Search results

1 – 10 of 852
Article
Publication date: 5 September 2023

Garima Bhagat and Kumar Neeraj Jha

With the surge in public procurement, especially in developing countries, ensuring fair competition in procurement has assumed paramount importance. Academic endeavors in the…

Abstract

Purpose

With the surge in public procurement, especially in developing countries, ensuring fair competition in procurement has assumed paramount importance. Academic endeavors in the domain of competition issues have often lacked the views of field-level functionaries. This study aims to involve a large number of expert practitioners in India to identify the significant contemporary competition risks in public procurement from the procurer and supplier sides and develop a model depicting the hierarchy of competition-restrictive actions (CRAs) in procurement based on their mutual interactions.

Design/methodology/approach

The significant CRAs along the procurement cycle are identified through literature survey, interactive workshops and expert interviews. A questionnaire survey covering 143 respondents from 12 public organizations is used to evaluate their impact. Considering the complex causal interactions involved, interpretive structural modeling followed by MICMAC (Iimpact matrix cross-reference multiplication applied to a classification analysis is used to develop a hierarchical model of competition risks in procurement.

Findings

Tailor-made contracts, splitting of a project below competition thresholds, restrictive selection criteria and awarding the contract on nomination emerge as CRAs with the highest driving power. Horizontal collusion among vendors strongly depends on practices followed in the procuring organization.

Research limitations/implications

The survey data and the experts’ opinions emanate from practitioners in India, which is a limitation. However, with necessary contextual calibrations, the study is of high functional utility to policymakers and practitioners.

Social implications

The research facilitates a comprehensive understanding to procurement managers/policymakers of the CRAs along the procurement cycle and their interdependencies. It offers valuable insights for improving competition, which is foundational for optimal procurement outcomes.

Originality/value

The study enriches the public procurement domain knowledge by identifying and assessing the significant contemporary CRAs, examining their mutual interactions and developing an interpretive structural model. Although contributing to the body of knowledge, the study is unique in being grounded in field realities.

Details

Journal of Public Procurement, vol. 23 no. 3/4
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 21 February 2022

Craig Langston

Innovation during project delivery is contested space. The aim in this research is to empirically explore the theory of this contested space and how project implementation can be…

Abstract

Purpose

Innovation during project delivery is contested space. The aim in this research is to empirically explore the theory of this contested space and how project implementation can be optimized by the contractor to deliver better outcomes. It is hypothesized that project innovation has a proportional and measurable relationship to contractor success.

Design/methodology/approach

Based on a novel conceptual framework, this research applies a case study methodology to analyse 31 construction projects undertaken by a single Australian middle-tier contractor. Benefits from innovation are not often equitably shared. There are risks and rewards. The project innovation zone is defined as a combination of three key performance indicators – efficacy, efficiency and margin – merged into a single index that most likely shows evidence of “working smarter”.

Findings

Client–contractor project innovation (c2pi) is demonstrated to be strongly correlated with head contractor success (HCS), yielding an r2 value of 71%. Innovative projects mostly show positive change in efficacy, efficiency and margin when comparing “planned” and “actual” outcomes. Across the cases studied, 35% demonstrated likely evidence of innovative delivery and 52% demonstrated evidence of success from the construction contractor's perspective.

Originality/value

These findings verify that, within the studied sample, the pursuit of innovation leads to projects that are likely to also have greater success for the head contractor, evidenced by the mix of five critical success factors: finishing on schedule, making profit, and having less defects, less accidents and higher quality workmanship. These outcomes arguably also apply to sub-contractors, where the head contractor assumes the role of “client”.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 21 July 2023

Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…

1046

Abstract

Purpose

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.

Design/methodology/approach

Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.

Findings

The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.

Practical implications

The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.

Originality/value

The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 4 August 2022

Nayana Dissanayake, Bo Xia, Martin Skitmore, Bambang Trigunarsyah and Vanessa Menadue

The purpose of this study was to prioritize the appropriate generic contractor selection criteria for Engineering–Procurement–Construction (EPC) projects in the construction…

Abstract

Purpose

The purpose of this study was to prioritize the appropriate generic contractor selection criteria for Engineering–Procurement–Construction (EPC) projects in the construction industry.

Design/methodology/approach

Proceeding from a review of previous studies and validation by a small group of experts, a preliminary set of 16 criteria was first identified. This was followed by three rounds of Delphi surveys: firstly, with 64 experienced participants confirming the relevance of the 16 criteria; secondly, with a reduced subgroup of 47 more experienced participants scoring the importance of each; and finally, providing the opportunity for these 47 to revise their scores in the light of knowing the aggregated results of the previous round.

Findings

The results show the consensus view, of which the most important criteria are ranked as past performance, project understanding, technical attributes, key personnel, health and safety, past experience, time, management, financial, contractual and legal, quality, cost, relationships, environmental and sustainability, organizational and industrial relations, and geographic location.

Originality/value

The findings are useful for both practitioners and academics in making a significant contribution to the body of knowledge of the EPC process. This will assist in providing a better understanding of criteria importance and pave the way to developing an EPC contractor selection model involving the criteria most needed to objectively identify potential contractors and evaluate tenders.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 August 2021

Martin Evans, Peter Farrell, Emad Elbeltagi and Helen Dion

The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International…

1144

Abstract

Purpose

The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International businesses, multinational AEC organisations, technical professionals, project and portfolio management organisations face global connectivity challenges between business units, especially during the outbreak of novel coronavirus pandemic, to manage construction megaprojects (CMPs). That raises the need to manage global connectivity as a main strategic goal of global organisations. This paper aims to investigate barriers to integrating lean construction (LC) practices and integrated project delivery (IPD) on CMPs towards the global integrated delivery (GID) transformative initiatives and develop future of work (FOW) global initiatives in contemporary multinational AEC organisations.

Design/methodology/approach

A two-stage quantitative and qualitative research approach is adopted. The qualitative research methodology consists of a literature review to appraise barriers to integrating LeanIPD&GID on CMPs. Barriers are arranged into six-factor clusters (FCs), with a conceptualisation of LeanIPD&GID, GID strategy placements and FOW global initiatives with multiple validations. This analysis also involved semi-structured interviews and focus group techniques. Stage two consisted of an empirical questionnaire survey that shaped the foundation of analysis and findings of 230 respondents from 23 countries with extensive cosmopolitan experience in the construction of megaprojects. The survey examined a set of 28 barriers to integrating LeanIPD&GID on CMPs resulting from a detailed analysis of extant literature after validation. Descriptive and inferential statistical tests were exploited for data analysis, percentage scoring analysis, principal component analysis (PCA) and eigenvalues were used to elaborate on clustered factors.

Findings

The research conceptualised LeanIPD&GID principles and proposed GID strategy placements for LeanIPD&GID transformative initiatives and FOW global initiatives. It concluded that the most significant barriers to integration of LeanIPD&GID on CMPs are “lack of mandatory building information modelling (BIM) and LC industry standards and regulations by governments”, “lack of involvement and support of governments”, “high costs of BIM software licenses”, “resistance of industry to change from traditional working practices” and “high initial investment in staff training costs of BIM”. PCA revealed the most significant FCs are “education and knowledge-related barriers”, “project objectives-related barriers” and “attitude-related barriers”. Awareness of BIM in the Middle East and North Africa (MENA) region is higher than LC and LC awareness is higher than IPD knowledge. Whilst BIM adoption in the MENA region is higher than LC; the second is still taking its first steps, whilst IPD has little implementation. LeanBIM is slightly integrated, whilst LeanIPD integration is almost not present.

Originality/value

The research findings, conclusion and recommendation and proposed GID strategy placements for LeanIPD&GID transformative initiatives to integrating LeanIPD&GID on CMPs. This will allow project key stakeholders to place emphasis on tackling LeanIPD&GID barriers identified in this research and commence GID strategies. The study has provided effective practical strategies for enhancing the integration of LeanIPD&GID transformative initiatives on CMPs.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 6 July 2022

Klara Granheimer, Tina Karrbom Gustavsson and Per Erik Eriksson

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the…

Abstract

Purpose

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the uncertainties. Despite that, studies on the public procurement of engineering services are scarce. Although scholars have shown that uncertainty may affect the choice of control modes, the level of uncertainty that characterises services is not addressed by the two task characteristics: knowledge of the transformation process and output measurability. The purpose is to investigate organisational control in public procurement of engineering services.

Design/methodology/approach

The existing control model was adjusted in this study by conceptually adding uncertainty as a third aspect to the two task characteristics. A single case study of the Swedish Transport Administration was used. The empirical data, comprising 14 interviews with managers from the client and engineering consulting companies, were analysed using flexible pattern matching and visual mapping approaches and then illustrated using the model.

Findings

The public client did not base its choice of control modes on uncertainty, but rather on the other two task characteristics. Consequently, the service providers argued that the chosen control modes reduced their creativity, increased their financial risks and caused unclear responsibilities. This study therefore shows that uncertainty is an important factor to consider in the choice of control modes, both from a theoretical perspective and from the service providers' point of view. The developed model may therefore be useful for researchers as well as practitioners.

