Search results

1 – 10 of 139
Article
Publication date: 20 November 2017

Ruwini Edirisinghe, Kerry Anne London, Pushpitha Kalutara and Guillermo Aranda-Mena

Building information modelling (BIM) is increasingly being adopted during construction projects. Design and construction practices are adjusting to the new system. BIM is intended…

4625

Abstract

Purpose

Building information modelling (BIM) is increasingly being adopted during construction projects. Design and construction practices are adjusting to the new system. BIM is intended to support the entire project life-cycle: the design and construction phases, and also facility management (FM). However, BIM-enabled FM remains in its infancy and has not yet reached its full potential. The purpose of this paper is to identify major aspects of BIM in order to derive a fully BIM-enabled FM process.

Design/methodology/approach

In total, 207 papers were classified into main and subordinate research areas for quantitative analysis. These findings were then used to conceptualise a BIM-enabled FM framework grounded by innovation diffusion theory for adoption, and for determining the path of future research.

Findings

Through an extensive literature review, the paper summarises many benefits and challenges. Major aspects of BIM are identified in order to describe a BIM-enabled FM implementation process grounded by innovation diffusion theory. The major research areas of the proposed framework include: planning and guidelines; value realisation; internal leadership and knowledge; procurement; FM; specific application areas; data capture techniques; data integration; knowledge management; and legal and policy impact. Each element is detailed and is supported by literature. Finally, gaps are highlighted for investigation in future research.

Originality/value

This paper systematically classifies and evaluates the existing research, thus contributing to the achievement of the ultimate vision of BIM-enabled FM. The proposed framework informs facility managers, and the BIM-enabled FM implementation process. Further, the holistic survey identifies gaps in the body of knowledge, revealing avenues for future research.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 June 2021

Nikdokht Ghadiminia, Mohammad Mayouf, Sharon Cox and Jan Krasniewicz

Building information modelling (BIM) creates a golden thread of information of the facility, which proves useful to those with the malicious intent of breaching the security of…

Abstract

Purpose

Building information modelling (BIM) creates a golden thread of information of the facility, which proves useful to those with the malicious intent of breaching the security of the facility. A cyber-attack incurs adverse implications for the facility and its managing organisation. Hence, this paper aims to unravel the impact of a cybersecurity breach, by developing a BIM-facilities management (FM) cybersecurity-risk-matrix to portray what a cybersecurity attack means for various working areas of FM.

Design/methodology/approach

This study commenced with exploring cybersecurity within various stages of a BIM project. This showcased a heightened risk of cybersecurity at the post-occupancy phase. Hence, thematic analysis of two main domains of BIM-FM and cybersecurity in the built environment led to the development of a matrix that illustrated the impact of a cybersecurity attack on a BIM-FM organisation.

Findings

Findings show that the existing approaches to the management of cybersecurity in BIM-FM are technology-dependent, resulting in an over-reliance on technology and a lack of cybersecurity awareness of aspects related to people and processes. This study sheds light on the criticality of cyber-risk at the post-occupancy phase, highlighting the FM areas which will be compromised as a result of a cyber-attack.

Originality/value

This study seeks to shift focus to the people and process aspects of cybersecurity in BIM-FM. Through discussing the interconnections between the physical and digital assets of a built facility, this study develops a cyber-risk matrix, which acts as a foundation for empirical investigations of the matter in future research.

Details

Journal of Facilities Management , vol. 20 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 1 November 2023

Deniz Artan, Isilay Tekce, Neziha Yilmaz and Esin Ergen

Occupant feedback is crucial for healthy, comfortable and productive offices. Existing facility management (FM) systems are limited in effective use of occupant feedback, as they…

Abstract

Purpose

Occupant feedback is crucial for healthy, comfortable and productive offices. Existing facility management (FM) systems are limited in effective use of occupant feedback, as they fail to collect the vital contextual information (e.g. related building element, space) associated with the feedback. The purpose of this study is to formalise the contextual information requirements for structured collection of occupant feedback for rapid diagnosis and resolution of problems and integrating occupant feedback with building information modelling (BIM) for making use of its visualisation and analysis capabilities, and eventually for effective use of occupant feedback in FM operations.

Design/methodology/approach

A mixed-methods approach was conducted in four steps: (1) identifying occupant feedback types (e.g. echo in meeting room) in office buildings, (2) examining the current practice in collecting and processing occupant feedback via use cases, (3) determining the contextual information requirements via expert interviews and (4) validation of the information requirements via a BIM-integrated prototype.

Findings

The findings present the contextual information requirements for 107 occupant feedback types grouped under thermal comfort, indoor air quality, acoustic comfort, visual comfort, building design and facility services.

Practical implications

Feedback-specific contextual information items enable structured data collection and help to avoid missing data and minimise the time lost in manual data entry and recursive interaction with the occupants during FM operations.

Originality/value

The contextual information requirements determined are expected to enhance occupant satisfaction and FM performance in office buildings by better use of the occupant feedback and integration into BIM-enabled FM and can be extended to other building types in future studies by using the proposed methodology.

Details

Facilities , vol. 42 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 13 July 2015

Deniz Ilter and Esin Ergen

The purpose of this paper is to present a strategic overview of the current literature on “Building information modelling (BIM) for Building Refurbishment and Maintenance” to…

8000

Abstract

Purpose

The purpose of this paper is to present a strategic overview of the current literature on “Building information modelling (BIM) for Building Refurbishment and Maintenance” to unfold the factors behind the relative underdeveloped state of the field and to contribute to the development of a more cumulative knowledge base by presenting the current status and suggesting future directions for research.

Design/methodology/approach

A systematic review of the literature has been undertaken by classifying and mapping the literature, identifying the input-output relations, exhibiting the areas focused on by researchers as well as neglected ones and by indicating the trends in research through the years. Both qualitative and quantitative analysis is used in the study to better interpret the existing studies in a holistic perspective.

Findings

Although the need for BIM in facility management (FM) has been acknowledged by researchers and practitioners, the results highlight that studies related to BIM applications in maintenance and especially refurbishment are relatively recent. However, the trend in published articles shows that the interest is continuously growing. Existing research in this field can be clustered in the following subtopics: (1) building survey and as-built BIM, (2) modelling and managing energy, (3) design assessment, (4) access to and integration of maintenance information and knowledge, and (5) information exchange and interoperability.

Originality/value

The paper identifies the gaps in the research domain that hinders a widespread adoption of BIM in refurbishment and maintenance stages and introduces roadmaps to surmount the challenges identified in each specific subtopic of the field.

Details

Structural Survey, vol. 33 no. 3
Type: Research Article
ISSN: 0263-080X

Keywords

Article
Publication date: 6 July 2020

Soojung Kim, Erik A. Poirier and Sheryl Staub-French

As the use of building information modeling (BIM) for facilities management (FM) continues to grow, questions remain around the quality and completeness of digital assets to…

Abstract

Purpose

As the use of building information modeling (BIM) for facilities management (FM) continues to grow, questions remain around the quality and completeness of digital assets to support FM practices. This paper aims to examine the current gap between digital and physical assets in the absence of formal information requirements and its impact on the handover process.

Design/methodology/approach

An action-research was carried out with a large public organization to understand the challenges of their current FM processes and the steps required in developing an asset information model (AIM) from a project information model (PIM). A mixed method approach was employed with interviews, document analysis and an exploratory pilot case study.

Findings

This paper investigates the process, the challenges and the level of effort of the information commissioning process to create a fit-for-use AIM. Four distinct steps were identified in the process as follows: analyzing the handover PIM and documents, extracting FM-specific information, populating the model with the information and attaching operations and maintenance (O&M) documents. The research highlights the significant amount of effort that is required when no specific asset information requirements are formulated at the project onset.

Practical implications

The paper presents an information commissioning process that helps to develop an AIM from a PIM. Understanding the impact of the lack of requirements on the information commissioning process can help asset owners understand the importance of defining and articulating their information requirements up front.

