Search results

1 – 10 of 153
Article
Publication date: 8 March 2024

Henrik Gislason, Jørgen Hvid, Steffen Gøth, Per Rønne-Nielsen and Christian Hallum

An increasing number of Danish municipalities wish to minimize tax avoidance due to profit shifting in their public procurement. To facilitate this effort, this study aims to…

Abstract

Purpose

An increasing number of Danish municipalities wish to minimize tax avoidance due to profit shifting in their public procurement. To facilitate this effort, this study aims to develop a firm-level indicator to assess the potential risk of profit shifting (PS-risk) from Danish subsidiaries of multinational corporations to subsidiaries in low-tax jurisdictions.

Design/methodology/approach

Drawing from previous research, PS-risk is assumed to depend on the maximum difference in the effective corporate tax rate between the Danish subsidiary and other subsidiaries under the global ultimate owner, in conjunction with the tax regulations relevant to profit shifting. The top 400 contractors in Danish municipalities from 2017 to 2019 are identified and their relative PS-risk is estimated by combining information about corporate ownership structure with country-specific information on corporate tax rates, tax regulations and profit shifting from three independent data sets.

Findings

The PS-risk estimates are highly significantly positively correlated across the data sets and show that 17%–23% of the total procurement sum of the Danish municipalities has been spent on contracts with corporations having a medium to high PS-risk. On average, PS-risk is highest for large non-Scandinavian multinational contractors in sectors such as construction, health and information processing.

Social implications

Danish public procurers may use the indicator to screen potential suppliers and, if procurement regulations permit, to ensure high-PS-risk bidders document their tax practices.

Originality/value

The PS-risk indicator is novel, and to the best of the authors’ knowledge, the analysis provides the first estimate of PS-risk in Danish public procurement.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

Open Access
Article
Publication date: 19 May 2022

Douglas Aghimien, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Nicholas Chileshe and Bhekinkosi Jabulani Dlamini

This paper presents the findings of assessing the strategies required for improved work-life balance (WLB) of construction workers in Eswatini. This was done to improve the…

2256

Abstract

Purpose

This paper presents the findings of assessing the strategies required for improved work-life balance (WLB) of construction workers in Eswatini. This was done to improve the work-life relationship of construction workers and, in turn, improve the service delivery of the construction industry in the country.

Design/methodology/approach

The study adopted a quantitative research approach using a questionnaire administered to construction professionals in the country. The data gathered were analysed using frequency, percentage, Mann–Whitney U test, exploratory and confirmatory factor analysis (CFA).

Findings

The findings revealed that the level of implementation of WLB initiatives in the Eswatini construction industry is still low. Following the attaining of several model fitness, the study found that the key strategies needed for effective WLB can be classified into four significant components, namely: (1) leave, (2) health and wellness, (3) work flexibility, and; (4) days off/shared work.

Practical implications

The findings offer valuable benefits to construction participants as the adoption of the identified critical strategies can lead to the fulfilment of WLB of the construction workforce and by extension, the construction industry can benefit from better job performance.

Originality/value

This study is the first to assess the strategies needed for improved WLB of construction workers in Eswatini. Furthermore, the study offers a theoretical platform for future discourse on WLB in Eswatini, a country that has not gained significant attention in past WLB literature.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 June 2023

Florin Aliu, Alban Asllani and Simona Hašková

Since 2008, bitcoin has continued to attract investors due to its growing capitalization and opportunity for speculation. The purpose of this paper is to analyze the impact of…

Abstract

Purpose

Since 2008, bitcoin has continued to attract investors due to its growing capitalization and opportunity for speculation. The purpose of this paper is to analyze the impact of bitcoin (BTC) on gold, the volatility index (VIX) and the dollar index (USDX).

Design/methodology/approach

The series used are weekly and cover the period from January 2016 to November 2022. To generate the results, the unrestricted vector autoregression (VAR), structural vector autoregression (SVAR) and wavelet coherence were performed.

Findings

The findings are mixed as not all tests show the exact effects of BTC in the three asset classes. However, common to all the tests is the significant influence that BTC maintains on gold and vice versa. The positive shock in BTC significantly increases the gold prices, confirmed in three different tests. The effects on the VIX and USDX are still being determined, where in some tests, it appears to be influential while in others not.

Originality/value

BTC’s diversification potential with equity stocks and USDX makes it a valuable security for portfolio managers. Furthermore, regulatory authorities should consider that BTC is not an isolated phenomenon and can significantly influence other asset classes such as gold.

