1 – 10 of 49Peng Nie, Kalani C. Dahanayake and Nipuni Sumanarathna
This paper aims to explore UAE's transition towards circular economy (CE) through construction and demolition waste (CDW) management in the pre-construction stage. The extent of…
Abstract
Purpose
This paper aims to explore UAE's transition towards circular economy (CE) through construction and demolition waste (CDW) management in the pre-construction stage. The extent of circularity is assessed by five key aspects of CE, such as policies and strategic frameworks, design for waste prevention, design for disassembly or deconstruction, use of prefabricated elements and CDW management plans.
Design/methodology/approach
Multiple case studies were conducted in the context of the Dubai construction industry (UAE). Three significant and unique construction projects were selected as the cases. Semi-structured interviews were carried out to collect data, and the thematic analysis technique and NVIVO 12 software were used for data analysis.
Findings
Findings reveal several positive initiatives towards CE in the UAE context; yet it is identified that the transition is still at the initial stage. Selected case studies, the best-case scenarios of UAE (i.e. influential cases), demonstrated adequate measures in relation to four key CE aspects out of five. For instance, (a) policies and strategic frameworks such as lean standards, green building standards and standards developed by the local authorities, (b) design for waste prevention (e.g. adherence to the 3R principle, and construction planning with BIM), (c) use of prefabricated elements and application of innovative construction technologies (e.g. 3DPC, DfMA) and (d) CDW management planning such as 3R principle were evident. However, the selected cases hardly showcase designing for disassembly or deconstruction.
Research limitations/implications
The existing CDW practices are mostly conventional, as most constructions in UAE are procured through conventional building materials and methods. Therefore, there is a necessity of encouraging CE principles in CDW management. Even though the transition towards CE was evident in four key CE aspects out of five, the UAE construction industry has yet to adopt more effective CE-based CDW management practices to accelerate the circularity. Hence, it is necessary to enforce standard waste management guidelines, including the 3R principle, to standardise CDW management in UAE and encourage construction practitioners to adhere to CE principles.
Originality/value
The findings of this study provide valuable insights for decision-making processes around CDW management towards a CE. This paper contributes to the literature by bridging the CE concept with CDW management in the pre-construction stage. The study provides insights for industry practitioners for planning CE in terms of policies and strategic frameworks, CDW management planning, construction planning and application of innovative construction technologies.
Details
Keywords
Srividhya Raju Sridharan, Sagar Malsane and Govinda Shashikant Bhutada
The purpose of the paper is to analyse the sequence of forces acting as barriers in the usage of drones in the construction industry using interpretive structural modelling (ISM)…
Abstract
Purpose
The purpose of the paper is to analyse the sequence of forces acting as barriers in the usage of drones in the construction industry using interpretive structural modelling (ISM). The usage of drones in the construction industry is brought out phase-wise with the help of literature and live cases. Barriers to the usage of drones in construction and steps to derive the interaction between them are described in detail.
Design/methodology/approach
The extraction of barriers to the usage of drones in construction is done through cases and supported by the literature. The identification of the interaction between the barriers is done through multi-criteria decision models, namely, ISM and Matriced Impacts Croises Multiplication Appliquee a un Classement (MICMAC) and the results are presented in the form of a hierarchical structure. The paper highlights the potential for the usage of drones in every phase of construction across three stages of construction and eight different applications.
Findings
The findings on the interaction between barriers show that technical and research and development-related barriers have a higher driving power, ultimately influencing negativity among stakeholders in drone usage for construction. By analysing interrelationships between barriers, management can frame suitable strategies to adopt drone usage in projects. Awareness about the strength of certain barriers can help management take steps to mitigate the same.
Research limitations/implications
By analysing interrelationships between barriers, management can frame suitable strategies to adopt drone usage in projects. A major limitation is a restriction of the study area to the Indian subcontinent. However, the authors believe that the results can be applied across countries where drone technology is at the nascent stage.
Practical implications
Awareness about the strength of certain barriers can help stakeholders take steps to mitigate the same.
Social implications
The results of this research also give some inputs to the government’s drone policy for wider usage of drones in the construction industry.
Originality/value
To the best of the authors’ knowledge, most studies on drones in construction industry bring out a list various challenges to their adoption. In this study, the authors have gone further to perform a hierarchical sequencing of barriers to drone adoption based on challenges faced in an emerging economy like India.
Details
Keywords
Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu
Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…
Abstract
Purpose
Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.
Design/methodology/approach
Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.
Findings
The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.
Originality/value
The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.