Originality/value

This study is the first attempt to add uncertainty as a task characteristic when choosing control modes. The results contribute to the scarce control literature regarding the procurement of engineering services for construction projects and the procurement of other services with high uncertainty.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 August 2022

Shumank Deep, Thayaparan Gajendran and Marcus Jefferies

The purpose of this study is to identify the antecedents of “power” and “dependence” attributes in the context of a construction project and to explore the impact of the…

Abstract

Purpose

The purpose of this study is to identify the antecedents of “power” and “dependence” attributes in the context of a construction project and to explore the impact of the antecedents on risk transfer and collaboration to develop a conceptual framework for decision-making.

Design/methodology/approach

A systematic review was performed using various databases to identify the antecedents and their measures. This review followed the established preferred reporting items for systematic reviews and meta-analyses protocols and 246 articles were identified. The articles were qualitatively analysed based on keyword co-occurrence approach using VOSviewer software.

Findings

The findings of this systematic review established latent constructs, that is, “clarity of procurement decisions”, “market structure” and “market competition” as antecedents of power and two antecedents of dependence, namely, “reputation” and “commercial importance”. And a framework was conceptualized to determine the contractual approach and the procurement design should be planned to take in account the scenarios and the course of action to enhance collaboration and control risk transfer.

Originality/value

To the best of the authors’ knowledge, this study is the first of its kind to identify the “antecedents” of the attributes of “power” and dependence and framework was conceptualized to determine the contractual approach.

Open Access
Article
Publication date: 6 June 2022

Taha Karasu, Kirsi Aaltonen and Harri Haapasalo

Integrated project delivery (IPD) and building information modeling (BIM) have been discussed as prominent collaborative concepts in recent architecture, engineering and…

3946

Abstract

Purpose

Integrated project delivery (IPD) and building information modeling (BIM) have been discussed as prominent collaborative concepts in recent architecture, engineering and construction (AEC) literature, thus recommended for more advanced value creation. However, they have been studied predominantly as discrete even though they are typically highly interrelated. This study aims to enhance collaboration in AEC projects by tracing recent trends in IPD and BIM literature by making sense of trends and by exploring how their interplay has been discussed and conceptualized.

Design/methodology/approach

This systematic literature review draws on Scopus and Web of Science as the primary databases. In total, 120 academic papers and review articles were sourced. Yet, the final sample includes 71 sources from the past decade (2011–2020), focusing on both IPD and BIM.

Findings

This study identifies 11 interrelated and overlapping themes that are indicative of trends in the recent IPD and BIM literature. This research found that among the identified themes, the clusters of sustainability, transformation and increasing the competence level of staff in the AEC industry, in addition to the concept of quality, require more extensive research in the context of IPD and BIM. Additionally, this study identifies four different approaches to the interplay of IPD and BIM, indicating an absence of scholarly consistency.

Originality/value

Based on the systematic analysis of the recent literature, this study indicates that IPD and BIM have several joint fundamental cornerstones. It is evident that both concepts support the implementation of each other. The success of implementing either one is strongly related to the other. Additionally, we have not found earlier systematic literature reviews that examine the interplay between IPD and BIM in the recent AEC literature.

Open Access
Article
Publication date: 26 May 2023

Sina Moradi and Piia Sormunen

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…

2844

Abstract

Purpose

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.

Design/methodology/approach

A systematic literature review was conducted to fulfill the purpose of this study.

Findings

The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.

Originality/value

The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 October 2022

Ding Wang, Jianyao Jia, Shan Jiang, Tianyi Liu and Guofeng Ma

Despite the documented benefits of voice behavior for projects, little is known about antecedents of voice behavior in the project context, especially construction projects…

Abstract

Purpose

Despite the documented benefits of voice behavior for projects, little is known about antecedents of voice behavior in the project context, especially construction projects. Against this background, adopting a multi-team system perspective, this study attempts to investigate antecedents of team voice behavior from a contextual view.

Design/methodology/approach

This study identifies and examines six factors that influence team voice behavior. Specifically, project urgency, project temporality, and project complexity are identified from the project nature perspective. Satisfaction, trust, and commitment are generated from the relationship quality approach. Then, data from completed construction projects in China was collected to verify the effectiveness of these factors. Besides, the partial least squares structural equation modeling (PLS-SEM) technique was used in this study.

Findings

All six factors are found to be significant predictors of promotive team voice behavior. For prohibitive team voice behavior, only project complexity and project commitment make significant effects. Further, the differential effects of these factors on two types of voice behavior are revealed.

Originality/value

This study contributes to the literature on voice behavior in the project context, especially construction projects consisting of multiple teams. Also, this research enriches our knowledge on antecedents of team voice behavior in construction projects and thus affords practical implications to foster voice behavior.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Year

Last 12 months (852)

Content type

Article (852)
1 – 10 of 852