Details

Studies in Economics and Finance, vol. 41 no. 1
Type: Research Article
ISSN: 1086-7376

Keywords

Open Access
Article
Publication date: 5 August 2022

Christopher Amoah and Demetri Steyn

Complying with the code of conduct by professionals in the construction industry worldwide has become a significant issue over the years. This has led to projects' failure…

7805

Abstract

Purpose

Complying with the code of conduct by professionals in the construction industry worldwide has become a significant issue over the years. This has led to projects' failure, leading to losses to both the client and contractors. The study's objective is to identify the challenges of construction professionals in complying with their code of conduct and preventing corrupt practices.

Design/methodology/approach

Quantitative approach was used to collect empirical data by sending questionnaires to 56 construction professionals in South Africa. Data gathered were analysed through Excel statistical tool. Mean values were calculated for the quantitative data, whilst thematic content analyses were used to generate frequencies and percentages for qualitative data.

Findings

The findings indicate that construction professionals experience many unethical issues in their work duties such as inflated tender prices, overpricing the rates, tender-based kickbacks, bribes for projects, unethical methods of project execution, use of lower grade materials than specified, discrimination, among others. However, issues such as greediness, acceptance of corruption as usual practice, lack of knowledge about the code of conduct, the only way to get contracts, part of the process, and peer pressure create a challenge in complying with the code of conduct and preventing corrupt practices among construction professionals.

Practical implications

Construction professionals face many unethical and corrupt practices in their project management and execution, which they cannot overcome due to many factors. Therefore, there is the need to sensitise the professionals in the construction industry regarding their code of conduct as well as the danger associated with engaging in corrupt practices in their work and their implication on project performance.

Originality/value

The findings give an insight into the critical factors curtailing the construction professional's ability to comply with their code of conduct and be corrupt-free in their line of duty. Thus, professional associations can use the findings in guiding their members.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 22 January 2024

Heba Al Kailani, Ghaleb J. Sweis, Farouq Sammour, Wasan Omar Maaitah, Rateb J. Sweis and Mohammad Alkailani

The process of predicting construction costs and forecasting price fluctuations is a significant and challenging undertaking for project managers. This study aims to develop a…

Abstract

Purpose

The process of predicting construction costs and forecasting price fluctuations is a significant and challenging undertaking for project managers. This study aims to develop a construction cost index (CCI) for Jordan’s construction industry using fuzzy analytic hierarchy process (FAHP) and predict future CCI values using traditional and machine learning (ML) techniques.

Design/methodology/approach

The most influential cost items were selected by conducting a literature review and confirmatory expert interviews. The cost items’ weights were calculated using FAHP to develop the CCI formula.

Findings

The results showed that the random forest model had the lowest mean absolute percentage error (MAPE) of 1.09%, followed by Extreme Gradient Boosting and K-nearest neighbours with MAPEs of 1.41% and 1.46%, respectively.

Originality/value

The novelty of this study lies within the use of FAHP to address the ambiguity of the impact of various cost items on CCI. The developed CCI equation and ML models are expected to significantly benefit construction managers, investors and policymakers in making informed decisions by enhancing their understanding of cost trends in the construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 23 August 2022

Yixi Zhang, Bee Lan Oo and Benson Teck-Heng Lim

Contractors of different scales, operating in different construction industries of varying institutional and economic settings, have different considerations when making bid or…

Abstract

Purpose

Contractors of different scales, operating in different construction industries of varying institutional and economic settings, have different considerations when making bid or no-bid and mark-up decisions. Focusing on the large and medium-sized contractors in the Jilin province, China, the purpose of this study is to examine important factors affecting their decision to bid (d2b) and mark-up decisions and investigate differences between large and medium-sized contractors in evaluating the importance of the various factors affecting their d2b and mark-up decisions.

Design/methodology/approach

This study used a survey design for timely data collection from a large population. Contractors’ bidding attitudes was collected using an online survey questionnaire with a list of 40 key factors. Statistical analytical methods were applied for comparing the two groups of contractors.

Findings

The results of this study indicate that factors related to client conditions are most critical for both large and medium-sized contractors in their d2b and mark-up decisions. The results also show statistically significant differences between the two groups of contractors on a subset of factors affecting their d2b and mark-up decisions. The large contractors have placed more emphasis on projects' potential financial and strategic benefits. Another notable finding is that both groups of contractors have placed great emphasise on “government legislations” in their d2b and mark-up decisions.

