Search results

1 – 10 of 151
Article
Publication date: 29 September 2023

Li Wang, Yanhong Lv, Tao Wang, Shuting Wan and Yanling Ye

The purpose of this research is to address the existing gap in the study of construction and demolition waste (C&DW) by focusing on its impact on human health throughout the…

Abstract

Purpose

The purpose of this research is to address the existing gap in the study of construction and demolition waste (C&DW) by focusing on its impact on human health throughout the entire life cycle. And this research provides a comprehensive assessment model that incorporates the release of gaseous pollutants and particulate matter during the whole life cycle of C&DW, thereby contributing to a more holistic understanding of its impact on human health.

Design/methodology/approach

The research was conducted in two stages. Firstly, the quantitative model framework of pollutants emitted by C&DW was established. Three types of pollutants were considered, namely nitrogen dioxide (NO2), sulfur dioxide (SO2) and inhalable particulate matter (PM10). Second, disability-adjusted life year (DALY) and willingness to pay (WTP) assessments were used to provide a monetary quantified health impact for pollutants released by C&DW.

Findings

The results show that the WTP value of PM10 is the highest among all pollutants and 8.68E+07 dollars/a, while the WTP value in the disposal stage accounts for the largest proportion compared to the generation and transportation stage. These findings emphasize the importance of PM10 and C&DW treatment stage for pollutant treatment.

Originality/value

The results of this study are of great significance for the management department to optimize the construction management scheme to reduce the total amount of pollutants produced by C&DW and its harm to human health. Meanwhile, this study fills the gap in existing research on the impact assessment of C&DW on human health throughout the whole life cycle, and provides reference and basis for future research and policy formulation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 6 September 2023

Noushra Shamreen Amode, Prakash N. K. Deenapanray and Pratima Jeetah

The chapter aims to evaluate the efficacy of stakeholder participation in the solid waste management system of Mauritius in view of providing a possible mechanism to attain the…

Abstract

Purpose

The chapter aims to evaluate the efficacy of stakeholder participation in the solid waste management system of Mauritius in view of providing a possible mechanism to attain the goals of a sustainable waste management framework.

Methodology

The study employs qualitative indicators, namely, User Inclusivity and Producer Inclusivity of the Wasteaware Benchmark Indicators. Secondary data are used to conduct a critical and comprehensive analysis of the sub-indicators falling under each of the two main indicators to determine the overall compliance level with respect to stakeholder engagement of the waste management sector of Mauritius.

Findings

The results of the study show a LOW/MEDIUM compliance level for both User Inclusivity and Provider Inclusivity indicators, which indicates that improvement is required in the stakeholder engagement mechanism in Mauritius. The main weaknesses identified comprise of lack of an adequate legal framework with clear definition of waste types with regards to segregation, especially for non-hazardous wastes, low efficiency of sustainable waste management awareness campaigns and lack of inclusion of the informal sector. The main strengths identified consist of a proper bidding mechanism in place and a good level of equity in the provision of waste management services with respect to comingled waste collection. Suggested improvement areas include a revamping of the existing legal framework related to waste management to cater for higher inclusivity of all stakeholders together with including sustainable waste management topics in the formal education curriculum.

Originality

The User Inclusivity and Producer Inclusivity indicators were previously applied only to cities to measure the level of stakeholder participation, but this study has demonstrated that these indicators can also be adopted on a nation-wide level to evaluate stakeholder engagement. The use of these indicators together with secondary data presents a less time-consuming method to assess stakeholder participation in the waste sector, which can be particularly useful for Small Island Developing States.

Article
Publication date: 12 September 2023

Alya Ateeq Alremeithi, Zainab Riaz and Mehmood Khan

This paper aims to investigate recycling behavior (RB) in the United Arab Emirates (UAE) to identify factors in the lack of citizen participation in recycling and to form…

Abstract

Purpose

This paper aims to investigate recycling behavior (RB) in the United Arab Emirates (UAE) to identify factors in the lack of citizen participation in recycling and to form strategies to raise awareness of and encourage positive recycling practices.

Design/methodology/approach

Based on stakeholder theory, a panel of 15 experts and 15 families was interviewed to develop a model of seven constructs and their 29 indicators. Based on the responses generated, a questionnaire was developed and tested. The survey was distributed to 106 waste management professionals. Their responses regarding the influence of regulatory promotion tactics, awareness raising, situational facilitators, motivators and synergistic habits on citizens' RB were analyzed using the structural equation modeling technique.

Findings

Several factors govern the citizens' behavior regarding recycling municipal solid waste in the UAE. The most significant governing determinants of RB observed were laws and regulations, willingness to sort and recycle and benefits of recycling. Seven constructs and their 29 indicators were studied, and the findings indicated that strategies such as creating awareness, introducing operative waste control facilities and implementing fines and regulations could improve RB in the UAE. The structural model showcased a relationship between the primary constructs and RB; hence, these constructs can directly affect waste management.

Originality/value

To support these findings, validation of the results from other countries and contrasting employees' RB is needed. The present study draws empirical insights into RB from a stakeholder perspective, which could be compared to RB across other cultures and countries.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 1 March 2022

Muhammad Usman Shahid, Muhammad Jamaluddin Thaheem and Husnain Arshad

The construction industry struggles in environmental and economic performance due to waste generation. Several studies have measured this waste in the construction industry of…

Abstract

Purpose

The construction industry struggles in environmental and economic performance due to waste generation. Several studies have measured this waste in the construction industry of developing countries like India, Brazil, China, Nigeria and Iran, and proposed strategies to enhance the overall efficiency. But no such work exists in Pakistan's context. The construction industry of Pakistan contributes significantly to the country's gross domestic product (GDP). And with several mega projects in progress to overcome the energy crises and improve the infrastructure of the country, the absence of proper waste management policies and plans calls for empirical research. Therefore, this study quantifies and benchmarks material waste in the local context, its impact on project cost and the effect of multiple subcontracting arrangements on waste generation. It also proposes a conceptual waste management plan (WMP) for local conditions which can be generalized for developing countries.

Design/methodology/approach

This paper uses a mixed research approach by leveraging Saunders's research onion model. To benchmark the current wastage practices, quantitative data of material waste in the Pakistani construction industry are gathered through document review of accounting systems, inventory and payment records of 40 completed building projects. Using the data, the waste rate of different materials is measured along with their impact on cost. Additionally, the role of subcontracting arrangements in waste generation is also investigated. Also, semi-structured interviews are conducted with project managers of high- and low-performing construction organizations to propose a conceptual WMP for the local industry and developing countries.

Findings

The highest wasteful materials by quantity are wood, sand and concrete blocks, and those by cost are wood, bricks and steel. By quantity, 123% more material was used on average than the actual productive work. Also, the labor only (L-O) subcontracting arrangement causes maximum waste. Moreover, the difference between the highest (155%) and lowest wasting company (104%) is 51%, highlighting the proactive and resistive waste management culture and approach by the worst- and best-performing companies. Further, the impact of waste quantities is more than 2% of the project cost. Finally, a conceptual model consisting of measures at the project, industry and national levels is also proposed as a guide for developing countries.

Practical implications

The findings of this benchmarking study can help improve the project planning, execution and monitoring, and control practices by providing a better understanding of the material waste potential. This will help economize the construction industry and improve its sustainability.

Originality/value

This is the first benchmarking study that quantitatively measures material waste in the construction industry of Pakistan. It highlights that costly as well as sustainability-implicating materials are frequently wasted in the local construction projects. Also, this study correlates the wastage with subcontracting arrangements. Additionally, an original conceptual WMP is proposed that could help the industry improve its performance. The findings could help the construction professionals identify the loopholes in their material management practices and not only save money but also ensure better sustainability.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 September 2022

Zul-Atfi Bin Ismail

The improper evaluation and information management of circular economy (CE) (i.e. design, planning, supply chain, waste pile and material hazard) is critical for public health and…

Abstract

Purpose

The improper evaluation and information management of circular economy (CE) (i.e. design, planning, supply chain, waste pile and material hazard) is critical for public health and is a major problem in the waste management of precast concrete (PC) building manufacture and construction and demolition wastes industry. The CE model is particularly problematic for PC building construction projects where the standard practices for the total number of waste building materials are not appropriate and do not match the safe disposal design specification, such as the recent number increase in the Malaysian illegal construction waste pile during the Movement Control Order (11 March 2021, about 5 out of 29 landfills related to states enforcing Act 672). The study aims to develop a framework application (i.e. Building Information Modelling [BIM]) that supports intelligent waste recycling management and sophisticated CE model system solutions.

Design/methodology/approach

Thus, the development of a new BIM-based programming algorithm approach is proposed for optimising CE in accordance with the needs of the current PC building construction schemes. As a precursor to this study, the concepts of CE practices are reviewed and the main features of BIM tools and techniques currently being employed on such projects are presented.

Findings

Sophisticated CE system solutions are described as an essential component of this optimisation to reduce the amount of waste generated at the end of the life cycle of PC building construction projects and to better manage the resources used throughout it.

Originality/value

Finally, the potential for a research framework for developing such a system in the future is presented.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 March 2024

Zhikun Ding, Wanqi Nie, Vivian W.Y. Tam and Chethana Illankoon

The preferences and adoption of recycled materials by consumers are subject to a variety of factors, such as enablers and barriers. Despite this, there exists a paucity of…

Abstract

Purpose

The preferences and adoption of recycled materials by consumers are subject to a variety of factors, such as enablers and barriers. Despite this, there exists a paucity of research concerning stakeholders' perceived value and real purchase decision towards recycled products. Consequently, this research study aims to fill this gap by investigating stakeholders' perceived value of recycled products derived from construction and demolition (C&D) waste and its effect on purchase decisions.

Design/methodology/approach

Research data were collected from 219 valid questionnaires completed by Chinese stakeholders. Structural equation modeling (SEM) was then employed to test eight hypotheses.

Findings

The results show intrinsic cue (materials) and extrinsic cue (brand) influence the stakeholders’ judgment on C&D waste recycled products’ value and then their purchase intention. However, cues such as quality, word-of-mouth, price, policy and advertised have not play a significant role in practice.

Originality/value

This research study verified the significance of brand and material cues on decision making for purchasing C&D waste recycled products, providing new insights to policy making to enhance the uptake of C&D waste recycled products in construction industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 August 2023

Peng Nie, Kalani C. Dahanayake and Nipuni Sumanarathna

This paper aims to explore UAE's transition towards circular economy (CE) through construction and demolition waste (CDW) management in the pre-construction stage. The extent of…

Abstract

Purpose

This paper aims to explore UAE's transition towards circular economy (CE) through construction and demolition waste (CDW) management in the pre-construction stage. The extent of circularity is assessed by five key aspects of CE, such as policies and strategic frameworks, design for waste prevention, design for disassembly or deconstruction, use of prefabricated elements and CDW management plans.

Design/methodology/approach

Multiple case studies were conducted in the context of the Dubai construction industry (UAE). Three significant and unique construction projects were selected as the cases. Semi-structured interviews were carried out to collect data, and the thematic analysis technique and NVIVO 12 software were used for data analysis.

Findings

Findings reveal several positive initiatives towards CE in the UAE context; yet it is identified that the transition is still at the initial stage. Selected case studies, the best-case scenarios of UAE (i.e. influential cases), demonstrated adequate measures in relation to four key CE aspects out of five. For instance, (a) policies and strategic frameworks such as lean standards, green building standards and standards developed by the local authorities, (b) design for waste prevention (e.g. adherence to the 3R principle, and construction planning with BIM), (c) use of prefabricated elements and application of innovative construction technologies (e.g. 3DPC, DfMA) and (d) CDW management planning such as 3R principle were evident. However, the selected cases hardly showcase designing for disassembly or deconstruction.

Research limitations/implications

The existing CDW practices are mostly conventional, as most constructions in UAE are procured through conventional building materials and methods. Therefore, there is a necessity of encouraging CE principles in CDW management. Even though the transition towards CE was evident in four key CE aspects out of five, the UAE construction industry has yet to adopt more effective CE-based CDW management practices to accelerate the circularity. Hence, it is necessary to enforce standard waste management guidelines, including the 3R principle, to standardise CDW management in UAE and encourage construction practitioners to adhere to CE principles.

Originality/value

The findings of this study provide valuable insights for decision-making processes around CDW management towards a CE. This paper contributes to the literature by bridging the CE concept with CDW management in the pre-construction stage. The study provides insights for industry practitioners for planning CE in terms of policies and strategic frameworks, CDW management planning, construction planning and application of innovative construction technologies.

Details

Smart and Sustainable Built Environment, vol. 13 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 8 April 2024

Hasith Chathuranga Victar and Anuradha Samarajeewa Waidyasekara

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address…

Abstract

Purpose

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address these issues, this study explores the application of Circular Economy (CE) strategies in minimising waste generation and optimising resource utilisation in Sri Lankan construction industry. The research focuses on the construction and building renovation and use and operate stages of the building project life cycle, recognising their significance in waste generation and resource consumption.

Design/methodology/approach

The research employed a qualitative approach, utilising the Delphi technique through three rounds of expert interviews. Seventeen experts were involved in the first round, followed by fifteen in the second round, and twelve in the final round. The collected data was analysed using manual content analysis methods.

Findings

The research findings revealed fifteen C&D WM issues in the construction and building renovation stage in Sri Lanka, along with suitable strategies to overcome each of them. Similarly, eight C&D WM issues were identified for the use and operate stage of the building, and corresponding strategies were provided to address each issue. By adopting CE strategies such as modular design and material reuse, construction projects can optimise the project's timeline, cost, and quality factors. These strategies enable efficient resource allocation, reduce waste generation, and contribute to the overall sustainability of the project. The impact of CE strategies on mitigating these issues within the project management iron triangle was also discussed.

Originality/value

This paper entails delving into how construction, building renovation, and operation stages of a building's life cycle intersect with CE strategies, which profoundly influence operational efficiency and long-term sustainability. By incorporating principles such as energy efficiency, water conservation, and circular product design, the paper illuminates how these strategies facilitate decreased energy usage, enhanced resource management, and diminished waste production throughout the building's lifespan.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 July 2023

Santonab Chakraborty, Rakesh D. Raut, T.M. Rofin and Shankar Chakraborty

Increasing public consciousness and demand for sustainable environment make selection of a safe location for effective disposal of healthcare waste (HCW) a challenging issue. This…

Abstract

Purpose

Increasing public consciousness and demand for sustainable environment make selection of a safe location for effective disposal of healthcare waste (HCW) a challenging issue. This problem becomes more complicated due to involvement of multiple decision makers having varying knowledge and interest, conflicting quantitative and qualitative evaluation criteria, and presence of several alternative locations.

Design/methodology/approach

To efficiently resolve the problem, the past researchers have already coupled different multi-criteria decision-making tools with uncertainty models and criteria weight measurement techniques, which are time-consuming and highly computationally complex. Based on involvement of a group of experts expressing their opinions with respect to relative importance of criteria and performance of alternative locations against each criterion, this paper proposes application of ordinal priority approach (OPA) integrated with grey numbers to solve an HCW disposal location selection problem.

Findings

The grey OPA can simultaneously estimate weights of the experts, criteria and locations relieving the decision makers from complicated computational steps. The potentiality of grey OPA in solving an HCW disposal location selection problem is demonstrated here using an illustrative example consisting of three experts, six criteria and four alternative locations.

Originality/value

The derived results show that it can be employed to deal with real-time HCW disposal location selection problems in uncertain environment providing acceptable and robust decisions. It relieves the experts from pair-wise comparisons of criteria, normalization of data, identification of ideal and anti-ideal solutions, aggregation of information and so on, while arriving at the most consistent decision with minimum computational effort.

Details

Grey Systems: Theory and Application, vol. 13 no. 4
Type: Research Article
ISSN: 2043-9377

Keywords

Article
Publication date: 17 May 2022

Ruchini Senarath Jayasinghe, Raufdeen Rameezdeen and Nicholas Chileshe

The reverse logistics supply chain (RLSC) for demolition waste management (DWM) is a complex process that inherits significant interdependent risks. However, studies on the RLSC…

Abstract

Purpose

The reverse logistics supply chain (RLSC) for demolition waste management (DWM) is a complex process that inherits significant interdependent risks. However, studies on the RLSC have not explicitly identified the risks of its inter-relationships by disentangling their effects on operational performance. Accordingly, this paper aims to identify and assess the inter-dependencies of the risks in the RLSC to improve quality-related operational performance.

Design/methodology/approach

A sequential exploratory mixed-method research approach, consisting of qualitative and quantitative methods, was employed. The qualitative approach involved 25 semi-structured interviews, whereas the 18 subsequent structured interviews were conducted with stakeholders in the entire RLSC as part of the quantitative method. These were used to identify the cause and effect relationships of the identified risks. The data were analysed using thematic analysis, and the Bayesian belief network (BBN) technique was used to develop a conceptual risk model.

Findings

In total 20 risks in four RLSC sub-processes, namely, dismantling and on-site process, off-site resource recovery process, marketing of secondary products and residue disposal, emerged. Among cause and effect relationships of identified risk factors, inferior quality of secondary products was found to have the strongest relationship with customer satisfaction. Under-pricing of dismantling job, improper landfill operations and inadequacy of landfill levy are independent risks that initiate other risks down the supply chain. The aggregate effects of these risks affect customer dissatisfaction of the end-product, as well as health and safety risks in on-site, off-site and residue disposal.

Research limitations/implications

This study only identify the cause and effect relationships of the identified risks within the RLSC for DWM operations. It has not targeted a specific construction material or any secondary production, which could be practiced through a case study in future research.

Practical implications

The results encourage the investigation of RLSC process quality by maintaining the relationship between recycler and customer to enable a safe workplace environment. Hence, the role of relevant practitioners and government is inseparable in supporting decision-making. Future research could discuss the impact of those inter-related risks in relation to time- or cost-related operational performance criteria.

Originality/value

This study contributes to the field through presenting the first major study on the identification and assessment of the inter-dependencies of the risks in the RLSC in South Australia. The RLSC process mapping had been identified as a tactical and operational management approach. However, the risk management process is a strategic management approach. Therefore, the integration of both process mapping and the risk management approaches in one platform is germane to construction management research.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 151