Search results

1 – 10 of over 20000
Article
Publication date: 1 April 2024

Frank Ato Ghansah

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the…

Abstract

Purpose

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the high complexity of accurately representing and modelling the physics behind the DTs process. This study thus organises and consolidates the fragmented literature on DTs implementation for smart buildings at the facility management stage by exploring the enablers, applications and challenges and examining the interrelationships amongst them.

Design/methodology/approach

A systematic literature review approach is adopted to analyse and synthesise the existing literature relating to the subject topic.

Findings

The study revealed six main categories of enablers of DTs for smart building at the facility management stage, namely perception technologies, network technologies, storage technologies, application technologies, knowledge-building and design processes. Three substantial categories of DTs application for smart buildings were revealed at the facility management stage: efficient operation and service monitoring, efficient building energy management and effective smart building maintenance. Subsequently, the top four major challenges were identified as being “lack of a systematic and comprehensive reference model”, “real-time data integration”, “the complexity and uncertainty nature of real-time data” and “real-time data visualisation”. An integrative framework is finally proposed by examining the interactive relationship amongst the enablers, the applications and the challenges.

Practical implications

The findings could guide facility managers/engineers to fairly understand the enablers, applications and challenges when DTs are being implemented to improve smart building performance and achieve user satisfaction at the facility management stage.

Originality/value

This study contributes to the knowledge body on DTs by extending the scope of the existing studies to identify the enablers and applications of DTs for smart buildings at the facility management stage and the specific challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 24 August 2023

Andrew Ebekozien, Wellington Didibhuku Thwala, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse…

Abstract

Purpose

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse (BPC) but with some encumbrances, especially in developing countries. There is a paucity of research on digital technologies application to prevent or mitigate BPC in Nigeria. Thus, the research aims to explore the perceived barriers that may hinder digital technologies from preventing or mitigating building collapse and recommend measures to improve technology applications during development.

Design/methodology/approach

The study is exploratory because of the unexplored approach. The researchers collected data from knowledgeable participants in digitalisation and building collapse in Nigeria. The research employed a phenomenology approach and analysed collected data via a thematic approach. The study achieved saturation at the 29th interviewee.

Findings

Findings show that lax construction digitalisation implementation, absence of regulatory framework, lax policy, unsafe fieldworkers' behaviours, absence of basic infrastructure, government attitude, hesitation to implement and high technology budget, especially in developing countries, are threats to curbing building collapse menace via digitalisation. The study identified technologies relevant to preventing or mitigating building collapse. Also, it proffered measures to prevent or mitigate building collapse via improved digital technology applications during development.

Originality/value

This research contributes to the construction digitalisation literature, especially in developing countries, and investigates the perceived barriers that may hinder digital technologies usage in preventing or mitigating building collapse in Nigeria.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 May 2023

Hongliang Yu, Zhen Peng, Zirui He and Chun Huang

The purpose of this paper is to establish a maturity evaluation model for the application of construction steel structure welding robotics suitable for the actual situation and…

113

Abstract

Purpose

The purpose of this paper is to establish a maturity evaluation model for the application of construction steel structure welding robotics suitable for the actual situation and specific characteristics of engineering projects in China and then to assess the maturity level of the technology in the application of domestic engineering projects more scientifically.

Design/methodology/approach

The research follows a qualitative and quantitative analysis method. In the first stage, the structure of the maturity model is constructed and the evaluation index system is designed by using the ideas of the capability maturity model and WSR methodology for reference. In the second stage, the design of the evaluation process and the selection of evaluation methods (analytic hierarchy process method, multi-level gray comprehensive evaluation method). In the third stage, the data are collected and organized (preparation of questionnaires, distribution of questionnaires, questionnaire collection). In the fourth stage, the established maturity evaluation model is used to analyze the data.

Findings

The evaluation model established by using multi-level gray theory can effectively transform various complex indicators into an intuitive maturity level or score status. The conclusion shows that the application maturity of building steel structure welding robot technology in this project is at the development level as a whole. The maturity levels of “WuLi – ShiLi – RenLi” are respectively: development level, development level, between starting level and development level. Comparison of maturity evaluation values of five important factors (from high to low): environmental factors, technical factors, management factors, benefit factors, personnel and group factors.

