Search results

1 – 10 of over 1000
Article
Publication date: 8 June 2022

Oliver Tannor, Elvis Attakora-Amaniampong and Emmanuel Kanchebe Derbile

This study aims to assess the facilities management (FM) strategies used in multi-tenanted purpose-built office buildings (Mt-POBs) in Ghana and the drivers that influence the…

Abstract

Purpose

This study aims to assess the facilities management (FM) strategies used in multi-tenanted purpose-built office buildings (Mt-POBs) in Ghana and the drivers that influence the decision to use such strategies.

Design/methodology/approach

This study was conducted via a survey and key informant interviews. The survey was conducted using a questionnaire targeted at 65 multi-tenanted office building owners in the Greater Accra region. The data from the survey revealed the views of building owners on FM strategy and the extent to which 20 facility management decision drivers influenced their decisions to use a particular strategy and the responses were descriptively analysed. The key informant interviews were conducted among six leaders of the property owners’ association who use in-house FM to further understand their perspectives and decisions on using such strategy. The interviews were conducted over telephone using an interview guide and analysed using thematic analysis.

Findings

The results showed that 88% of Mt-POBs in Ghana are managed in-house. The results also showed that the decision to use the in-house strategy was driven by the innovative, strategic and cost-saving advantages associated with the in-house strategy.

Originality/value

This study shows the factors that drive the decision of multi-tenanted office building owners in Ghana to use the in-house strategy. The findings of this study will be useful for prospective owners of office buildings in Ghana.

Details

Journal of Facilities Management , vol. 22 no. 2
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 14 September 2023

Natasha Khalil, Syahrul Nizam Kamaruzzaman, Mike Riley, Husrul Nizam Husin and Abdul Hadi Nawawi

This paper explores the patterns of the current needs of users' social characteristics in post occupancy evaluation (POE) associated with the environmental performance of green…

Abstract

Purpose

This paper explores the patterns of the current needs of users' social characteristics in post occupancy evaluation (POE) associated with the environmental performance of green buildings using systematic literature review (SLR). This paper aims to establish a conceptual nexus between environmental performance mandates and the current needs of the users' social characteristics.

Design/methodology/Approach

This paper adopts a SLR approach designed using Preferred Reporting Items for Systematic Reviews and Meta-Analyses for 21 articles that were selected as qualitative synthesis in this study. The search parameter for the selected articles in this review was limited to publications in three databases, Scopus, Web of Science and Emerald, between January 2016 and January 2023, with the help of qualitative software ATLAS.ti 9© in the presentation of the network codes. The initial literature search has retrieved 99 papers which sequentially excluded 42 papers due to exclusion criteria, and the researcher was left with 57 papers. Out of 57, 14 papers were then removed due to duplication of records found in the Scopus and Web of Science databases, and 43 articles were further screened for qualitative synthesis. A thorough critical appraisal was applied to ensure that only selected papers were included, consensus was achieved among the authors and 22 papers were excluded. The qualitative synthesis has finalized 21 studies, and they are selected as confirmative findings.

Findings

Using network codes presentation of ATLAS.ti 9©, the result shows that the social characteristics are influenced by the evaluated building category and the users' category – the stakeholders (owners, designers) and the occupants. New-fangled elements in environmental performance mandates are legitimacy and accessibility. The users’ social characteristics are derived from the category of users, where the stakeholders (designers, owners) are relatively a novel benchmark in meeting the POE objectives towards environmental performance. The least attention on the users’ social characteristics based on the findings shows that image, experiential (conjoint), happiness, interactive behaviour, morale and values are depicted as the social current needs in the environmental performance using POE. However, all stakeholders and the building occupants’ social characteristics must have a confirmative relation to the performance mandates, especially for newly performance mandates elements: legitimacy and accessibility.

Research limitations/implications

The research limits the literature search between the recent January 2016 and January 2023 in Scopus, Web of Science and Emerald databases. Limiting the year of publication to the recent years is important to select and rank relevant scientific papers which encompass the reviewed subject. Other limitations include the selection of papers focusing on the POE approach and environmental performance as the main subject of evaluation. Other evaluation purposes that are not related to environmental objectives are excluded in this study.

Originality/value

The characteristics of the social elements become a challenging subject in meeting the environmental performance needs as they lean more towards intangible elements. The novelty of the findings is drawn from the new pattern and current needs of users' social characteristics in POE for environmental performance.

Article
Publication date: 13 November 2023

Oliver Tannor, Felix Dordaa and John Yaw Akparep

The aim of this study is to examine the agency problems that arise between retail property owners and outsourced facility management (FM) service vendors in Ghana.