Details
Keywords
Lichini Nikesha Weerasinghe, Akila Pramodh Rathnasinghe, Himal Suranga Jayasena, Niraj Thurairajah and Menaha Thayaparan
Building information modelling (BIM) claims to be spearheading the modern technological revolution in the global construction industry. While scholars have emphasised the…
Abstract
Purpose
Building information modelling (BIM) claims to be spearheading the modern technological revolution in the global construction industry. While scholars have emphasised the cruciality of BIM, associated costs have been identified as one of the major barriers to successful BIM implementation, as is the case in Sri Lanka. Besides, lean principles (LPs) are known for increasing efficiency, quality and eliminating waste, thereby reducing overall costs. Hence, this research aims at addressing the BIM implementation barrier associated with costs by applying suitable LP, enhancing overall value by minimising value-insignificant activities.
Design/methodology/approach
The study adopted a qualitative research approach. 10 experts with expertise in both BIM and LP were targeted for the primary data collection through semi-structured interviews. The collected data were analysed using manual content analysis.
Findings
Research findings discovered the cost centres that can be applied to the LPs and the effective LPs that can be applied with the cost centres of BIM implementation. The theoretical implication of the study is to provide insights into a potential application of LP for BIM cost centres, whereas practical consequences include the identification of LP's potential to minimise BIM cost centres, ergo, achieving a successful BIM implementation.
Originality/value
This study will be the first of its kind in the Sri Lankan construction industry, intending to apply LP with BIM implementation cost centres to achieve a successful implementation. This research also has paved the way forward for further research on the application of both the BIM and LP concepts for similar construction industries in developing countries across the world and in addressing other BIM implementation barriers.
Details
Keywords
Emmanuel Chidiebere Eze, Douglas Omoregie Aghimien, Clinton Ohis Aigbavboa and Onyinye Sofolahan
This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a…
Abstract
Purpose
This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.
Design/methodology/approach
The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.
Findings
The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.
Practical implications
The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.
Originality/value
While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.
Details
Keywords
Nandini Sharma and Boeing Laishram
Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of…
Abstract
Purpose
Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of quality (COQ) is one such method used to address the concern. However, the absence of measurable COQ factors to monitor quality costs hampers the implementation of COQ framework in the construction industry. Therefore, this study aims to identify COQ factors focused on visible factors (VF) and hidden factors (HF) and the current requirements to achieve it.
Design/methodology/approach
This study is based on Preferred Reporting Items for Systematic Review and Meta-Analyses protocol guidelines. The present study identified 57 articles published between 1992 and 2023 in peer-reviewed journals.
Findings
The findings reveal 22 factors, which are grouped into four categories based on COQ. Through systematic review, the authors observed limited methodological and theoretical diversity. In fact, there are no quantitative frameworks to calculate COQ. The study, therefore, developed a framework comprising four major routes/paths of COQ factors within the framework.
Practical implications
The COQ routes developed through this study will enable the practitioners to meticulously categorise VF and HF, facilitating quantifying of quality throughout the lifecycle of project, which is currently absent from the existing quality assurance/quality control (QA/QC) approach. In addition, these COQ routes stand as essential construction strategies, significantly enhancing outcomes related to time, cost, quality, sustainability and fostering closer relationships within project frameworks.
Originality/value
The current study contributes significantly to the existing body of knowledge by developing various COQ routes and proposing future research directions to address gaps in the literature.
Details
Keywords
Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık
The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…
Abstract
Purpose
The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.
Design/methodology/approach
The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.
Findings
Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.
Originality/value
Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.
Details
Keywords
Hazhar Faris, Mark Gaterell and David Hutchinson
The construction industry is a primary contributor to the development of emerging economies such as the Kurdistan Region of Iraq. However, the sector is underperforming, and…
Abstract
Purpose
The construction industry is a primary contributor to the development of emerging economies such as the Kurdistan Region of Iraq. However, the sector is underperforming, and products are not meeting expectations. A lack of collaboration is considered a significant contributor to these issues. Various researchers have identified factors to improve collaborative approaches. However, there is still a lack of clear frameworks to help implement collaboration in the construction industry, especially in emerging economies. Therefore, this study aims to develop a framework to implement collaboration in the construction industry.
Design/methodology/approach
This article utilises a review of literature, questionnaire and interviews with experts in the construction industry in order to develop a framework to achieve collaboration in construction projects.