Research limitations/implications

These findings should be interpreted in consideration of several limitations. Firstly, the sample size is relatively small, and the focus was on a single province in the China construction industry. Next, this study only explores differences between large and medium-sized contractors in evaluating the importance of the various factors affecting their d2b and mark-up decisions.

Practical implications

Contractors could refer list of critical factors in competing for jobs in Jilin province or other provinces of similar institutional and economic settings. Construction clients, on the other hand, should consider the list of critical factors in the formulation of their competitive tendering procedures, thus enhancing the efficiency in their procurement of construction services.

Originality/value

Research on contractors’ bidding decision-making in the context of Chinese construction industry remains scarce; the research findings have implications for the industry stakeholders.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 15 December 2022

Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…

Abstract

Purpose

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.

Design/methodology/approach

Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.

Findings

The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.

Originality/value

The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 August 2022

Masresha Belete Asnakew and Minale Kassahun Amogne

The accessibility of housing for many purposes is more influenced by the functioning of housing market. As access to housing is an expensive and long-term exertion of household…

Abstract

Purpose

The accessibility of housing for many purposes is more influenced by the functioning of housing market. As access to housing is an expensive and long-term exertion of household, looking for appropriate housing fund is necessary whether the source of fund is private saving or mortgage. However, insufficient finance in Ethiopia is a reason for inaccessible of land and housing by the low- and middle-income people. This study aims to identify the barriers to access finance in the study area.

Design/methodology/approach

This study adopted a qualitative and quantitative research approach to investigate the barriers of housing finance. To undertake and increase the relevance of this study, primary and secondary, qualitative and quantitative data were used. Primary data were collected from respondents; focal person’s and key informants. Both descriptive statistical analysis and relative importance index analysis was deployed for this study. In addition, the quantitative data were analyzed using logistic regresion model.

Findings

The result of this study found that in Ethiopia at all, there is no enough mortgage and long-term lending banks. The result of this study inspects some variables significantly affect the access to finance. The result of this study will help the government in buildup of financial institutions in many perspectives. Financial institutions and clients may also be beneficiary through stiffen housing finance system.

Originality/value

The barriers of access to finance were not sufficiently studied in Ethiopia. Therefore, this study may be a pioneer for the researchers, as it did not cover the whole area of the country to study and also appoint the government to reform the financial sector based on the findings of the researches.

Details

International Journal of Housing Markets and Analysis, vol. 16 no. 6
Type: Research Article
ISSN: 1753-8270

Keywords

Article
Publication date: 12 July 2023

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David J. Edwards and Eric Asamoah

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide…

Abstract

Purpose

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana.

Design/methodology/approach

A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model.

Findings

The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%.

Originality/value

To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 7 November 2023

Elke Ielegems and Jan Vanrie

A challenge in implementing Universal Design (UD) is the perceived additional cost, which acts as a barrier to its widespread adoption. The few studies that have examined the cost…

Abstract

Purpose

A challenge in implementing Universal Design (UD) is the perceived additional cost, which acts as a barrier to its widespread adoption. The few studies that have examined the cost for UD apply a theoretical research approach, failing to account for the unique design context that influences construction costs. This article presents a research methodology to calculate the UD cost in a realistic, context-dependent manner.

Design/methodology/approach

To address this gap, “Research-by-Design” is applied in a case study approach involving twelve cases from three typologies: secondary schools, town halls and small retail shops. Two scenarios are compared to the existing situation: (1) “renovating into a 100% inclusive building” and (2) “building fully inclusive right away”.

Findings

Although the methodology is time-consuming, it allows for a fair, realistic and detailed comparison between costs in different scenarios and cases. Findings show how financial implications are strongly related to its scale. Both “renovation” and “new build” scenarios involve costs, but these are considerably lower for the latter. “Circulation” and “Exterior stairs and ramps” are among the most expensive to renovate, but have almost no additional cost in the examined cases for the “new build scenario”.

Research limitations/implications

The research methodology presented in this study is time-consuming, which may limit its feasibility for large-scale cost assessments in diverse contexts.

Practical implications

The research methodology proposed in this study provides valuable insights for architects, designers and stakeholders involved in the implementation of UD. It offers a realistic and context-dependent approach to assess the cost implications of UD, enabling informed decision-making during the design and construction phases.

Social implications

By revealing the specific cost implications of UD in different building contexts, this study contributes to promoting greater accessibility and inclusion in the built environment.

Originality/value

The applied approach distinguishes this study for its ability to provide rich contextual information on actual cost implications for UD. By considering real cases and their unique design contexts, valuable insights are offered into the true costs of implementing UD in the built environment.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

1 – 10 of 153