Article
Publication date: 17 April 2024

Zul-Atfi Ismail

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance…

Abstract

Purpose

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.

Findings

This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.

Originality/value

The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.

Details

Facilities , vol. 42 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 23 January 2024

Chinedu Onyeme and Kapila Liyanage

This study investigates the integration of Industry 4.0 (I4.0) technologies with condition-based maintenance (CBM) in upstream oil and gas (O&G) operations, focussing on…

86

Abstract

Purpose

This study investigates the integration of Industry 4.0 (I4.0) technologies with condition-based maintenance (CBM) in upstream oil and gas (O&G) operations, focussing on developing countries like Nigeria. The research identifies barriers to this integration and suggests solutions, intending to provide practical insights for improving operational efficiency in the O&G sector.

Design/methodology/approach

The study commenced with an exhaustive review of extant literature to identify existing barriers to I4.0 implementation and contextualise the study. Subsequent to this foundational step, primary data are gathered through the administration of carefully constructed questionnaires targeted at professionals specialised in maintenance within the upstream O&G sector. A semi-structured interview was also conducted to elicit more nuanced, contextual insights from these professionals. Analytically, the collected data were subjected to descriptive statistical methods for summarisation and interpretation with a measurement model to define the relationships between observed variables and latent construct. Moreover, the Relative Importance Index was utilised to systematically prioritise and rank the key barriers to I4.0 integration to CBM within the upstream O&G upstream sector.

Findings

The most ranked obstacles in integrating I4.0 technologies to the CBM strategy in the O&G industry are lack of budget and finance, limited engineering and technological resources, lack of support from executives and leaders of the organisations and lack of competence. Even though the journey of digitalisation has commenced in the O&G industry, there are limited studies in this area.

Originality/value

The study serves as both an academic cornerstone and a practical guide for the operational integration of I4.0 technologies within Nigeria's O&G upstream sector. Specifically, it provides an exhaustive analysis of the obstacles impeding effective incorporation into CBM practices. Additionally, the study contributes actionable insights for industry stakeholders to enhance overall performance and achieve key performance indices (KPIs).

Details

International Journal of Quality & Reliability Management, vol. 41 no. 6
Type: Research Article
ISSN: 0265-671X

Keywords

Open Access
Article
Publication date: 30 August 2022

Petteri Annunen, Juho Tella, Sini Pekki and Harri Haapasalo

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the…

1912

Abstract

Purpose

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the elements for creating the maintenance capability and the process to be used in construction life cycle projects for buildings.

Design/methodology/approach

An inductive and qualitative research method was used to construct the proposed process based on the literature and 18 interviews in two large construction companies.

Findings

The results indicate that the maintenance phase is usually overlooked during the design and construction phases, and capabilities are not systematically built. In particular, processes are lacking in data management, causing severe problems in maintenance.

Originality/value

This study presents a process including key requirements and activities for creating maintenance capability in conjunction with the design and construction phases, which is novel to the literature. The validated process can be adapted based on the needs of the construction company.

Details

Journal of Facilities Management , vol. 22 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 7 December 2022

Ahmed Mohammed, Tarek Zayed, Fuzhan Nasiri and Ashutosh Bagchi

This paper extends the authors’ previous research work investigating resilience for municipal infrastructure from an asset management perspective. Therefore, this paper aims to…

Abstract

Purpose

This paper extends the authors’ previous research work investigating resilience for municipal infrastructure from an asset management perspective. Therefore, this paper aims to formulate a pavement resilience index while incorporating asset management and the associated resilience indicators from the authors’ previous research work.

Design/methodology/approach

This paper introduces a set of holistic-based key indicators that reflect municipal infrastructure resiliency. Thenceforth, the indicators were integrated using the weighted sum mean method to form the proposed resilience index. Resilience indicators weights were determined using principal components analysis (PCA) via IBM SPSS®. The developed framework for the PCA was built based on an optimization model output to generate the required weights for the desired resilience index. The output optimization data were adjusted using the standardization method before performing PCA.