Abstract

Purpose

The aim of this study is to examine the agency problems that arise between retail property owners and outsourced facility management (FM) service vendors in Ghana.

Design/methodology/approach

This study was carried out using telephone and face-to-face interviews. Nine facility managers (n =9) and six retail property owners (n = 6) purposively selected participated in the interviews. The responses from the interviews were analysed using content analysis. To begin with the analysis, the recorded audio for each respondent during the interviews was transcribed to augment what was written during the interviews. The next step was the development of a coding framework where each of the agency problems was assigned unique codes and grouped under themes. Each response was assigned a predefined code based on the agency problems identified in the literature. The research team discussed the consistency of the thematic codes assigned to each of the responses to ensure that each response was captured under the appropriate agency problem theme it best represents.

Findings

The results showed that agency problems in FM outsourcing in the Ghanaian retail sector are related to disagreement on expenditure associated with maintenance and repairs and improper tenant information sharing and use by FM service providers. Based on the findings, it is recommended that property owners explore the mixed approach to FM to mitigate the risks of complete outsourcing of FM services. It is also recommended that a clear path on how tenant information can be shared be pre-agreed in FM contracts.

Originality/value

This study provides new literature relating to agency problems in outsourcing and may be the first of its kind for FM in the Ghanaian retail industry. The findings could serve as a starting point for service providers and their principals to find common grounds to understand each other and mitigate the agency problems that could arise and their overall impact on performance.

Details

Journal of Corporate Real Estate , vol. 26 no. 1
Type: Research Article
ISSN: 1463-001X

Keywords

Open Access
Article
Publication date: 12 December 2023

Judith Fauth, Tanya Bloch and Lucio Soibelman

Building permitting is mostly a manual, labor intensive and time-consuming process. Initiatives for streamlining the process are not always helpful since they often fail to…

Abstract

Purpose

Building permitting is mostly a manual, labor intensive and time-consuming process. Initiatives for streamlining the process are not always helpful since they often fail to address the core problems within the process. A framework for modeling the permitting process can be useful to identify bottlenecks, core challenges and best practices. Hence, the authors aim to demonstrate and validate a previously suggested workflow for permit process modeling using the permitting process in Israel as a test case.

Design/methodology/approach

The authors implement qualitative expert interviews for data acquisition. The collected data are then processed for a qualitative data analysis. The results of the analysis are then validated using a focus group workshop in the field of building permits. In the test case the focus group consisted of Israeli experts.

Findings

The authors present a detailed overview of the as-is building permit process in Israel and the existing challenges. Through this test case, the authors found that the framework is applicable in different countries and that it can provide valuable insights into the core problems within the process. In addition, application of the same framework in different countries can provide comparable results that would allow the authors to identify best practices.

Originality/value

The major contribution of this work is the development and validation of a framework for building permitting process modeling which can be used to identify existing challenges and bottlenecks in the process. Implementing a structured and unified approach provides an opportunity to easily compare processes in different countries to identify best practices.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 August 2022

Masresha Belete Asnakew and Minale Kassahun Amogne

The accessibility of housing for many purposes is more influenced by the functioning of housing market. As access to housing is an expensive and long-term exertion of household…

Abstract

Purpose

The accessibility of housing for many purposes is more influenced by the functioning of housing market. As access to housing is an expensive and long-term exertion of household, looking for appropriate housing fund is necessary whether the source of fund is private saving or mortgage. However, insufficient finance in Ethiopia is a reason for inaccessible of land and housing by the low- and middle-income people. This study aims to identify the barriers to access finance in the study area.

Design/methodology/approach

This study adopted a qualitative and quantitative research approach to investigate the barriers of housing finance. To undertake and increase the relevance of this study, primary and secondary, qualitative and quantitative data were used. Primary data were collected from respondents; focal person’s and key informants. Both descriptive statistical analysis and relative importance index analysis was deployed for this study. In addition, the quantitative data were analyzed using logistic regresion model.

Findings

The result of this study found that in Ethiopia at all, there is no enough mortgage and long-term lending banks. The result of this study inspects some variables significantly affect the access to finance. The result of this study will help the government in buildup of financial institutions in many perspectives. Financial institutions and clients may also be beneficiary through stiffen housing finance system.

Originality/value

The barriers of access to finance were not sufficiently studied in Ethiopia. Therefore, this study may be a pioneer for the researchers, as it did not cover the whole area of the country to study and also appoint the government to reform the financial sector based on the findings of the researches.