Originality/value

In this paper, based on the existing research related to construction steel structure welding robot technology, a quantitative and holistic evaluation of the application of construction steel structure welding robot technology in domestic engineering projects is conducted for the first time from a project perspective by designing a maturity evaluation index system and establishing a maturity evaluation model. This research will help the project team to evaluate the application level (maturity) of the welding robot in the actual project, identify the shortcomings and defects of the application of this technology, then improve the weak links pertinently, and finally realize the gradual improvement of the overall application level of welding robot technology for building steel structure.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 April 2022

Vuyokazi Precious Camngca, Christopher Amoah and Emma Ayesu-Koranteng

The construction industry’s daily processes demand heavy data usage and communication between project participants to meet client requirements. Thus, the application of…

2167

Abstract

Purpose

The construction industry’s daily processes demand heavy data usage and communication between project participants to meet client requirements. Thus, the application of information technology in project implementation has been increasing in the construction sector (CS) lately. However, the same cannot be seen in public sectors responsible for implementing government projects in South Africa. This study aimed to investigate the causes and effects of the underutilisation of information communication technology (ICT) in the building section of a public sector in a municipality in South Africa.

Design/methodology/approach

A qualitative approach was adopted for the study, using a public sector in one of the municipalities as a case study. Face-to-face interviews were conducted among the building unit workers, using unstructured interview questions. The data collected were analysed using the ATLAS.ti software.

Findings

The findings indicate a lack of understanding of existing and newly available ICT software and hardware technology among staff within the building technology due to lack of digitalisation in construction projects implementation, inadequate system upgrades, lack of adequate ICT resources, lack of financial resources for internet and software application subscriptions and lack of ICT training leading. The issues mentioned above have led to the outsourcing of projects professionals, slow pace of electronic emails, untrained professionals, usage of different and unlicensed software, resulting in the underutilisation of ICT within the whole building section. This change also adversely affects all officials, especially the junior officials who have graduated using the most recent ICT technology during their studies.

Research limitations/implications

The building department of only one public sector was used for the study; therefore, the findings may not be generalisable. The case study public sector’s name is withheld for confidentiality purposes.

Practical implications

Adequate change management and continuous development, combined with the allocation of proper resources, would be necessary for all staff members. Enormous investments had to be made in the ICT equipment by providing a sufficient budget in the building section of the public sectors. The building section within public sectors should provide change management to all aged skills staff by attending seminars to learn new ICT technology applied within its work environment.

Originality/value

The study established the causes of the underutilisation of ICT in the CS, especially in the public work departments and municipalities, and how this contributes to service delivery.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 27 September 2023

Huiying (Cynthia) Hou, Daniel C.W. Ho and Yung Yau

Facilities management (FM) activities affect citizens’ health and safety, long-term urban environmental sustainability and the relationships between the built and natural…

Abstract

Purpose

Facilities management (FM) activities affect citizens’ health and safety, long-term urban environmental sustainability and the relationships between the built and natural environments of cities. This study aims to comprehend the status of smart FM tools application, how they are used to improve the delivery of FM services and the barriers to their implementation.

Design/methodology/approach

To investigate the current smart solutions that leverage the quality of FM service, a case study based on the FM practice in Hong Kong was carried out. The case study was conducted in two phases of data acquisition based on a qualitative research methodology. After conducting in-depth interviews to determine the application of smart FM tools in different types of properties and to identify the initiatives and barriers to smart FM tool application, three workshops were conducted to validate the findings and further investigate the influence of FM professionals on smart FM tools application in Hong Kong.

Findings

The findings of the case study revealed, firstly, that four types of smart FM tools – user-centric, safety and hygiene, maintenance and sustainability-oriented – are used to assist the delivery of FM services. Secondly, smart FM tools are shown to be useful in assisting FM activities. Thirdly, the existing barriers to smart FM tool application manifest differently in shopping malls, office buildings and residential buildings. Fourthly, smart FM tools are used to address the four attributes of user needs: comfort, health and wellbeing, convenience and information to occupants.

Originality/value

The value of this study lies in its focus on the industry level (FM industry) and the application process of smart FM tools in different types of property, revealing the benefits, initiatives and barriers to their future application. This study provides a comprehensive picture of the current status and elaborates the barriers to smart FM tool application, which will help FM practitioners to make strategic decisions on selecting and developing smart FM tools. Also, this study will facilitate smart FM tool application policy development.

Details

Facilities , vol. 42 no. 1/2
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 6 February 2024

Chi Zhang, Kun He, Wenjie Zhang, Ting Jin and Yibin Ao

To further promote application of BIM technology in construction of prefabricated buildings, influencing factors and evolution laws of willingness to apply BIM technology are…

Abstract

Purpose

To further promote application of BIM technology in construction of prefabricated buildings, influencing factors and evolution laws of willingness to apply BIM technology are explored from the perspective of willingness of participants.

Design/methodology/approach

In this paper, a tripartite game model involving the design firm, component manufacturer and construction firm is constructed and a system dynamics method is used to explore the influencing factors and game evolution path of three parties' application of BIM technology, from three perspectives, cost, benefit and risk.