Findings

This paper offers a mathematical approach to generating a resilience index for municipal infrastructure. The statistical tests conducted throughout the study showed a high significance level. Therefore, using PCA was proper for the resilience indicators data. The proposed framework is beneficial for asset management experts, where introducing the proposed index will provide ease of use to decision-makers regarding pavement network maintenance planning.

Research limitations/implications

The resilience indicators used need to be updated beyond what is mentioned in this paper to include asset redundancy and structural asset capacity. Using clustering as a validation tool is an excellent opportunity for other researchers to examine the resilience index for each pavement corridor individually pertaining to the resulting clusters.

Originality/value

This paper provides a unique example of integrating resilience and asset management concepts and serves as a vital step toward a comprehensive integration approach between the two concepts. The used PCA framework offers dynamic resilience indicators weights and, therefore, a dynamic resilience index. Resiliency is a dynamic feature for infrastructure systems. It differs during their life cycle with the change in maintenance and rehabilitation plans, systems retrofit and the occurring disruptive events throughout their life cycle. Therefore, the PCA technique was the preferred method used where it is data-based oriented and eliminates the subjectivity while driving indicators weights.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 21 May 2024

Adel Ali Ahmed Qaid, Rosmaini Ahmad, Shaliza Azreen Mustafa and Badiea Abdullah Mohammed

This study presents a systematic framework for maintenance strategy development of manufacturing process machinery. The framework is developed based on the reliability-centred…

Abstract

Purpose

This study presents a systematic framework for maintenance strategy development of manufacturing process machinery. The framework is developed based on the reliability-centred maintenance (RCM) approach to minimise the high downtime of a production line, thus increasing its reliability and availability. A case study of a production line from the ghee and soap manufacturing industry in Taiz, Yemen, is presented for framework validation purposes. The framework provides a systematic process to identify the critical system(s) and guide further investigation for functional significant items (FSIs) based on quantitative and qualitative analyses before recommending appropriate maintenance strategies and specific tasks.

Design/methodology/approach

The proposed framework integrates conventional RCM procedure with the fuzzy computational process to improve FSIs criticality estimation, which is the main part of failure mode effect criticality analysis (FMECA) applications. The framework consists of four main implementation stages: identification of the critical system(s), technical analysis, Fuzzy-FMECA application for FSIs criticality estimation and maintenance strategy selection. Each stage has its objective(s) and related scientific techniques that are applied to systematically guide the framework implementation.

Findings

The proposed framework validation is summarised as follows. The first stage results demonstrate that the seaming system (top and bottom systems) caused 50% of the total production line downtime, indicating it is a critical system that requires further analysis. The outcomes of the second stage provide significant technical information on the subject (seaming system), helping team members to identify and understand the structure and functional complexities of the seaming system. This stage also provides a better understanding of how the seaming system functions and how it can fail. In stage 3, the application of FMECA with the fuzzy computation integration process presents a systematic way to analyse the failure mode, effect and cause of items (components of the seaming system). This stage also includes items’ criticality estimation and ranking assessment. Finally, stage four guides team members in recommending the appropriate countermeasures (maintenance strategies and task selection) based on their priority level.

Originality/value

This paper proposes an original maintenance strategies development framework based on the RCM approach for production system equipment. Specifically, it considers a fuzzy computational process based on the Gaussian function in the third stage of the proposed framework. Adopting the fuzzy computational process improves the risk priority number (RPN) estimation, resulting in better criticality ranking determination. Another significant contribution is introducing an extended item criticality ranking assessment process to provide maximum levels of criticality item ranking. Finally, the proposed RCM framework also provides detailed guidance on maintenance strategy selection based on criticality levels, unique functionality and failure characteristics of each FSI.