Originality/value

This paper provides empirical evidence of the impact of the absence of formal information requirements on the development of a fit-for-use AIM.

Details

Journal of Facilities Management , vol. 18 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 18 July 2020

Melanie Stride, Carol K.H. Hon, Rui Liu and Bo Xia

Adoption of building information modelling (BIM) in facilities management (FM) provides an information platform to store and exchange asset data. Quantity Surveyors, with cost…

1321

Abstract

Purpose

Adoption of building information modelling (BIM) in facilities management (FM) provides an information platform to store and exchange asset data. Quantity Surveyors, with cost management expertise, are increasingly involved in FM roles in the operation phase. However, no study has been conducted on how BIM may assist Quantity Surveyors when contracted in FM roles. This study aims to identify the potential benefits and challenges of using BIM by Quantity Surveyors in FM roles.

Design/methodology/approach

Interviews were conducted with eight professionals from an international built and natural asset design and management company and its FM business partner in Australia.

Findings

Lack of complete and accurate data was the main issue faced by Quantity Surveyors in FM. The benefits of BIM in FM were digitizing and storing asset information and developing a cost database that would be useful for Quantity Surveyors, whereas challenges included keeping model data up to date, cost, industry resistance to change and contractors' lack of model use.

Originality/value

This study contributes to revealing the niche adoption of BIM by Quantity Surveyors in FM and identifying the issues faced by Quantity Surveyors in FM roles using BIM. It contributes to the knowledge of BIM adoption in post-construction. Findings will be useful to develop strategies for adopting BIM in FM and supporting Quantity Surveyors' roles in FM.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 July 2020

Ruwini Edirisinghe and Jin Woo

Effective use of post-occupancy evaluation (POE) data – quantitative physical measurements and qualitative occupants’ perceptions are limited due to practical challenges and…

1333

Abstract

Purpose

Effective use of post-occupancy evaluation (POE) data – quantitative physical measurements and qualitative occupants’ perceptions are limited due to practical challenges and research gaps. Although building information modelling (BIM) has enabled a paradigm shift in the architecture, engineering and construction (AEC) industries, its use in facility management (FM) is still infancy. Limited research has used building performance data to enable changes to BIM models for the benefit of FM. This paper aims to propose the innovative process to collect and contextualize two fragmented types of POE data sets by filling methodological gap in POE research. Moreover, it presents innovative modelling techniques to facilitate BIM as a more effective platform to visualize such currently fragmented data sets in real-time while enabling a decision-making model to benefit facility managers.

Design/methodology/approach

The paper presents a process of capturing cloud-based POE data, both wireless sensor network-based physical measurement data and mobile app-based occupant perception data. Real-time capture and visualization of such building performance data was demonstrated through a pilot data collection. Subsequently, the innovative visualization of the cloud connected data is supported by a prototype game engine-based BIM model.

Findings

Cloud-based POE data, both quantitative physical measurements and qualitative occupants’ reported perceptions, can be effectively used in FM practice with the use of innovative data capture and visualization techniques in a beneficial manner for facility operation and management decisions. This paper also demonstrates the ability of BIM to serve as a “single source of truth” to support post-construction building performance data.

Originality/value

While addressing a number of research gaps, the paper provides a holistic approach to BIM-based performance monitoring for smart FM to achieve the ultimate vision of BIM enabled FM. The innovative system is expected to provide a powerful and practical tool for data collection, analysis and visualization for intelligent facility management decision making. This paper contributes to fill an important research and practice gap in the area of next generation smart building management practices.

Details

Facilities, vol. 39 no. 1/2
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 5 May 2021

Kalani Chamika Dahanayake and Nipuni Sumanarathna

This paper aims to explore the opportunities of integrating internet of things (IoT) with building information modelling (BIM) to support the digital transformation of facilities…

1565

Abstract

Purpose

This paper aims to explore the opportunities of integrating internet of things (IoT) with building information modelling (BIM) to support the digital transformation of facilities management (FM). In this regard, a conceptual framework is proposed to implement IoT-BIM-based smart FM in buildings.

Design/methodology/approach

A semi-systematic literature review was conducted to examine the opportunities of integrating IoT-BIM-based smart FM.

Findings

BIM models are seldom used during the operations stage, and the comprehensive digital information developed during the design and construction stage is not efficiently used throughout the building’s life cycle. Therefore, this paper suggests that IoT-BIM can be effectively integrated into six FM functions, namely, energy management, operations and maintenance management, space management, FM project management, emergency management and quality management. IoT-BIM provides a beneficial platform for the digital transformation in FM, optimising the effectiveness and efficiency of buildings.

Originality/value

As a recent approach, the integration of BIM with IoT has created a new direction for moving from traditional FM to digitalise smart FM. However, the adaptation of IoT-BIM concept, particularly for FM, is yet to be explored. Hence, this paper contributes to the IoT-BIM research in the FM domain by highlighting six IoT-BIM-based smart FM for digital transformation in FM.

Details

Journal of Facilities Management , vol. 20 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 1 October 2018

Daramola Thompson Olapade and Benjamin Gbolahan Ekemode

This paper aims to examine the awareness and utilisation of building information modelling (BIM) for facility management (FM) among FM companies in Lagos, Nigeria. This was with a…

Abstract

Purpose

This paper aims to examine the awareness and utilisation of building information modelling (BIM) for facility management (FM) among FM companies in Lagos, Nigeria. This was with a view of increasing the awareness level and promoting adoption of BIM in FM practice.

Design/methodology/approach

Primary data used for the study were sourced through questionnaire administered on the 37 FM companies that are corporate members of International Facility Management Association in Lagos, Nigeria. Frequency distribution and relative significance index were used for data analysis.

Findings

Findings of the study suggest a low level of awareness and adoption of BIM for FM in the study area. Only 2 of the 31 FM companies surveyed were using BIM for their FM services. Also, the majority of the respondents (n = 22, 71 per cent) perceived that the awareness of BIM in the facilities management industry in Nigeria is very low.

Practical implications

The findings of this study provided industry stakeholders with information on the level of awareness and utilisation of BIM for FM practice in Nigeria, thereby giving insights on the possible integration of BIM with FM practices in developing countries.

Originality/value

The paper is a pioneer research on the awareness and utilisation of BIM for facilities management from the perspective of an emerging property market like Nigeria.

Details

Journal of Facilities Management, vol. 16 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 6 October 2022

Ahmed Gouda Mohamed and Amr Mousa

Current research efforts exhibit a surge imperative for a building information modelling (BIM) approach that embodies a repository of all relevant data of existing building…

Abstract

Purpose

Current research efforts exhibit a surge imperative for a building information modelling (BIM) approach that embodies a repository of all relevant data of existing building components while monitoring and consistently recording numerous components’ functions throughout its lifecycle, especially in Egypt. This research paper aims to develop an integrated as-is BIM-facility management (FM) information model for the existing building’s components via a case study, depicting a repository for historical data and knowledge amassed from inspections and conveying maintenance decisions automatically during the FM practices.

Design/methodology/approach

The developed approach pursues four successive steps: data acquisition and processing of building components; components recognition from point clouds; modelling scanned point clouds; and quick response code information transfer to BIM components.

Findings

The proposed approach incorporates the as-is BIM with the building components’ as-is FM information to portray a repository for historical data and knowledge collected from inspections to proactively benefit facility managers in simplifying, expediting and enhancing maintenance decisions automatically during FM practices.

Originality/value

This paper presents a digital alternative to manual maintenance recordkeeping concerning building components to retrieve their as-is and historical data using a case study in Egypt. This paper proposes a broad scan to as-is information BIM approach for the existing building’s components to condone maintenance interventions using a versatile, affordable, readily available and multi-functional method for scanning the building’s components using a handheld tool.

Details

Journal of Facilities Management , vol. 22 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

1 – 10 of 139