Findings

The government should formulate measures for promoting the application of BIM according to different BIM application willingness of the parties. When pursuing deeper BIM application, the design firm should pay attention to reducing the speculative benefits of the component manufacturer and the construction firm. The design firm and the component manufacturer should pay attention to balancing the cost and benefit of the design firm while enhancing collaborative efforts. When the component manufacturer and the construction firm cooperate closely, it is necessary to pay attention to balanced distribution of interests of both parties and lower the risk of BIM application.

Originality/value

This study fills a research gap by comprehensively investigating the influencing factors and game evolution paths of willingness of the three parties to apply BIM technology to prefabricated buildings. The research helps to effectively improve the building quality and construction efficiency, and is expected to contribute to the sustainability of built environment in the context of circular economy in China.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 June 2023

Sidney Newton, Phillippa Carnemolla and Simon Darcy

The provision of an accessible and inclusive built environment is both a common regulatory requirement for architects and facilities managers, and a critical issue of equitable…

Abstract

Purpose

The provision of an accessible and inclusive built environment is both a common regulatory requirement for architects and facilities managers, and a critical issue of equitable access for people with disability. Post Occupancy Evaluation (POE) is key to ensuring appropriate building accessibility is provided and maintained. Improved Building Information Modelling (BIM) integration with Facilities Management (FM) will enable more effective POE over time. This study aims to define and demonstrate the practicability and utility of a particular configuration of emerging BIM and related digital technologies, applied in the field.

Design/methodology/approach

A field study approach is applied to investigate the practicability and utility of the technology configuration and POE procedures. A proposed technology configuration is applied to evaluate 21 accessible bathrooms across three university buildings in Sydney, Australia. First, a checklist of technical functionality for a POE of accessible bathrooms particular to the field study FM context is established. The checklist is based on a review of recent literature, relevant standards, best practice guidelines, expert opinions, and the organisational requirements. Then, a technical and procedural approach to POE and BIM integration with FM is defined and applied in the field. Finally, a quantitative analysis of the results is presented and discussed relative to both the particular and general FM contexts.

Findings

The use of low-cost BIM and related technologies can usefully be applied in the field to promote a more progressive integration of BIM with FM and provide enhanced baseline models for ongoing POE. A rudimentary risk assessment of key accessible bathroom features (in the context of this field study) identified that the Toilet: toilet rolls location is unsatisfactory across all bathrooms surveyed and represents an immediate and high-risk failing. Other high-risk issues highlighted in this study included: Approach: access; Entrance: door fittings and security; and Layout: hazards.

Practical implications

This study offers a blue-print for building practitioners to adopt and progressively integrate low-cost BIM and related technologies with extant FM systems. The study also promotes an improved approach to effective POE practice in general, and to the assessment of accessible bathrooms in particular.

Originality/value

Recent reviews highlight key barriers to BIM integration with FM and significant limitations to current POE practice. Proposals for BIM integration with FM tend to focus on the comprehensive use of BIM. This study demonstrates the practicability and utility of a more progressive approach to BIM adoption and integration with FM in general. The study is also novel in that it shows how low-cost BIM and related technologies can be used as a baseline reference for ongoing POE. Building practitioners can adopt and adapt the technology configuration and approach to support a range of POE applications. This field study has identified immediate and high-risk potential failings of the accessible bathrooms provided on one university campus in Sydney, Australia.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 29 March 2024

Ama Darkwah Osei Assibey Antwi, Aba Essanowa Afful, Joshua Ayarkwa, Ambrose Dodoo, Safowaa Osei-Tutu and Anthony Kwame Danso

This study aims to review the status quo, current state of research, research hot themes and research gaps in sustainable facilities management (SFM) in the built environment (BE…

Abstract

Purpose

This study aims to review the status quo, current state of research, research hot themes and research gaps in sustainable facilities management (SFM) in the built environment (BE) through an extant literature review.

Design/methodology/approach

To map and analyze knowledge paths in the context of SFM research, a sequential explanatory mixed-method review involving bibliometric and content analysis was used to help identify current research trends, research hot themes and knowledge gaps. The Scopus search engine was used to find 169 relevant articles. For a better understanding of the literature accumulated, a bibliometric analysis was carried out by using VOSviewer to reveal current research themes, the status quo and current state of research as well as research gaps.

Findings

Through the literature review and content analysis, the current research themes on SFM revealed from the study include green building technologies, assessment methods of SFM, smart buildings and building information modeling. The research hot themes in SFM include smart buildings and green building technologies, green buildings (GB), architectural and building designs in the university sector, assessment methods in buildings and decision-making and the adoption of asset and facility management in the university sector. Indoor air pollution, intelligent buildings, climate change, maintenance, environmental management, facilities, historic preservation, environmental performance, energy management, etc. are the research gaps identified from the study, and these serve as potential areas for future research studies under SFM. It was recognized that facilities managers are increasingly involved with sustainability policies within their organizations and are developing sustainability agendas to keep up with the changing nature of the facilities management (FM) profession.