Details

International Journal of Housing Markets and Analysis, vol. 16 no. 6
Type: Research Article
ISSN: 1753-8270

Keywords

Article
Publication date: 4 July 2022

Genell Wells Ebbini and Adel Al-Assaf

The researchers analyzed factors affecting the adoption of the Leadership in Energy and Environmental Design (LEED) green-building certification system in Jordan, including…

Abstract

Purpose

The researchers analyzed factors affecting the adoption of the Leadership in Energy and Environmental Design (LEED) green-building certification system in Jordan, including financial performance of certified projects along with broader barriers that may impact developers’ interest in LEED.

Design/methodology/approach

The authors first reviewed online data for all LEED registered and certified projects in Jordan, recruited LEED-certified project stakeholders, collected documents related to LEED projects and conducted LEED category credit summaries, financial cost-benefit analyses and spot-checking reported values in local markets. The authors then visited projects sites and interviewed various project stakeholders to understand better stakeholders' decision-making processes concerning LEED and relevant factors (financial, branding, cultural, political, etc.).

Findings

Obtaining LEED certification in Jordan was financially feasible as evinced in both the quantitative analysis and interviews. However, the authors found that there was very limited interest in LEED among Jordanian developers. Barriers included widespread cynicism toward green building concepts as well as a lack of local expertise in installing and maintaining green technologies. To overcome these barriers, the authors recommend that green building initiatives place a greater emphasis on education and public-promotion activities.

Research limitations/implications

The research data were limited to projects that had successfully achieved LEED certification. Broader qualitative research conducted across the Jordanian building community could provide additional insights, but such an investigation is beyond the scope of the current study.

Originality/value

The complexity of adapting a Western green building standard (LEED) to a non-Western context is discussed in detail. The findings suggest that understanding regional development challenges, local markets and cultural differences is vital for successfully implementing green building certification systems.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. 17 no. 4
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 25 March 2022

Innocent Chigozie Osuizugbo, Kevin Chuks Okolie and Olalekan Shamsideen Oshodi

Improving buildability of building designs with the aid of buildability assessment is essential because of the effect of designs on construction. Despite the plethora of research…

Abstract

Purpose

Improving buildability of building designs with the aid of buildability assessment is essential because of the effect of designs on construction. Despite the plethora of research into buildability reported over the years, a review of the literature shown a dearth of research into the factors supporting the implementation of buildability assessment. Because buildability assessment has been confirmed to be highly beneficial to construction business, this study aims to investigate the factors supporting the implementation of buildability assessment as a tool for buildability improvement using Nigeria as a representative case.

Design/methodology/approach

Survey research method was adopted for the study. Questionnaires were administered to a purposively selected group of architects, engineers, builders and quantity surveyors involved in construction project delivery within client, consulting and contracting organisations in Nigeria. A total of 368 questionnaires were distributed among the sampled participants, out of which, a total of 219 representing 60% were sufficiently filled and returned. Data collected were analysed using inferential and descriptive statistics.

Findings

The results revealed owner’s commitment, clients’ awareness of the benefits of conducting buildability assessment on building design, unity amongst different professionals in the construction industry, designers consider buildability important, adequate coordination amongst different design disciplines, adequate channel for co-ordination and communication between designers and constructors at the design stage and adequate support from the government as the top most seven factors supporting buildability assessment implementation in construction sector of Nigeria. Secondly, the results from the research revealed that there is no statistically significant difference in factors supporting buildability assessment implementation in construction between clients and consulting and contracting construction organisations in Nigeria.

Originality/value

The findings provide in-depth insight of the factors supporting the implementation of buildability assessment in construction that can help principal stakeholders in construction to facilitate development of strategies required in supporting the adoption and implementation of buildability assessment tool for buildability improvement.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 26 May 2022

Innocent Chigozie Osuizugbo, Kevin Chuks Okolie and Opeyemi Olanrewaju Oyeyipo

Due to the need to enhance the buildability of building designs in building construction industry, a buildability assessment framework was developed for use in Nigeria. This paper…

Abstract

Purpose

Due to the need to enhance the buildability of building designs in building construction industry, a buildability assessment framework was developed for use in Nigeria. This paper aims to investigate and determine the factors influencing buildability assessment implementation in the Nigerian construction industry with the view to improving buildability of building designs. To address the aim, this study will provide answers to the following research question: what are the factors hindering and supporting the implementation of buildability assessment in the Nigerian construction industry?

Design/methodology/approach

Survey research method was adopted for the study. Questionnaires were administered to purposively selected group of architects, engineers, builders and quantity surveyors involved in construction project delivery within the client, consulting and contracting organisations in Nigeria. A total of 368 questionnaires were distributed among the sampled participants, out of which a total of 219 representing 60% were sufficiently filled and returned. Data collected were analysed using inferential and descriptive statistics.

