Labor resource allocation under extremely short construction period based on the inverse optimization method

Junlong Peng (Changsha University of Science and Technology, Changsha, China)
Xiang-Jun Liu (Changsha University of Science and Technology, Changsha, China)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 8 November 2022

Issue publication date: 1 March 2024

128

Abstract

Purpose

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined with nonlinear programming algorithm, study how to schedule the number of labor in each process at the minimum cost to achieve an extremely short construction period goal.

Design/methodology/approach

The method of inverse optimization is mainly used in this study. In the first phase, establish a positive optimization model, according to the existing labor constraints, aiming at the shortest construction period. In the second phase, under the condition that the expected shortest construction period is known, on the basis of the positive optimization model, the inverse optimization method is used to establish the inverse optimization model aiming at the minimum change of the number of workers, and finally the optimal labor allocation scheme that meets the conditions is obtained. Finally, use algorithm to solve and prove with a case.

Findings

The case study shows that this method can effectively achieve the extremely short duration goal of the engineering project at the minimum cost, and provide the basis for the decision-making of the engineering project.

Originality/value

The contribution of this paper to the existing knowledge is to carry out a preliminary study on the relatively blank field of the current engineering project with a very short construction period, and provide a path for the vast number of engineering projects with strict requirements on the construction period to achieve a very short construction period, and apply the inverse optimization method to the engineering field. Furthermore, a double-nested genetic algorithm and nonlinear programming algorithm are designed. It can effectively solve various optimization problems.

Keywords

Acknowledgements

This research was funded by the General Program from Natural Science Foundation of Hunan Province (Grant no. 2021JJ30746); (Grant no. 2015JJ2004). Hunan Provincial Graduate Scientific Research and innovation Project (Grant no. CX20220871).

Disclosure statement: No potential conflict of interest was reported by the author(s).

Data availability: All data generated or analyzed during this study are included in this published article.

Code availability: Code can available from the corresponding author on reasonable request.

Citation

Peng, J. and Liu, X.-J. (2024), "Labor resource allocation under extremely short construction period based on the inverse optimization method", Engineering, Construction and Architectural Management, Vol. 31 No. 3, pp. 1254-1271. https://doi.org/10.1108/ECAM-06-2022-0604

Publisher

:

Emerald Publishing Limited

Copyright © 2022, Emerald Publishing Limited

Related articles