Search results

1 – 10 of 18
Open Access
Article
Publication date: 28 February 2024

Hassan Th. Alassafi, Khalid S. Al-Gahtani, Abdulmohsen S. Almohsen and Abdullah M. Alsugair

Heating, ventilating, air-conditioning and cooling (HVAC) systems are crucial in daily health-care facility services. Design-related defects can lead to maintenance issues…

Abstract

Purpose

Heating, ventilating, air-conditioning and cooling (HVAC) systems are crucial in daily health-care facility services. Design-related defects can lead to maintenance issues, causing service disruptions and cost overruns. These defects can be avoided if a link between the early design stages and maintenance feedback is established. This study aims to use experts’ experience in HVAC maintenance in health-care facilities to list and evaluate the risk of each maintenance issue caused by a design defect, supported by the literature.

Design/methodology/approach

Following semistructured interviews with experts, 41 maintenance issues were identified as the most encountered issues. Subsequently, a survey was conducted in which 44 participants evaluated the probability and impact of each design-caused issue.

Findings

Chillers were identified as the HVAC components most prone to design defects and cost impact. However, air distribution ducts and air handling units are the most critical HVAC components for maintaining healthy conditions inside health-care facilities.

Research limitations/implications

The unavailability of comprehensive data on the cost impacts of all design-related defects from multiple health-care facilities limits the ability of HVAC designers to furnish case studies and quantitative approaches.

Originality/value

This study helps HVAC designers acquire prior knowledge of decisions that may have led to unnecessary and avoidable maintenance. These design-related maintenance issues may cause unfavorable health and cost consequences.

Open Access
Article
Publication date: 9 November 2023

Abdulmohsen S. Almohsen, Naif M. Alsanabani, Abdullah M. Alsugair and Khalid S. Al-Gahtani

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the…

Abstract

Purpose

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the quality of the owner's estimation for predicting precisely the contract cost at the pre-tendering phase and avoiding future issues that arise through the construction phase.

Design/methodology/approach

This paper integrated artificial neural networks (ANN), deep neural networks (DNN) and time series (TS) techniques to estimate the ratio of a low bid to the OEC (R) for different size contracts and three types of contracts (building, electric and mechanic) accurately based on 94 contracts from King Saud University. The ANN and DNN models were evaluated using mean absolute percentage error (MAPE), mean sum square error (MSSE) and root mean sums square error (RMSSE).

Findings

The main finding is that the ANN provides high accuracy with MAPE, MSSE and RMSSE a 2.94%, 0.0015 and 0.039, respectively. The DNN's precision was high, with an RMSSE of 0.15 on average.

Practical implications

The owner and consultant are expected to use the study's findings to create more accuracy of the owner's estimate and decrease the difference between the owner's estimate and the lowest submitted offer for better decision-making.

Originality/value

This study fills the knowledge gap by developing an ANN model to handle missing TS data and forecasting the difference between a low bid and an OEC at the pre-tendering phase.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

1016

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 28 June 2022

Sahar Jawad, Ann Ledwith and Rashid Khan

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…

1708

Abstract

Purpose

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.

Findings

Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.

Practical implications

The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.

Originality/value

This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 23 April 2024

Anna Kadefors, Kirsi Aaltonen, Stefan Christoffer Gottlieb, Ole Jonny Klakegg, Pertti Lahdenperä, Nils O.E. Olsson, Lilly Rosander and Christian Thuesen

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level…

Abstract

Purpose

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level learning in this field. This paper employs an institutional perspective to analyze how legitimacy for relational contracting has been produced and challenged in Denmark, Finland, Norway and Sweden, including implications for dissemination and learning.

Design/methodology/approach

A collaborative case study design is used, where longitudinal accounts of the developments in relational contracting over more than 25 years in four Nordic countries were developed by scholars based in each country. The descriptions are underpinned by literature sources from research, practice and policy.

Findings

The countries share similar problem perceptions that have triggered the de-institutionalization of traditional contracting practices. Models and policies developed elsewhere are important sources of knowledge and legitimacy. Most countries have seen pendulum movements, where dissemination of relational contracting is followed by backlashes when projects fail to meet projected outcomes. Before long, however, relational contracting tends to re-emerge under new labels and in slightly new forms. Such a proliferation of concepts presents further obstacles to learning. Successful institutionalization is found to rely on realistic goals in combination with broad competence development at the organizational and industry levels.

Practical implications

In seeking inspiration from other countries, policymakers should go beyond contract models to also consider strategies to manage industry-level learning.

Originality/value

The paper provides a unique longitudinal cross-country perspective on the field of relational contracting. As such, it contributes to the small stream of literature on long-term institutional change in the construction sector.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 16 April 2024

Richard Kadan and Jan Andries Wium

Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to…

Abstract

Purpose

Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to identify the dominant construction supply chain risk (CSCR) factors, based on studies conducted between 2002 and 2022.

Design/methodology/approach

The study adopts the preferred reporting items for systematic reviews and meta-analysis (PRISMA) procedure to identify, screen and select relevant articles in order to provide a bibliography and annotation of the prevalent risks in the supply chains. A descriptive analysis of the findings then follows.

Findings

The study’s findings have highlighted the three most prevalent risks in the construction supply chain (poor communication across project teams, changes in foreign currency rate, unfavorable climate conditions) as reported in literature, that project teams need to pay closer attention to and take proactive steps to mitigate.

Research limitations/implications

Due to limitations imposed by the chosen research methodology, tools, time frame and article availability, the study was unable to examine all CSCR-related papers.

Practical implications

The results will serve as a useful roadmap for risk/supply chain managers in the construction industry to take strategically proactive steps towards allocating resources for CSCR mitigation efforts.

Social implications

Context-specific research on the impact of social and cultural risks on the construction supply chain would be beneficial, due to emerging social network risk factors and the complex socio-cultural settings.

Originality/value

There is presently no study that has reviewed extant studies to identify and compile the dominant risk factors (DRFs) associated with the supply chain of construction projects for ranking in the supply chain risk management process.

Details

Frontiers in Engineering and Built Environment, vol. 4 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 16 May 2024

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

The sustainability of the construction industry is associated with the productivity, profitability and competitiveness of the firms, which are significantly affected by…

Abstract

Purpose

The sustainability of the construction industry is associated with the productivity, profitability and competitiveness of the firms, which are significantly affected by inefficient site supervision and labour management approaches. This study aims to use a case study with mixed methods to evaluate the site supervisory characteristics in labour management, labour performance assessment and labour productivity measurement towards developing meaningful guidelines in polishing construction supervision attributes.

Design/methodology/approach

Well-developed modern apprenticeship elements were applied to 62 construction supervisors who were selected using the snowball sampling method, and their relevant competency characteristics were assessed using a comprehensively developed grading mechanism connected with useful training manuals/tools. Academic reviews, experts’ consultations and other meticulous mixed approaches were applied at different stages of the research plan’s sequential layout.

Findings

The mean performance scores of supervisors indicate proficient-level grades in the competency characteristics related to applying efficient labour management procedures and developing-level grades in designing productivity measurement tools, performing assessments on efficiency and productivity and proposing enhancement practices on efficiency and productivity for site operations. The findings point to a modern generalised guideline that establishes the ranges of supervisory attributes within the scope of the study. The validity, reliability, adaptability and generalisability of the findings were assured by using pertinent statistical tests and professional assessments.

Research limitations/implications

Though the study’s conclusions/findings are primarily applicable to the construction environment of a developing country comparable to the Sri Lankan context, they will considerably impact current/future industrial practices in various other countries and emerging industries.

Originality/value

The research has produced a conceptualised modern tool that guides determining the capacity levels of supervisory attributes for carrying out labour management, labour performance assessment and labour productivity measurement aspects in construction. The research has opened a pump that inflows new values of highly workable supervision features for strengthening the site management structures and filling the industry’s knowledge vacuum in the methodical execution of apprenticeships.

