasing pace of the Fourth Industrial Revolution in this sector. Construction projects can benefit from greater integration and collaboration between their technologies and processes to reap the advantages and keep pace with the recent significant technological and managerial techniques developments. Therefore, this study aims to delve into and investigate building information modeling (BIM) and Lean Construction (L.C.) with a concentration on the potential BIM–lean interactions synergy and integration in the Jordanian construction industry.

Design/methodology/approach

This study takes exploratory nature, followed by the deductive research approach, and is designed to be a mono-quantitative research methodology. Moreover, the sampling technique is non-probability convenience sampling, and the research strategy is implemented through a questionnaire used and analyzed by using Statistical Package for Social Science to conduct descriptive and inferential statistical analysis and verify the reliability and validity through proper tests.

Findings

The BIM–lean interactions synergy and integration findings revealed that eliminating waste (time, cost, resources), promoting continuous improvement (Kaizen) and standardizing as lean construction principles are the most significant and agreeable toward achieving BIM–lean interactions synergy. On the other hand, “High 3D Visualization Modelling” was the most significant BIM function, followed by “Rapid and Auto-Generation of Documents and Multiple Design Alternatives” and “Maintenance of Information and Design Model Integrity.” Moreover, based on the relative importance index (RII) values, “Lack of Technical Expertise in BIM-LEAN” is the most significant challenge with a 0.89 value of RII, followed by “Lack of Government Direction and Standard Guidelines” with a 0.88 value of RII and “Financial considerations” with a 0.83 value of RII.

Originality/value

This study will help provide a new detailed overview that investigates the effects and expected benefits of integrating BIM processes and technological functionalities with lean construction principles within a synergetic environment. Moreover, the study will increase the awareness of using new technologies and management approaches in the architectural, engineering and construction industry, seeking to achieve integration between these technologies to reach ideal results in terms of the outputs of construction operations.

Details

International Journal of Lean Six Sigma, vol. 15 no. 2
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 23 August 2022

Mohammad Nafe Assafi, Md. Mehrab Hossain, Nicholas Chileshe and Shuvo Dip Datta

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a…

Abstract

Purpose

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a framework that will diminish manual labor, reduce human error and apply four-dimensional (4D) building information modeling (BIM)-based solutions to mitigate and prevent construction project delays.

Design/methodology/approach

First, a systematic literature review was conducted on analyzing the construction delay scenario in the context of Bangladesh and other countries. Next, a 4D BIM-based framework was developed using Autodesk Navisworks Manage. Finally, it was used to run on-site simulations on an ongoing construction project which faced delays because of design errors and inefficient planning.

Findings

Affirmative results were found from applying these methods through real-time project simulation. The current status of the project and the status after using BIM technology were compared. It was observed that during both the preconstruction and execution phases, the application of 4D BIM could reduce the delay posed by design error and inefficient planning.

Practical implications

The project manager and the design engineers can use these frameworks to review their projects. For the design engineers, the preconstruction phase portion of the framework will help identify the probable errors in the design. For the project managers, keeping track of time using the execution phase portion of the framework will be resourceful.

Originality/value

To the best of the authors’ knowledge, this study is the first to assess the significant delay factors endemic in Bangladesh and develop a BIM-based technological solution. This study is solely dedicated to reforming the construction techniques in Bangladesh through the application of 4D BIM technology.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 6 July 2022

Klara Granheimer, Tina Karrbom Gustavsson and Per Erik Eriksson

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the…

Abstract

Purpose

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the uncertainties. Despite that, studies on the public procurement of engineering services are scarce. Although scholars have shown that uncertainty may affect the choice of control modes, the level of uncertainty that characterises services is not addressed by the two task characteristics: knowledge of the transformation process and output measurability. The purpose is to investigate organisational control in public procurement of engineering services.

Design/methodology/approach

The existing control model was adjusted in this study by conceptually adding uncertainty as a third aspect to the two task characteristics. A single case study of the Swedish Transport Administration was used. The empirical data, comprising 14 interviews with managers from the client and engineering consulting companies, were analysed using flexible pattern matching and visual mapping approaches and then illustrated using the model.

Findings

The public client did not base its choice of control modes on uncertainty, but rather on the other two task characteristics. Consequently, the service providers argued that the chosen control modes reduced their creativity, increased their financial risks and caused unclear responsibilities. This study therefore shows that uncertainty is an important factor to consider in the choice of control modes, both from a theoretical perspective and from the service providers' point of view. The developed model may therefore be useful for researchers as well as practitioners.

