Search results

1 – 10 of over 1000
Book part
Publication date: 26 April 2024

César Augusto Ferrari Martinez

This chapter is dedicated to understanding the idea of international as a key notion to the development of globalisation and to promoting the rescaling of spaces and subjects in…

Abstract

This chapter is dedicated to understanding the idea of international as a key notion to the development of globalisation and to promoting the rescaling of spaces and subjects in contemporary higher education. The author discusses the concept of scale as a performative device that activates the capacities of bodies. Instead of seeing scale as a naturalised and hierarchical structure of spatial distribution, the author understands it as an ensemble of discourses and practices that produce scalar effects. Globalisation uses scale to promote the idea that subjects would become ‘international’ by being linked to privileged spaces and bodies in the Global North. In this sense, globalisation is not merely about nodes where certain flows converge. Rather, the author understands it as the political conditions that control and constrain the space for certain flows to occur and not others. Using assemblage analysis, the author presents and analyses three scenes taken from his ethnographic records that have as a guiding line the materialisation of the international. These scenes report the experience of being a Latin American doctoral student attending a congress in the United States, a tense situation experienced at a Chilean university academic event, and the unpretentious manifestation of an elaborate idea of internationality from a personal experience of a trip to India. The results point to three elaborations of the international: an optimistic view of a shared world, a geopolitical internationality and the production of a global corporeality.

Details

Critical Reflections on the Internationalisation of Higher Education in the Global South
Type: Book
ISBN: 978-1-80455-779-2

Keywords

Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects…

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 26 June 2023

Petter Haglund and Mats Janné

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service…

1184

Abstract

Purpose

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service provider (LSP). However, construction logistics is normally approached either as a strategic decision or as an operational issue and rarely as a tactical concern. The purpose of this study is to explore how to organize the logistics outsourcing decision at strategic, tactical and operational levels.

Design/methodology/approach

This study is performed as a single-case study within a construction corporation, containing (amongst others) a building contractor (BC) and a construction equipment rental company (CERC) offering logistics services.

Findings

The study shows that to procure construction logistics service successfully, BCs need logistics capabilities at strategic and tactical levels to maintain an alignment between the use of logistics services and operational characteristics. Simultaneously, CERC’s need to design their service offerings to correspond to the needs of the BC.

Research limitations/implications

This study builds on a single-case study of a Swedish construction corporation. Further research is needed to better understand current logistics outsourcing and development practices and how these can be improved to foster better logistics management at the project level.

Practical implications

BCs find suggestions of different logistics organization structures and suitable outsourcing arrangements. CERCs and LSPs can use the findings to understand their customers’ needs and adapt service offerings.

Originality/value

To the best of the authors’ knowledge, this study is one of the first studies of how two companies within a corporation can work together to develop construction logistics service offerings.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 September 2022

Anushree Karani Mehta, Heena Thanki, Rasananda Panda and Payal Trivedi

The study aims to explore and validate the revised psychological contract scale in this new normal era.

Abstract

Purpose

The study aims to explore and validate the revised psychological contract scale in this new normal era.

Design/methodology/approach

To serve the purpose, four studies were conducted. Study 1 was conducted for item generation through the extant literature review and phenomenological study. Study 2 highlighted the expert review. Study 3 explained the confirmatory factor analysis. At the end of study 3, the new psychological contract content had 14 items along with 15 traditional psychological contract content items. The nomological study validated the scale with the help of antecedent, i.e. supervisor's support, and outcomes, i.e. well-being and innovative behavior.

Findings

The revised psychological contract was bifurcated into two categories: new and traditional. Further, the revised psychological contract scale was having two dimensions: content and breach/fulfillment. The new content was the outcome of changes in perceived obligations due to pandemic. The nomological study found that supervisor support had a positive impact on the content of the psychological contract and fulfillment/breach of the psychological contract. Further, it was found that the new content of psychological contract was impacting more on well-being and innovative behavior than the traditional psychological contract.

Research limitations/implications

In the new normal era, the working style and patterns have changed. Thus, it was important to capture changes in perceived obligations and employees' perception regarding to which extent their organizations were able to meet these altered perceived obligations. The study has direct implications for the practitioners as the revised psychological contract scale enlisted the perceived obligations of the employee and the extent to which these obligations were fulfilled by the employer. The study is also helpful in developing new normal HR policies and practices in the organization.

Originality/value

The study is original as it creates a new scale to measure the content of psychological contract and fulfillment/breach of psychological contract during new normal.

Details

International Journal of Manpower, vol. 45 no. 2
Type: Research Article
ISSN: 0143-7720

Keywords

Open Access
Article
Publication date: 10 April 2023

An Thi Binh Duong, Tho Pham, Huy Truong Quang, Thinh Gia Hoang, Scott McDonald, Thu-Hang Hoang and Hai Thanh Pham

The present study is performed to identify the propagation mechanism of the ripple effect as well as examine the simultaneous impact of risks on supply chain (SC) performance.

2943

Abstract

Purpose

The present study is performed to identify the propagation mechanism of the ripple effect as well as examine the simultaneous impact of risks on supply chain (SC) performance.

Design/methodology/approach

A theoretical framework with many hypotheses regarding the relationships between SC risk types and performance is established. The data are collected from a large-scale survey supported by a project of the Japanese government to promote sustainable socioeconomic development for the Association of Southeast Asian Nations (ASEAN) region, with the participation of 207 firms. Structural equation modeling (SEM) is used to test the hypotheses of the theoretical framework.

Findings

It is indicated that human-made risk causes operational risk, while natural risk causes both supply risk and operational risk. Furthermore, the impacts of human-made risk and natural risk on performance are amplified through operational risk.

Research limitations/implications

This study is one of the first attempts that identifies the propagation mechanism of the ripple effect and examines the simultaneous impact of risks on performance in construction SCs.

Originality/value

Although many studies on risk management in construction SCs have been carried out, they mainly focus on risk identification or quantification of risk impact. It is observed that research on the ripple effect of disruptions has been very scarce.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 October 2023

Eduardo André Cândido Da Silva, Flávio Santino Bizarrias, Renato Penha, Luciano Ferreira da Silva and Cristiane Drebes Pedron

Despite the significant interest from researchers and practitioners, the literature on project value measurement from the perspective of the customer is non-existent. This study…

Abstract

Purpose

Despite the significant interest from researchers and practitioners, the literature on project value measurement from the perspective of the customer is non-existent. This study aims to address this gap by developing and validating a scale to measure project value through a customer lens called the customer perception of project value scale.

Design/methodology/approach

A list of items was initially generated based on 762 sample responses through a systematic review of the literature and with the participation of specialists. Exploratory and confirmatory factorial analyses and structural equation modelling were used to develop and validate the scale.

Findings

The authors formulated a four-dimension scale. The dimensions used to measure the second-order construct are customer centrality, process, delivery and cost-benefit. This was validated using a nomological structure.

Research limitations/implications

The non-consensual nature of what is value in projects restricts the results of this study to the context of a specific group of stakeholders only, that is, the consumers of the projects. The authors also see limitations in the absence of competing scales, which do not allow the comparison of the instrument with alternative measures.

Practical implications

This study allows project managers and other professionals to measure a project’s perceived value from the customer’s point of view and manage the improvement of this perception.

Originality/value

To the best of the authors’ knowledge, this is the first study to propose a scale to measure project value, which advances the literature on project management and value and contributes to academic knowledge and practice by measuring project value from the customer standpoint.

Details

European Business Review, vol. 36 no. 3
Type: Research Article
ISSN: 0955-534X

Keywords

Article
Publication date: 13 October 2022

Arka Ghosh, Jemal Abawajy and Morshed Chowdhury

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the…

Abstract

Purpose

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the effective utilisation of emergent digital technologies and a need for a managerial shift for its smooth adoption.

Design/methodology/approach

A total of 3,046 peer-reviewed journal review articles covering Internet of Things (IoT), blockchain, building information modelling (BIM) and digital technologies within the construction sector were reviewed using scientometric mapping and weighted mind-map analysis techniques.

Findings

Prominent research clusters identified were: practice-factor-strategy, system, sustainability, BIM and construction worker safety. Leading countries, authors, institutions and their collaborative networks were identified with the UK, the USA, China and Australia leading this field of research. A conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Originality/value

The study traces the origins of the initial application of Industry 4.0 concepts in the construction field and reviews available literature from 1983 to 2021. It raises awareness of the latest developments and potential landscape realignment of the construction industry through digital technologies conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 3 November 2021

Ayodeji Emmanuel Oke, Ahmed Farouk Kineber, Ibraheem Albukhari and Adeyemi James Dada

The purpose of this paper is to evaluate the barriers militating against the adoption of robotics in the construction industry.

Abstract

Purpose

The purpose of this paper is to evaluate the barriers militating against the adoption of robotics in the construction industry.

Design/methodology/approach

Robotics implementation barriers were obtained from the previous studies and then through questionnaire survey construction stakeholders in Nigeria evaluate these barriers. Consequently, these barriers were examined via the exploratory factor analysis (EFA) technique. Furthermore, a model of these barriers was implemented by means of a partial least square structural equation modeling (PLS-SEM).

Findings

The EFA results showed that these barriers could be categorized into two: cost and technology. Results obtained from the proposed model showed that platform tools were crucial tools for implementing cloud computing.

Originality/value

The novelty of this research work will be provided a solid foundation for critically assessing and appreciating the different barriers affecting the adoption of robotics.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 3
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 15 May 2023

Kai Hänninen, Jouni Juntunen and Harri Haapasalo

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive…

16157

Abstract

Purpose

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive performance and vital to the long-term success of any organisation and company.

Design/methodology/approach

Using finite mixture structural equation modelling (FMSEM), the authors have classified innovation logic into latent classes. The method analyses and recognises classes for companies that have similar logic in innovation activities based on the collected data.

Findings

Through FMSEM analysis, the authors have identified three latent classes that explain the innovation logic in the Finnish construction companies – LC1: the internal innovators; LC2: the non-innovation-oriented introverts; and LC3: the innovation-oriented extroverts. These three latent classes clearly capture the perceptions within the industry as well as the different characteristics and variables.

Research limitations/implications

The presented latent classes explain innovation logic but is limited to analysing Finnish companies. Also, the research is quantitative by nature and does not increase the understanding in the same manner as qualitative research might capture on more specific aspects.

Practical implications

This paper presents starting points for construction industry companies to intensify innovation activities. It may also indicate more fundamental changes for the structure of construction industry organisations, especially by enabling innovation friendly culture.

Originality/value

This study describes innovation logic in Finnish construction companies through three models (LC1–LC3) by using quantitative data analysed with the FMSEM method. The fundamental innovation challenges in the Finnish construction companies are clarified via the identified latent classes.

Open Access
Article
Publication date: 22 March 2024

Abdul Rauf, Daniel Efurosibina Attoye and Robert H. Crawford

Recently, there has been a shift toward the embodied energy assessment of buildings. However, the impact of material service life on the life-cycle embodied energy has received…

Abstract

Purpose

Recently, there has been a shift toward the embodied energy assessment of buildings. However, the impact of material service life on the life-cycle embodied energy has received little attention. We aimed to address this knowledge gap, particularly in the context of the UAE and investigated the embodied energy associated with the use of concrete and other materials commonly used in residential buildings in the hot desert climate of the UAE.

Design/methodology/approach

Using input–output based hybrid analysis, we quantified the life-cycle embodied energy of a villa in the UAE with over 50 years of building life using the average, minimum, and maximum material service life values. Mathematical calculations were performed using MS Excel, and a detailed bill of quantities with >170 building materials and components of the villa were used for investigation.

Findings

For the base case, the initial embodied energy was 57% (7390.5 GJ), whereas the recurrent embodied energy was 43% (5,690 GJ) of the life-cycle embodied energy based on average material service life values. The proportion of the recurrent embodied energy with minimum material service life values was increased to 68% of the life-cycle embodied energy, while it dropped to 15% with maximum material service life values.

Originality/value

The findings provide new data to guide building construction in the UAE and show that recurrent embodied energy contributes significantly to life-cycle energy demand. Further, the study of material service life variations provides deeper insights into future building material specifications and management considerations for building maintenance.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 1000