Details

Journal of Responsible Production and Consumption, vol. 1 no. 1
Type: Research Article
ISSN: 2977-0114

Keywords

Open Access
Article
Publication date: 20 May 2024

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Productivity increase is correlated with profitability, sustainability and competitiveness of the construction firms. Recent studies reveal that the primary causes of productivity…

Abstract

Purpose

Productivity increase is correlated with profitability, sustainability and competitiveness of the construction firms. Recent studies reveal that the primary causes of productivity decline are poor usage of scientific and technological advances, ineffective supervision strategies and poor apprenticeship facilities/opportunities. Accordingly, the purpose of this study was to evaluate how well construction supervisors can utilise fundamental science and technological concepts/ideas to increase the efficiency and productivity of construction activities.

Design/methodology/approach

A new strategic layout was designed with the use of potential training guide tools. Based on the designed layout, a new supervisory training programme was developed, and 62 construction supervisors were selected, trained and evaluated in line with six parts of competencies and the relevant learning domains. An assessment guide with different levels of descriptions and criteria was developed through literature analysis and expert interviews. The research tools were verified using comprehensive approaches.

Findings

The overall mean values of supervisors’ performance scores indicate proficient-level grades in the competency characteristics related to taking measurements, generating drawings/designs using manual techniques and computer-aided tools, involving Bill of Quantities (BOQ) preparations and preparing training plans/materials for improving the competencies of labourers on estimation, measurements and understanding drawings. Their proficiency was notably lower in the use of information and communication technology application tools in construction tasks compared to others. The findings point to a modern generalised guideline that establishes the ranges of supervisory attributes associated with science and technology-related applications.

Research limitations/implications

The study outcomes produce conceptualised projections to restructure and revalue the job functions of various working categories by adding new definitions within the specified scope. This may result in constructive benefits to upgrading the current functions associated with urbanisation, sustainability and society. The implementation of the study’s findings/conclusions will have a significant impact on present and future practices in other developing nations and developing industries, even if they are directly applicable to the Sri Lankan construction industry.

Originality/value

Up to certain limits/stages, the study fills not only the knowledge gap in the field of creating protocols and application techniques connected to lifelong learning and skill enhancement/upgrading but also the existing gaps in work attributes and roles of construction supervisors associated with the utilisation of fundamental science and technological concepts/ideas towards reinforcing sustainable and productive site operations.

Details

Urbanization, Sustainability and Society, vol. 1 no. 1
Type: Research Article
ISSN: 2976-8993

Keywords

Open Access
Article
Publication date: 27 May 2024

Priscilla Huldt Navarro and Linnea Haag

The purpose of this paper is to explore how process management (PM) can support small- and medium-sized enterprises (SMEs) in pursuing sustained competitive advantage. For this…

Abstract

Purpose

The purpose of this paper is to explore how process management (PM) can support small- and medium-sized enterprises (SMEs) in pursuing sustained competitive advantage. For this purpose, a dynamic capabilities (DC) lens was used.

Design/methodology/approach

A narrative literature review and a multiple case study with an action research approach at two road freight transport companies were used.

Findings

PM provides structure and system thinking to support the development of competitive advantage. Concerning PM, management of knowledge, management style and process orientation are key factors for the generation of competitive advantage for SMEs.

Research limitations/implications

This study contributes to PM literature by studying its support for and implementation at SMEs. Furthermore, the study contributes to the literature on DC by providing concrete examples of activities linked to such capabilities.

Practical implications

This study contributes to practitioners by providing examples of implementing PM and identifying competitive advantage, connected with PM elements.

Social implications

This study has social and environmental implications for the quality of life of the Swedish people.

Originality/value

This paper contributes to clarifying the connection between the research fields of quality management and DC to explore how PM can support SMEs in pursuing sustained competitive advantage.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Access

Only content I have access to

Year

Last week (18)

Content type

1 – 10 of 18