Findings

The results revealed owner’s commitment, clients’ awareness of the benefits of conducting buildability assessment on building design, unity among different professionals in the construction industry, designers consider buildability important, adequate coordination among different design disciplines, adequate channel for coordination and communication between designers and constructors at the design stage and adequate support from the government as the topmost seven factors supporting buildability assessment implementation in the construction sector of Nigeria. Second, the study revealed that poor coordination among different design disciplines, lack of buildability assessment awareness, design review pattern where construction personnel (builders) are invited to assess the building production information, unwillingness to invest extra money and effort during the early stage of project and designers value aesthetics and functionalities more than buildability in their designs are the topmost five factors hindering buildability assessment implementation in the Nigerian construction industry.

Originality/value

The study provides detailed insights into the factors supporting and hindering buildability assessment implementation in the Nigerian construction industry. The findings indicate the need to enlighten principal stakeholders in construction about buildability and the outcome of the buildability assessment tool. This information can motivate principal stakeholders in implementing and practising buildability assessment.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 September 2023

Huiying (Cynthia) Hou, Daniel C.W. Ho and Yung Yau

Facilities management (FM) activities affect citizens’ health and safety, long-term urban environmental sustainability and the relationships between the built and natural…

Abstract

Purpose

Facilities management (FM) activities affect citizens’ health and safety, long-term urban environmental sustainability and the relationships between the built and natural environments of cities. This study aims to comprehend the status of smart FM tools application, how they are used to improve the delivery of FM services and the barriers to their implementation.

Design/methodology/approach

To investigate the current smart solutions that leverage the quality of FM service, a case study based on the FM practice in Hong Kong was carried out. The case study was conducted in two phases of data acquisition based on a qualitative research methodology. After conducting in-depth interviews to determine the application of smart FM tools in different types of properties and to identify the initiatives and barriers to smart FM tool application, three workshops were conducted to validate the findings and further investigate the influence of FM professionals on smart FM tools application in Hong Kong.

Findings

The findings of the case study revealed, firstly, that four types of smart FM tools – user-centric, safety and hygiene, maintenance and sustainability-oriented – are used to assist the delivery of FM services. Secondly, smart FM tools are shown to be useful in assisting FM activities. Thirdly, the existing barriers to smart FM tool application manifest differently in shopping malls, office buildings and residential buildings. Fourthly, smart FM tools are used to address the four attributes of user needs: comfort, health and wellbeing, convenience and information to occupants.

Originality/value

The value of this study lies in its focus on the industry level (FM industry) and the application process of smart FM tools in different types of property, revealing the benefits, initiatives and barriers to their future application. This study provides a comprehensive picture of the current status and elaborates the barriers to smart FM tool application, which will help FM practitioners to make strategic decisions on selecting and developing smart FM tools. Also, this study will facilitate smart FM tool application policy development.

Details

Facilities , vol. 42 no. 1/2
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 5 January 2023

Rand H.M. Agha and Amna Nassir Hussein

This paper aims to shed light on adaptive reuse in traditional architecture (TA) in Erbil, Iraq.

Abstract

Purpose

This paper aims to shed light on adaptive reuse in traditional architecture (TA) in Erbil, Iraq.

Design/methodology/approach

An inductive approach and qualitative method were used in this study. The inductive research approach was used because there was no clear image of adaptive reuse in traditional cafés (TCs) in Erbil. Besides, there are no studies of TCs in Erbil particularly. Thus, there is a lack of knowledge about what adaptations took place in TCs in Erbil. The qualitative method extracted themes and issues from case studies of four TCs in Erbil citadel's buffer zone. This included a physical survey and observation of the TCs in Erbil and 18 semi-structured interviews with the owners, servers and visitors.

Findings

The analysis shows the flexibility of the TCs in Erbil as a face of adaptive re-use (AR) which is explained through the capacity linked to space modifications, the addition of modern devices, the function linked to space modifications, service addition, the condition linked to space modifications and the addition of modern devices. Also, TCs in Erbil has a spatial identity and architectural value that proves it is worthy enough to be preserved through unique spirituality linked to preserving the place.

Research limitations/implications

The findings are limited to the cases of TCs in mountain regain and may not be applicable or appropriate to other cafés in other different countries.

Originality/value

There are three aspects of authenticity in the current research. Firstly, the TCs in Erbil have not been studied before. Secondly, TCs that have been discovered have made AR of themselves whilst maintaining their original function-serving beverages, to stimulate creativity. Thirdly, most of the studies of AR have dealt with historical and heritage architecture, whilst the current research paper is dealing with TA.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Access

Year

Last 6 months (1788)

Content type

Article (1788)
1 – 10 of over 1000