Originality/value

This study is the first attempt to add uncertainty as a task characteristic when choosing control modes. The results contribute to the scarce control literature regarding the procurement of engineering services for construction projects and the procurement of other services with high uncertainty.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 July 2023

Haitham Alajmani, Salma Ahmed and Sameh Monir El-Sayegh

This paper aims to measure the severity, frequency and importance of the factors causing delays in the United Arab Emirates (UAE) construction industry following the Covid-19…

Abstract

Purpose

This paper aims to measure the severity, frequency and importance of the factors causing delays in the United Arab Emirates (UAE) construction industry following the Covid-19 pandemic onset. The study also measures the likelihood of the effects caused by these delays.

Design/methodology/approach

A mixed approach of both qualitative and quantitative. Literature review was conducted to extract 40 factors of delays and 10 effects of delays. A survey was then administered to construction professionals in the UAE to collect the perceptions on the severity and frequency of factors of the causes of delays using a Likert Scale of 1–5 where 1 represented very low and 5 represented very high. Similarly, the respondents were also asked to rate the likelihood of the occurrence of the effects of the delays based on a Likert scale of 1–5 as well. Furthermore, Spearman’s rank correlation was also conducted to compute the level of agreement between the different parties; owner, consultants and contractors.

Findings

The results revealed that the top five factors of delays include: award the project for the lowest bidder, delay in progress payment, change orders by the owner, poor subcontractor performance and inadequate planning and scheduling by the contractor. The findings of this study emphasize the financial challenges and economic crisis brought upon the construction industry due to the pandemic. Furthermore, the pandemic also shifted the perceptions of construction professionals, who are now more aware of the delays caused by awarding the project to the lowest bidder who would not have the required qualifications to conduct efficient planning and scheduling that are relevant in the case of extraordinary events such as Covid-19. Moreover, a high level of agreement between the consultants and contractors was observed, with a Spearman’s rank correlation of 0.804. Additionally, the most likely effects of delays concluded from this study were time overrun/extension and poor quality of work.

Originality/value

Literature review is very rich in the field of construction projects delays. However, there is very limited research on the impact of Covid-19 in the context of construction projects delays, and insights from construction professionals regarding this matter are particularly lacking in literature. Therefore, this paper bridges the gap in literature by providing perceptions of construction professionals on the impact of Covid-19 on the factors causing delays in the UAE construction industry. The findings of this research are expected to be an invaluable resource for future to help the construction industry heal faster when encountering similar epidemics or extraordinary events.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 29 September 2022

Junying Liu, Zhixiu Wang, Jiansheng Tang and Jingcong Song

While there is a general belief that a defective institutional environment will lead to higher compliance risk, the current state of knowledge about how the institutional…

Abstract

Purpose

While there is a general belief that a defective institutional environment will lead to higher compliance risk, the current state of knowledge about how the institutional environment affects enterprises' compliance is equivocal. This study aims to explore how does the host country's institutional environment affect the compliance risk perception of international engineering contractors and how to mitigate this impact.

Design/methodology/approach

This study empirically tests the impact of the institutional environment from the two dimensions of the institutional environment: legal completeness reflects whether the formal regulations are clear, detailed and comprehensive and legal effectiveness reflects whether rules and policies can be implemented effectively when the proper legal codes are provided. Based on 213 questionnaire data, this study uses partial least squares structural equation model (PLS-SEM) and Smart PLS software to test the hypothesis.

Findings

This study finds a negative relationship between the host country's legal completeness (LC) or legal effectiveness (LE) and a contractor's compliance risk perception. Further, the results show potential absorptive capacity (PAC) and realized absorptive capacity (RAC) of a contractor are critical for mitigating the impact of low LC in the host country, but not when LE is low.

Practical implications

The findings will be useful for international engineering contractors to respond to the compliance risk of the host country, both in choices of overseas investment locations and compliance capacity building.

Originality/value

This study reveals the impact of the host country's institutional environment on the compliance risk perception of international contractors, and provides theoretical guidance for how to alleviate the compliance barriers brought by the host country's institutional environment to international engineering contractors.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Year

Last 6 months (2509)

Content type

Article (2509)
1 – 10 of over 2000