Details

Journal of Quality in Maintenance Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 5 August 2022

Oti Amankwah, Weng-Wai Choong and Naana Amakie Boakye-Agyeman

Although the quality of health-care infrastructure and equipment influences patient’s overall health-care experience, health-care infrastructure and equipment are not always…

Abstract

Purpose

Although the quality of health-care infrastructure and equipment influences patient’s overall health-care experience, health-care infrastructure and equipment are not always managed and maintained with the attention required. This is due mainly to the complexity of health-care infrastructure and equipment and shortage of maintenance budget. This study aims to determine if patient’s satisfaction of core health-care business is mediated by the quality of health-care infrastructure and equipment.

Design/methodology/approach

This cross-sectional study comprises 622 adult patients at the Physician OPD and Polyclinic of Komfo Anokye Teaching hospital, Tamale Teaching hospital and Cape Coast Teaching hospital in Ghana. Structural equation model Smart PLS was used to analyse the data.

Findings

The study results showed that the quality of health-care infrastructure and equipment has a positive significant influence (mediation) on the relationship between health-care delivery and patient’s satisfaction as well as the relationship between adequacy of health-care resources and patient’s satisfaction. However, it was shown not to have a positive significant influence (mediation) on the relationship between quality of health-care personnel and patients’ satisfaction as well as health-care administrative process and patient’s satisfaction.

Research limitations/implications

First, the study findings are centred on cross-sectional data, which capture the opinion of the patients at a specific time period instead of over a period of time. Consequently, in future, though difficult to achieve, a longitudinal study can be piloted to provide more insight. Second, the data was collected from only one country (Ghana); thus, the ability to generalise the results may be a challenge.

Practical implications

The implication of this study is that there is the need to prudently maintain hospital infrastructure and equipment in good working condition as it has a positive effect on patients’ satisfaction of their overall health-care experience.

Originality/value

Most studies have concentrated on patient’s health-care experience. This study extends the knowledge of patient’s health-care experience by determining the mediating role of quality of health-care infrastructure and equipment on the relationship between patient’s satisfaction and core health-care business. There are limited studies of such nature in Ghana. Therefore, this study will provide invaluable empirical data for the health-care sector of a developing African country.

Details

Journal of Facilities Management , vol. 22 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 29 March 2024

Esra Keskin, Eunhwa Yang, Harun Tanrıvermiş and Monsurat Ayojimi Salami

The facility management (FM) sector, which is developing rapidly, is making slower progress in Turkey compared to Europe and the USA. This paper aims to research the underlying…

Abstract

Purpose

The facility management (FM) sector, which is developing rapidly, is making slower progress in Turkey compared to Europe and the USA. This paper aims to research the underlying issues leading to FM practices and offer insights into the implications of FM-related policies, especially for large urban transformation projects.

Design/methodology/approach

The study used a mixed-methods research design and collected qualitative data through semi-structured interviews with building/site managers and quantitative data through structured surveys with residents. Forty-nine building/site managers and 660 residents participated in the interview and survey from Turkey’s North Ankara and Dikmen Valley urban transformation projects.

Findings

The FM by residents, performed by the managers selected among homeowners, was preferred to the professional FM in Turkey. Education level, age, homeownership and duration of living in the region were associated with selecting FM practices. Cost also had an important place among the selection criteria, and the standard view from the residents was that professional FM would cause a cost increase. However, interviews with building/site managers in North Ankara and Dikmen Valley Urban Transformation areas revealed that a significant part of the problem resulted from insufficient knowledge and experience in FM.

Research limitations/implications

Within the scope of the research, two urban transformation projects in Ankara Province were selected, and the survey was limited to the North Ankara Entrance Urban Transformation Project and Dikmen Valley Urban Transformation Project areas. Although there is a need to improve the understanding of FM in all facilities, built environments and collective buildings, collective buildings in urban transformation areas due to several constraints, those other identified areas are postponed for future study. In addition, collective buildings located in transformation areas differ from others in discussing the social dimension and the impact of management.

