Search results

1 – 10 of 105
Article
Publication date: 14 December 2022

Bryan Pieterse, Kofi Agyekum, Patrick Manu, Saeed Reza Mohandes, Clara Cheung and Akilu Yunusa-Kaltungo

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto…

Abstract

Purpose

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto been paid to the critical skills required when undertaking these projects. More specifically, the body of relevant knowledge is deprived of a study focusing on maintenance projects within the energy sector. In view of this shortcoming, this research aims to examine the critical project management (PM) skills required to deliver major maintenance projects within the energy sector.

Design/methodology/approach

Based on a quantitative research strategy, this study addressed the knowledge gap through a cross-sectional survey of professionals involved in the delivery of major maintenance projects in the United Kingdom's (UK) energy sector. Data obtained were analyzed via descriptive (e.g. frequencies, mean and standard deviation [SD]) and inferential statistical analyses (One sample t-test and exploratory factor analysis (EFA)).

Findings

Out of the 45 PM skills identified in the literature and examined by the respondents, the results obtained from the One sample t-test (based on p (1-tailed) = 0.05) showed that 37 were considered to be at least “important,” accounting for 80.4% of all the skills identified. EFA revealed a clustering of the PM skills items into seven components: “skills related to work scheduling and coordination”; “communication, risk, safety and stakeholder management skills”; “quality assurance skills”; “people management skills”; “skills related to forecasting scope and duration of outage”; “implementation of processes and time management skills” and “technical/engineering skills and experience pertaining to the outage and local site knowledge.”

Originality/value

This study has identified and contributed to the limited state-of-the-art skills project managers must possess to manage major maintenance projects in the energy sector successfully. The findings would be useful to organizations within the energy sector in ensuring that the organizations have suitable personnel in place to deliver major maintenance projects on the organizations' assets.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 April 2024

Mahmoud Mawed

Amidst the complicated nature of the UAE’s facilities management (FM) industry, the need to recalibrate the existing performance measurement (PM) system measures and criteria has…

Abstract

Purpose

Amidst the complicated nature of the UAE’s facilities management (FM) industry, the need to recalibrate the existing performance measurement (PM) system measures and criteria has been resonating to ensure their ability to capture the FM industry trends and dynamics, thus enhancing organizational excellence. Therefore, this research aimed to propose a specific PM tool to the country’s FM industry to accurately assess performance and establish strategic enhancements.

Design/methodology/approach

The study reviewed literature on the available PM systems to gather the available measures, which were presented to a focus group of seven participants, who were purposively selected based on their expertise in FM and PM implementation in the UAE to adjust them and add ones relevant to the UAE’s FM industry.

Findings

The focus group conducted various changes, from retaining certain measures and criteria, renaming them to simplify or make them more representative of the industry, ranking them based on their importance to limit their numbers, to finally categorizing them as enablers or results. Consequently, the final proposed tool was composed of nine dimensions with 51 measures as performance enablers and three dimensions with 11 measures as performance results. Seven measures were added by the experts, who highlighted their increasing popularity in the UAE’s FM industry.

Originality/value

Through addressing the critical void in literature, this paper develops a specific PM tool aligning with the intricacy of the UAE’s FM industry, thus providing proactive contribution to the industry’s effective and sustainable growth.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 18 April 2024

Jibran Abbas and Ashish Khare

According to regulations, aircraft must be in an airworthy condition before they can be operated. To ensure airworthiness, they must be maintained by an approved component…

Abstract

Purpose

According to regulations, aircraft must be in an airworthy condition before they can be operated. To ensure airworthiness, they must be maintained by an approved component maintenance organisation. This study is aimed to identify potential errors that may arise during the final inspection and certification process of aircraft components, categorise them, determine their consequences and quantify the associated risks. Any removed aircraft components must be sent to an approved aircraft component maintenance organisation for further maintenance and issuance of European Union Aviation Safety Agency (EASA) Form 1. Thereafter, a final inspection and certification process must be conducted by certifying staff to receive an EASA Form 1. This process is crucial because any errors during this stage can result in the installation of unsafe components in an aircraft.

Design/methodology/approach

The Systematic Human Error Reduction and Prediction Approach (SHERPA) method was used to identify potential errors. This method involved a review of the procedures of three maintenance organisations, individual interviews with ten subject matter experts and a consensus group of 14 certifying staff from different maintenance organisations to achieve the desired results.

Findings

In this study, 39 potential errors were identified during the final inspection and certification process. Furthermore, analysis revealed that 48.7% of these issues were attributed to checking errors, making it the most common type of error observed.

Originality/value

This study pinpoints the potential errors in the final inspection and certification of aircraft components. It offers maintenance organisations a roadmap to assess procedures, implement preventive measures and reduce the likelihood of these errors.