Practical implications

The findings of this study hold relevance to the FM practice, as the integration of SFM by facilities managers can lead to waste reduction, decreased operating expenses and reduced energy consumption. In addition, occupants of sustainable buildings experience improved conditions that contribute to better health and productivity, thus boosting their overall well-being. Consistent with the themes of smart buildings and green technologies, revealed to be the hot themes in the SFM research scope, properties with sustainable features can command higher rental rates and property values, appealing to a broader range of stakeholders. SFM practices in universities can aid in saving money from reduced facility operational costs and improve the image of institutions while creating better indoor environments for students and staff. The analyses of countries involved in research can open doors for the establishment of research groups and the development of collaboration between universities in different countries researching similar topics of interest.

Originality/value

The geographical scope of this study is not limited and, therefore, encourages broad applicability of the findings to the global sustainable BE.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 4 October 2022

Ali Rashidi, Wei Yin Yong, Duncan Maxwell and Yihai Fang

The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how…

Abstract

Purpose

The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how construction practitioners perceive technology integration in construction planning in light of emerging technologies. This study intended to uncover unique experimental findings by integrating 4D-building information modelling (BIM) to virtual reality (VR) technology during construction planning among construction professionals at light steel framing (LSF) projects.

Design/methodology/approach

The building industry participants were invited to provide inputs on two different construction planning methods: conventional and innovative methods. The conventional method involved the participants using traditional platforms such as 2D computer-aided design (CAD) and physical visualisation of paper-based construction drawings for the LSF assembly process with a Gantt Chart tool to complete construction planning-related tasks for the targeted project. Comparatively, participants are required to perform the same tasks using more innovative platforms like 4D-BIM in a VR environment.

Findings

A Charrette Test Method was used to validate the findings, highlighting an improvement in usability (+10.3%), accuracy (+89.1%) and speed (+30%) using 4D BIM with VR compared to the conventional paper-based method. The findings are also validated by a paired t-test, which is supported by the rationality of the same findings. This study posits positive results for construction planning through the utilisation of modern practices and technologies. These findings are significant for the global construction industry facing low productivity issues, delays and certainty in terms of building delivery timelines due to poor construction planning.

Originality/value

This new blend of technologies—combining 4D BIM and VR in industrialised construction projects—potentially directs future initiatives to drive the efficiency of construction planning in the building lifecycle. The interactive BIM-based virtual environment would purposefully transform construction planning practices in order to deliver modern and more certain building construction methods with a focus on prefabrication processes.

Article
Publication date: 16 May 2023

Benonia Tinarwo, Farzad Rahimian and Dana Abi Ghanem

The aim of this paper is to discuss a selection of policy strategies, regional initiatives and market approaches to uncover the realities of twenty-first-century building energy…

Abstract

Purpose

The aim of this paper is to discuss a selection of policy strategies, regional initiatives and market approaches to uncover the realities of twenty-first-century building energy performance. A position that market-based approaches, human influence and policy interventions are part of an ecosystem of building energy performance is presented.

Design/methodology/approach

An exploratory search of secondary sources spanning the last three decades was conducted. Both peer-reviewed and grey literature were included to capture a broader understanding of the discourse in literature. Research questions guided the literature search, and a data extraction tool was designed to categorise the literature. The primary limitation of this study is that only a few applications could be discussed in a condensed format.

Findings

Several challenges about the current status quo of building energy performance were identified and summarised as follows. (1) Inconsistencies in measurement and verification protocols, (2) Impacts of market approaches, (3) National policy priorities that are at variance with regional targets and (4) Ambiguous reporting on environmental impacts of energy efficiency (EE) technologies.

Practical implications

The practical implications of the findings in this paper for practice and research are that as part of the building energy performance ecosystem, national responses through government interventions must become adaptive to keep up with the fast-paced energy sector and social trends. Simultaneously, before market-based approaches overcome the messiness of socio-economic dynamics, institutional conditions and cultural nuances, they ought to transparently address environmental impacts and the infringement of several SDGs before they can become viable solutions to building energy performance.

Originality/value

This paper presents building energy performance as an ecosystem comprising human influence, market-based approaches and policy interventions which form interdependent parts of the whole. However, evidence in the literature shows that these aspects are usually investigated separately. By presenting them as an ecosystem, this paper contributes to the discourse by advocating the need to re-align building energy performance to socio-economic-political dynamics and contextually viable solutions.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

1 – 10 of over 20000