Findings
The research presents a framework that distributes the factors of collaboration over the project lifecycle stages in accordance with the Royal Institute of British Architects (RIBA) Plan of Work 2007. Each factor is divided into a set of enabling conditions which must be satisfied to ensure that the given specific factors are delivered. Additionally, the framework suggests appointing a collaboration champion at the beginning of the project to manage the process.
Originality/value
The research contributes to scarce literature about collaboration practices in the Kurdistan Region and in emerging economies in general.
Details
Keywords
Ayman Ahmed Ezzat Othman and Yomna Abdelghany El-Saeidy
The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design…
Abstract
Purpose
The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design process.
Design/methodology/approach
A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, the literature review was used to investigate CW, CW generated during the design process, the design process and ESI. Second, two construction projects were analysed to investigate the role of ESI towards reducing CW generated during the design waste. Third, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to examine their perception and application of ESI towards reducing CW generated during the design process. Based on the results of the above, the research developed a framework to facilitate ESI during the design process to reduce CW.
Findings
Through literature review, the research highlighted the causes of CW generated during the design process and identified the benefits and challenges that encounter ESI in ADFs. Results of data analysis showed that “last-minute changes due to client requirements” was ranked the highest challenges of ESI in ADFs in Egypt followed by “lack of design experience”. Moreover, “providing technical information about materials and equipment and their capabilities” was ranked by respondents as the highest contributions of suppliers during the design process which leads to waste reduction followed by “better estimation of materials and costs”. Finally, respondents stated that “resistance of ADFs to include suppliers in the design phase” was ranked the highest challenge of ESI in the design process followed by “no clear guidelines or policies that organise ESI”.
Research limitations/implications
Because of the conceptual nature of the proposed framework, it has to be tested and validated to ensure its capability to overcome the challenges of ESI as an approach for reducing CW generated during the design process.
Practical implications
This research presents a practical solution to the problem of CW generated during the design process through ESI.
Originality/value
The research discussed the causes of CW originated from the design process and the benefits and challenges of ESI in ADFs. It investigated the perception and application of ESI in ADFs in Egypt. The proposed framework which was designed to facilitate the integration of suppliers in the early stages of the project life cycle represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.
Details
Keywords
Mahesh Babu Purushothaman and Jeff Seadon
This review paper, using a systematic literature review (SLR) approach, aims to unravel the various system-wide waste in the construction industry and highlight the connectivity…
Abstract
Purpose
This review paper, using a systematic literature review (SLR) approach, aims to unravel the various system-wide waste in the construction industry and highlight the connectivity to construction phases, namely men, materials, machines, methods and measurement (5M) and impacting factors.
Design/methodology/approach
This study used an SLR approach and examined articles published since the 2000s to explore the connectivity of system-wide waste to construction phases, 5M and impacting factors. The results are given in table forms and a causal loop diagram.
Findings
Results show that the construction and demolition (CD) waste research carried out from various perspectives is standalone. The review identified ten types of system-wide waste with strong interlinks in the construction industry. The finding highlights connectivity between wastes other than material, labour and time and the wastes' impacting factors. Further, the review results highlighted the solid connectivity for construction phases, 5M, and impacting factors such as productivity (P), delay (D), accidents (A), resource utilisation (R) and cost(C).
Research limitations/implications
SLR methodology limitations include not keeping in phase with the most updated field knowledge. This limitation is offset by choosing the range for literature review within the last two decades. This literature review may not have captured all published articles because the restriction of database access and search was based only on English. Also, fruitful articles hiding in less popular journals may not be included in the well-known database that was searched. Researcher bias of the authors and other researchers that authored the articles referred to is a limitation. These limitations are acknowledged.
Practical implications
This article unravels the construction system-wide waste and the waste's interlinks, which would aid industry understanding and focus on eliminating the waste. The article highlights the connectivity of system-wide wastes to 5M, which would help better understand the causes of the waste. Further, the paper discusses the connectivity of system-wide waste, 5M and P, D, A, R and C that would aid the organisation's overall performance. The practical and theoretical implications include a better understanding of waste types to help capture better data for waste reduction and productivity improvement. The operating managers could use the tracking of wastes to compare estimated and actual resources at every process stage. This article on system-wide waste, 5M and P, D, A, R and C, relationships and their effects can theorize that the construction industry is more likely to identify clear root causes of waste now than previously. The theoretical implications include enhanced understanding for academics on connectivity between waste, 5M and P, D, A, R and C that the academics can use and expand to provide new insights to existing knowledge.
Originality/value
For the first time, this article categorised and highlighted the ten types of waste in construction industries and the industries' connectivity to construction phases, 5M and impacting factors.