Details

Aircraft Engineering and Aerospace Technology, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1748-8842

Keywords

Article
Publication date: 21 March 2024

Nanda Kumar Karippur, Pushpa Rani Balaramachandran and Elvin John

This paper aims at identifying the key factors influencing the adoption intention of data analytics for predictive maintenance (PdM) from the lens of the…

Abstract

Purpose

This paper aims at identifying the key factors influencing the adoption intention of data analytics for predictive maintenance (PdM) from the lens of the Technology–Organization–Environment (TOE) framework in the Singapore Process Industries context. The research model aids practitioners and researchers in developing a holistic maintenance strategy for large-scale asset-heavy process industries.

Design/methodology/approach

The TOE framework has been used in this study to consider a wide set of TOE factors and develop a research model with the support of literature. A survey is undertaken and the structural equation modelling (SEM) technique is adopted to test the hypotheses of the proposed model.

Findings

This research highlights the significant roles of digital infrastructure readiness, security and privacy, top management support, organizational competence, partnership with external consultants and government support in influencing adoption intention of data analytics for PdM. Perceived challenges related to organizational restructuring and process automation are not found significant in influencing the adoption intention.

Practical implications

This paper reports valuable insights on adoption intention of data analytics for PdM with relevant implications for the various stakeholders such as the leaders and senior managers of process manufacturing industry companies, government agencies, technology consultants and service providers.

Originality/value

This research uniquely validates the model for the adoption of data analytics for PdM in the process industries using the TOE framework. It reveals the significant technology, organizational and environmental factors influencing the adoption intention and highlights the relevant insights and implications for stakeholders.

Details

Journal of Manufacturing Technology Management, vol. 35 no. 3
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 6 May 2024

Janet Chang and Ajith Parlikad

Global building failures, such as the Grenfell Tower fire in London, UK, emphasised the need for trustworthy building handover information for safety. However, a notable gap…

Abstract

Purpose

Global building failures, such as the Grenfell Tower fire in London, UK, emphasised the need for trustworthy building handover information for safety. However, a notable gap remains in understanding how reliable handover information can ensure the safety of occupants. This study aims to investigate the use and essential quality of handover information to understand the effects of the quality of information on the management of commercial buildings.

Design/methodology/approach

Ninety-four participants from nine organisations who regularly use handover information to manage multiple commercial buildings participated in the semi-structured interviews. Qualitative thematic coding using interview transcripts was performed to identify the utilisation of handover information and its quality requirements.

Findings

This study reveals that as-built drawings and product information are predominately used to fulfil statutory obligations, comply with the organisation’s internal policies, evaluate asset valuation and make informed decisions about capital investment and operating expenses. The quality dimensions of “accuracy”, “timeliness”, and “completeness” are preferred in combination to achieve desired outcomes.

Research limitations/implications

This study focused on using handover information in the management of commercial buildings. However, its results can offer valuable perspectives for improving its application across various sectors in the built environment.

Practical implications

The findings affirm the need for quality handover information for safety, compliance and efficient management in commercial buildings.

Originality/value

This research significantly contributes to the current knowledge of handover information in the building sector. Given the study findings, building owners are equipped to define specific handover information requirements and quality requisites.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 15 November 2023

Magdalena Marczewska

Common availability of digital technologies encouraged companies in almost all industries to focus on exploring various ways of benefiting from their adoption and thus taking…

Abstract

Purpose

Common availability of digital technologies encouraged companies in almost all industries to focus on exploring various ways of benefiting from their adoption and thus taking steps toward their digital transformation. This paper aims to describe the digital transformation of small and medium enterprises (SMEs) as a challenging opportunity and identify ways in which companies from the food industry address it.

Design/methodology/approach

The paper presents empirical evidence based on a case study of the Polish freeze-drying market and companies operating on it. This study adopted a single case study research method to describe the digital transformation journey of SMEs. The sample constitutes a single sectoral case study with more than one unit of analysis – sixteen companies. The undertaken approach follows an embedded case study design and allows for an extensive and multidimensional analysis of rich empirical data.

Findings

The results of this analysis allowed to identify four significant trends describing human resources involvement in the digital transformation of freeze-drying companies in Poland (i.e. visionary top-down, cooperative task-oriented, persuasive bottom-up, chaotic), a detailed catalog of outcomes of digital transformation from the perspective of food industry companies grouped in seven categories and a list of main barriers to digital transformation.

Originality/value

This paper contributes to expanding knowledge on the practices of food industry companies in addressing challenges posed by the development of information technology and the dynamically changing environment after the COVID-19 pandemic. It contributes further to the discussion related to context-, industry- and country-specific barriers to digital transformation, identifying time-related constraints as an essential barrier to digital transformation.

Details

British Food Journal, vol. 126 no. 5
Type: Research Article
ISSN: 0007-070X

Keywords

Article
Publication date: 22 December 2022

Reihaneh Alsadat Tabaeeian, Behzad Hajrahimi and Atefeh Khoshfetrat

The purpose of this review paper was identifying barriers to the use of telemedicine systems in primary health-care individual level among professionals.

Abstract

Purpose

The purpose of this review paper was identifying barriers to the use of telemedicine systems in primary health-care individual level among professionals.

Design/methodology/approach

This study used Scopus and PubMed databases for scientific records identification. A systematic review of the literature structured by PRISMA guidelines was conducted on 37 included papers published between 2009 and 2019. A qualitative approach was used to synthesize insights into using telemedicine by primary care professionals.

Findings

Three barriers were identified and classified: system quality, data quality and service quality barriers. System complexity in terms of usability, system unreliability, security and privacy concerns, lack of integration and inflexibility of systems-in-use are related to system quality. Data quality barriers are data inaccuracy, data timeliness issues, data conciseness concerns and lack of data uniqueness. Finally, service reliability concerns, lack of technical support and lack of user training have been categorized as service quality barriers.

Originality/value

This review identified and mapped emerging themes of barriers to the use of telemedicine systems. This paper also through a new conceptualization of telemedicine use from perspectives of the primary care professionals contributes to informatics literature and system usage practices.

Details

Journal of Science and Technology Policy Management, vol. 15 no. 3
Type: Research Article
ISSN: 2053-4620

Keywords

Article
Publication date: 17 April 2024

Zul-Atfi Ismail

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance…

Abstract

Purpose

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.

Findings

This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.

Originality/value

The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.

Details

Facilities , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-2772

Keywords

Content available
Article
Publication date: 9 April 2024

Luong Hai Nguyen

This empirical study explores the profound impact of management functions on the productivity of yard cargo handling equipment within container terminals.

Abstract

Purpose

This empirical study explores the profound impact of management functions on the productivity of yard cargo handling equipment within container terminals.

Design/methodology/approach

By closely examining crucial management aspects such as planning, organizing, leading, and controlling, a comprehensive managerial behavior framework was developed through focus group studies (FGS) and focal interviews. These qualitative methods were complemented by the distribution of questionnaires to practitioners in Vietnam. To validate the concept of management functions and analyze their influence on effective management practices for equipment efficiency, a structural equation model (SEM) technique was employed using partial least-squares estimation (PLS).

Findings

The findings of this study demonstrate that planning (PL), organizing (OR), and controlling (CT) significantly contribute to the productivity of yard cargo handling equipment, while leading (LD) does not exhibit a direct positive impact.

Originality/value

Theoretically, this study contributes by providing clarity to the definition, purpose, and value of management functions in the field of cargo handling equipment management. Furthermore, these research findings offer valuable insights to terminal operators and managers, enabling them to optimize their management strategies and enhance productivity levels, ultimately resulting in improved operational outcomes.

Details

Maritime Business Review, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2397-3757

Keywords

Article
Publication date: 5 December 2023

Ayodeji Emmanuel Oke, John Aliu, Doyin Helen Agbaje, Paramjit Singh Jamir Singh, Kehinde Temitope Alade and Mohamad Shaharudin Samsurijan

Research on measures to strengthen the implementation of indoor environmental quality (IEQ) principles has been scarce in developing countries such as Nigeria. Hence, this study…

Abstract

Purpose

Research on measures to strengthen the implementation of indoor environmental quality (IEQ) principles has been scarce in developing countries such as Nigeria. Hence, this study sought to identify and assess the crucial measures for encouraging the adoption of IEQ principles in the Nigerian construction industry, specifically from the viewpoint of quantity surveyors.

Design/methodology/approach

To accomplish this objective, a quantitative research methodology was employed, utilizing a well-structured questionnaire distributed to quantity surveying (QS) firms in Nigeria. The collected data were examined using a range of statistical techniques such as frequencies, percentages, mean item scores (MISs), the Kruskal–Wallis test and exploratory factor analysis.

Findings

The top five ranked measures were as follows: offer financial incentives and tax breaks, develop educational materials and resources, establish clear and accessible reporting mechanisms, develop awards and recognition programs and provide advocacy and awareness campaigns. Factor analysis led to the categorization of the identified measures into four primary clusters: education and training, policy and regulation, incentivization and recognition and collaboration and networking. Consequently, these clusters were renamed the EPIC (Education and training, Policy and regulation, Incentivization and recognition and Collaboration and networking) framework, with each first letter representing a significant measure for fostering the adoption of IEQ principles.

Practical implications

Consequently, this study offers a robust foundation for understanding and implementing measures to enhance the adoption of IEQ principles within the Nigerian construction industry, ultimately benefiting stakeholders and improving the quality of built environments.

Originality/value

The EPIC framework designed in this study offers valuable insights for policymakers, construction industry professionals and other stakeholders interested in promoting IEQ principles, which can potentially lead to healthier, more comfortable and more sustainable built environments in Nigeria and beyond.

Details

Management of Environmental Quality: An International Journal, vol. 35 no. 4
Type: Research Article
ISSN: 1477-7835

Keywords

1 – 10 of 105