Social implications

Within the scope of the research, two urban transformation projects in Ankara Province were selected, and the survey was limited to the North Ankara Entrance Urban Transformation Project and Dikmen Valley Urban Transformation Project areas. Although there is a need to improve the understanding of FM in all facilities, due to several constraints built environments and collective buildings in urban transformation areas, are postponed for future study. In addition, collective buildings located in transformation areas differ from others in discussing the social dimension and the impact of management.

Originality/value

This study evaluates two different FM approaches: FM by residents and professional FM, implemented in Turkey and identifies the criteria for choosing the FM practice. In addition, both building/site managers and residents evaluate different perspectives on FM. This study is unique because it compares different FM practices in Turkey and the criteria for residents to prefer different FM practices.

Details

Facilities , vol. 42 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 6 May 2024

Marcelo Miguel da Cruz, Rodrigo Goyannes Gusmão Caiado, Tiago F.A.C. Sigahi, Rosley Anholon, Osvaldo L.G. Quelhas and Izabela Simon Rampasso

The purpose of this paper was to understand the difficulties related to asset management observed by experts in Brazilian organizations in light of the requirements outlined in…

Abstract

Purpose

The purpose of this paper was to understand the difficulties related to asset management observed by experts in Brazilian organizations in light of the requirements outlined in the ISO 55001:2014 standard.

Design/methodology/approach

A survey was performed with asset management experts. The collected data were analyzed using frequency analysis, hierarchical cluster analysis and fuzzy technique for order preference by similarity to deal solution (TOPSIS).

Findings

Based on data analysis, the most critical difficulties observed were related to managing and controlling the impact of changes in the company that affect asset management objectives; to the committing to and supporting the asset management system by the top management of the organization; to manage the processes for dealing with risks and opportunities for the asset management system and plans, and correcting failures in asset performance; and to plan and conduct actions in an integrated manner to identify and minimize adverse impacts associated with the asset management system, and afterwards verifying their effectiveness.

Originality/value

The findings of this study have important theoretical and practical contributions, since they indicate the most critical points observed in asset management in Brazil, which can be used as a source for future research and by professionals to prioritize difficulties in future planning and develop action plans to overcome them. The step-by-step methodological approach presented in this study provides professionals and researchers with a replicable method of identifying potential asset management difficulties in a given specific reality.

Details

Journal of Quality in Maintenance Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 30 April 2024

Sulakshya Gaur and Abhay Tawalare

Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design…

Abstract

Purpose

Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design variation, etc. thereby impacting the project budget, waste generation and schedule. An overarching impact of this is witnessed in the sustainability dimensions of the project, mainly in terms of economic and environmental aspects. This work, therefore, aims to assess the implications of a technological process, in the form of building information modelling (BIM), that can smoothen the design process and mitigate the risks, thus impacting the sustainability of the project holistically.

Design/methodology/approach

The identified design risks in construction projects from the literature were initially analysed using a fuzzy inference system (FIS). This was followed by the focus group discussion with the project experts to understand the role of BIM in mitigating the project risks and, in turn, fulfilling the sustainability dimensions.

Findings

The FIS-based risk assessment found seven risks under the intolerable category for which the BIM functionalities associated with the common data environment (CDE), data storage and exchange and improved project visualization were studied as mitigation approaches. The obtained benefits were then subsequently corroborated with the achievement of three sustainability dimensions.

Research limitations/implications

The conducted study strengthens the argument for the adoption of technological tools in the construction industry as they can serve multifaceted advantages. This has been shown through the use of BIM in risk mitigation, which inherently impacts project sustainability holistically.

Originality/value

The impact of BIM on all three dimensions of sustainability, i.e. social, economic and environmental, through its use in the mitigation of critical risks was one of the important findings. It presented a different picture as opposed to other studies that have mainly been dominated by the use of BIM to achieve environmental sustainability.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords