Search results
1 – 10 of over 2000Pengcheng Pan, Yu Wang, Yumiao Yang and Sujuan Zhang
Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in…
Abstract
Purpose
Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in the architectural, engineering, construction, and operation industry. However, limited research has focused on a project owner organization perspective to investigate owner BIM capabilities that are required to ensure effective project management and delivery. This present study aims to propose an indicator framework to evaluate owner BIM capabilities at the organizational level.
Design/methodology/approach
Leveraging the existing literature on BIM capabilities and synthesizing insights from the resource-based view and information technology capabilities research, this study conceptualizes the BIM capabilities of project owner organizations and offers a framework of indicators for measurement. Semi-structured interviews with BIM experts and a questionnaire survey were conducted to identify key indicators affecting owner BIM capabilities. A six-dimensional structural equation model with 29 indicators was then established.
Findings
The findings highlight the multidimensionality of owner BIM capabilities and show that process capabilities play a crucial role in enhancing owner BIM capabilities, while technical capabilities are considered as the least important aspect.
Research limitations/implications
The study sheds light on the key role of project owner organizations in ensuring BIM value and suggests that project owners focus more on the organizational processes of introducing BIM in managing projects.
Originality/value
This study reconceptualizes owner BIM capabilities drawing on the idea of resource-based view and information technology capabilities and highlights the important dimensions and indicators of owner BIM capabilities at the organizational level.
Details
Keywords
Onaopepo Adeniyi, Niraj Thurairajah and Feyisetan Leo-Olagbaye
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction…
Abstract
Purpose
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.
Design/methodology/approach
The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.
Findings
Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.
Research limitations/implications
This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.
Practical implications
The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.
Originality/value
The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.
Details
Keywords
Ritu Ahuja, Anil Sawhney and Mohammed Arif
The purpose of this paper is to describe the process through which an organization develops organizational capabilities by tapping the technical skills and social skills of its…
Abstract
Purpose
The purpose of this paper is to describe the process through which an organization develops organizational capabilities by tapping the technical skills and social skills of its employees in the use of Building Information Modeling (BIM) to deliver lean and green project outcomes. The resulting framework for BIM-based organizational capabilities development comprising of three hierarchical layers – technology, process and outcomes – is explained.
Design/methodology/approach
For this study, BIM has been identified as an enabler and a process for achieving lean and green outcomes on construction projects. Based on a detailed literature review, this paper identifies the organizational capabilities needed by the architecture, engineering and construction organizations to effectively implement BIM on construction projects. The study has been conducted through a sequential mixed-method approach involving semi-structured interviews, focus groups and qualitative comparative analyses.
Findings
It was discovered that to attain desired project outcomes, an organization needs to embrace an underlying BIM adoption culture not only within its project teams but also within the organization as a whole. The study also concluded that an integrated approach to BIM usage – connecting it with lean and green initiatives – on construction projects resulted in improved project outcomes, especially ones targeting lean and green aspects of improvements.
Practical implications
The proposed outline for BIM-based organizational capabilities will help the organizations focus on the “human factors” along with the technical factors while striving for successful usage within their organizations.
Originality/value
Using the organizational capabilities matrix, this paper highlights the importance of technical and social skill sets of an individual employee and their role in developing the organizational capabilities to gain the desired lean and green outcomes.
Details
Keywords
Abdul-Majeed Mahamadu, Lamine Mahdjoubi, Colin Booth, Patrick Manu and Emmanuel Manu
In spite of emerging research on building information modelling (BIM) capability assessment, there is a general dearth of knowledge about the links between often pre-emptive…
Abstract
Purpose
In spite of emerging research on building information modelling (BIM) capability assessment, there is a general dearth of knowledge about the links between often pre-emptive capability measurement attributes and actual delivery success. More so, current studies have not considered success from the wider construction supply chain (CSC) perspective. So far, the perceived importance of capability metrics is not based on post-project evaluations of their contribution to BIM delivery success. This paper aims to identify relevant BIM capability attributes used for qualifying CSC organisations for projects and further aims to investigate their relative importance and influence on some key aspects of BIM delivery success.
Design/methodology/approach
Based on heretofore validated set of BIM capability attributes from semi-structured interviews and a Delphi study, a survey of CSC firms on BIM-enabled projects was used to model the influence of BIM capability attributes on BIM delivery success. Multiple regression modelling was performed to ascertain the nature of the relationship between BIM capability attributes and the key aspects of BIM delivery success as identified from the literature.
Findings
BIM staff experience and the suitability of proposed methodology prior to project commencement were identified as the most influential on BIM delivery quality, as well as delivery within schedule and on budget. Conversely, the administrative and strategic-level capacities were found as the most influential in leveraging collaboration, coordination or integration of the CSC on projects through BIM.
Originality/value
This study provides a step change in prioritising BIM capability criteria based on evidence of their contribution to delivery success in key performance areas, rather than their perceived importance as capability metrics as widely practised.
Details
Keywords
Abdul-Majeed Mahamadu, Patrick Manu, Lamine Mahdjoubi, Colin Booth, Clinton Aigbavboa and F.H. Abanda
The emergence of building information modelling (BIM) has led to the need for pre-qualification and selection of organisations capable of working within a BIM environment. Several…
Abstract
Purpose
The emergence of building information modelling (BIM) has led to the need for pre-qualification and selection of organisations capable of working within a BIM environment. Several criteria have been proposed for the assessment of an organisation’s BIM capability during the pre-qualification and selection phase of projects. However, no studies have sought to empirically establish whether organisations selected on the basis of such criteria have actually been the most successful at delivering BIM on projects. The purpose of this paper is to address the aforementioned gap through a comparison of predicted BIM capability and post-selection performance.
Design/methodology/approach
BIM capability of firms in a case study was predicted using 28 BIM pre-qualification and selection criteria, prioritised based on their perceived contribution to BIM delivery success from a survey of practitioners on BIM-enabled projects. The comparison of predicted BIM capability and post-selection performance was, on the other hand, achieved through the application of the Technique to Order Preference by Similarity to Ideal Solution and fuzzy sets theory (Fuzzy-TOPSIS).
Findings
Findings underscore the reliability of the 28 BIM pre-qualification and selection criteria as well as the priority weightings proposed for their use in predicting BIM capability and likelihood of performance. The findings have highlighted the importance of criteria related as previous BIM use experience as well as information processing maturity as critical indicators of the capability of organisations, particularly design firms.
Originality/value
Overall, the findings highlight the need for prioritisation of BIM pre-qualification and selection criteria on the basis of their actual contribution to delivery success from post-selection evaluation of performance.
Details
Keywords
Yingli Wang, Jonathan Gosling and Mohamed M. Naim
A number of governments are making building information modeling (BIM) a mandatory requirement for all public works construction projects. While main contractors may be ready to…
Abstract
Purpose
A number of governments are making building information modeling (BIM) a mandatory requirement for all public works construction projects. While main contractors may be ready to comply with such requirements, the supply chain as whole may be vulnerable as lower-tier suppliers may not be able to adopt BIM. There is currently no objective approach to assessing BIM maturity; hence, this paper aims to develop a new approach to determine suppliers’ current vision and execution-based capabilities to exploit BIM and their capacity to reach a higher maturity level.
Design/methodology/approach
Based on UK Government BIM maturity levels, the authors exploit a unique data set made available by a main contractor, to determine a data-driven approach, using K-means, to assess the capabilities and vision of its supply base.
Findings
The authors find a direct comparison between our suggested K-means clusters and the UK Government’s BIM maturity levels. However, in interrogating specific cases, the authors find that using a subjective approach would have wrongly categorized certain companies. The authors also determine what capability and strategic developments are required for companies to move to a higher level.
Research limitations/implications
The method aligns with the existing UK BIM maturity model and enhances the model by determining the likelihood of a supplier in progressing to a higher level of maturity. The research was with a single case company, exploiting their existing survey instrument and data. A more comprehensive study could be adopted with a generic survey questionnaire.
Practical implications
The research may be exploited by companies to take a strategic approach to assess suppliers in BIM adoption and to establish supplier development mechanisms.
Originality/value
The data-driven approach avoids ambiguity of categories and mis-categorizing suppliers.
Details
Keywords
Pejman Ghasemi Poor Sabet and Heap-Yih Chong
New methods have been introduced as revolutionary approaches in the construction industry, such as off-site manufacturing (OSM) and building information modelling (BIM). Although…
Abstract
Purpose
New methods have been introduced as revolutionary approaches in the construction industry, such as off-site manufacturing (OSM) and building information modelling (BIM). Although these approaches can provide many benefits, there are still barriers to meeting the expectations of improved construction productivity via their implementation. Hence, the purpose of this paper is to critically review the capabilities of OSM and BIM techniques, as well as their potential interactions, in productivity improvement.
Design/methodology/approach
A scoping review approach was adopted, where 100 peer-reviewed journal articles were collected to analyse the capabilities of OSM and BIM, as well as their potential interactions, in productivity improvement as assessed by key productivity indicators (KPrIs).
Findings
The results reveal seven BIM-based capabilities and six OSM-based capabilities, as well as 12 potential OSM–BIM interactions that have significant potential for satisfying KPrIs.
Originality/value
An integrated framework has also been developed to clarify and conceptualise the roles of OSM–BIM interactions in their designated KPrIs. The research has developed insightful and practical references for strategic planning and management in OSM–BIM-based projects.
Details
Keywords
Hui Liu, Miroslaw J. Skibniewski, Qianqian Ju, Junjie Li and Hongbing Jiang
This study aims to explore the innovative capabilities of building information modeling (BIM) in construction projects. The objectives are to construct an inclusive conceptual…
Abstract
Purpose
This study aims to explore the innovative capabilities of building information modeling (BIM) in construction projects. The objectives are to construct an inclusive conceptual framework of BIM-enabled construction innovation, identify the status and trends of innovation-related research in BIM publications, synthesize research pertaining to BIM-enabled construction innovation and discover core research requirements in the related body of knowledge.
Design/methodology/approach
This study proposes a comprehensive theoretical framework, named innovation pyramid, comprising context, actor, artifact, process, structure and innovative task for exploring and analyzing the innovative capability of BIM in construction projects. Accordingly, mixed methods were used to perform a systematic review of research on the topic of BIM-enabled construction innovation.
Findings
The findings reveal that BIM innovation-related articles have predominantly considered BIM as an innovation from a technological standpoint, while the innovative capabilities of BIM have remained under-researched with a fragmented research focus. Fertile grounds for research have emerged and call for research pertaining to entities of “structure” and “innovative task” as well as interaction, interrelations and mutually adjusting effect among the entities.
Practical implications
The framework proposed may be useful for subsequent research design and for assisting project management practitioners in the use of BIM to achieve innovation more efficiently.
Originality/value
This research provides an insight into the innovative capabilities of BIM based on the BIM–collaboration–construction innovation logic chain. It contributes to the body of knowledge by devising an inclusive conceptual framework of BIM-enabled construction innovation, synthesizing the state of the art and exposing the research needs in this area.
Details
Keywords
Joel Odhiambo Oyuga, Abednego Gwaya and Mugwima Bernard Njuguna
This study aims to focus on the four user characteristics of innovation diffusion (availability, observability and trialability [AOT], simplicity, relative advantage [RA] and…
Abstract
Purpose
This study aims to focus on the four user characteristics of innovation diffusion (availability, observability and trialability [AOT], simplicity, relative advantage [RA] and interoperability) to observe their influence on building information modelling (BIM) usage. This study focuses on the Kenyan construction industry, specifically the building contractors.
Design/methodology/approach
This study uses purposive sampling and specifically focusses on active construction sites that met requirements needed for BIM usage to thrive. Data was collected manually using questionnaires (N = 62).
Findings
This paper contributes to the analysis of the current state of BIM usage by the Kenyan construction industry specifically among building contractors and confirms that Kenya is at the early majority adopters’ stage of diffusion characterised by low BIM usage. In terms of correlation, this study found out that AOT had a strong positive correlation with usage, RA had a moderate positive correlation with usage, simplicity had a weak positive correlation with usage and interoperability had no correlation with usage.
Practical implications
This study gives a clear trend on BIM usage among building contractors to assist potential BIM users make informed decision. The recommendations in this study can be adopted by any late adopter jurisdiction whose structure of the construction industry is similar to Kenya’s.
Originality/value
This paper highlights variables that enable or subdue BIM usage. It goes further to localise and contextualise the barriers for deeper understanding of what makes these barriers be major hindrances towards BIM usage and giving practical solutions to these barriers.
Details
Keywords
John Rogers, Heap-Yih Chong and Christopher Preece
Building Information Modelling (BIM) technology has been well received by the Malaysian construction industry, yet the adoption rate is extremely slow. Many areas of adoption…
Abstract
Purpose
Building Information Modelling (BIM) technology has been well received by the Malaysian construction industry, yet the adoption rate is extremely slow. Many areas of adoption issues and know how regarding BIM were investigated. However, no prior research has considered the perspective from engineering consulting services (ECS) firms. Therefore, the purpose of this paper is to explore the overview and adoption of BIM from the perspective of Malaysian ECS firms, with its objectives first, to determine the perceptions, barriers, governmental support and intentions in adopting BIM, and second, to identify the key drivers for adopting BIM within two years.
Design/methodology/approach
The primary data were collected from focus group interview and questionnaire survey to achieve the first objective, and subsequently, the second objective was achieved based on Pearson relationship analysis.
Findings
The results show that the firms have a concept of BIM that equates to industry authorities’ norms; yet the lack of well-trained personnel, guidance and governmental supports were identified as the main barriers to adoption. Nevertheless, the firms were prepared to adopt BIM where market demands and competitive advantage were the main drivers to adoption within two years.
Originality/value
A different perspective has been highlighted in adoption of BIM. It renders a new insight into the effective adoption and use of BIM from the ECS firms’ perspective.
Details