Search results

1 – 10 of over 46000
Article
Publication date: 26 August 2014

Yanting Ni, Yuchen Li, Jin Yao and Jingmin Li

In a complex semiconductor manufacturing system (SMS) environment, the implementation of dynamic production scheduling and dispatching strategies is critical for SMS distributed…

Abstract

Purpose

In a complex semiconductor manufacturing system (SMS) environment, the implementation of dynamic production scheduling and dispatching strategies is critical for SMS distributed collaborative manufacturing events to make quick and correct decisions. The purpose of this paper is to assist manufacturers in achieving the real time dispatching and obtaining integrated optimization for shop floor production scheduling.

Design/methodology/approach

In this paper, an integrated model is designed under assemble to order environment and a framework of a real time dispatching (IRTD) system for production scheduling control is presented accordingly. Both of the scheduling and ordering performances are integrated into the days of inventory based dispatching algorithm, which can deal with the multiple indicators of dynamic scheduling and ordering in this system to generate the “optimal” dispatching policies. Subsequently, the platform of IRTD system is realized with four modules function embedded.

Findings

The proposed IRTD system is designed to compare the previous constant work in process method in the experiment, which shows the better performance achievement of the IRTD system for shop floor production dynamic scheduling and order control. The presented framework and algorithm can facilitate real time dispatching information integration to obtain performance metrics in terms of reliability, availability, and maintainability.

Research limitations/implications

The presented system can be further developed to generic factory manufacturing with the presented logic and architecture proliferation.

Originality/value

The IRTD system can integrate the real time customer demand and work in process information, based on which manufacturers can make correct and timely decisions in solving dispatching strategies and ordering selection within an integrated information system.

Details

Journal of Manufacturing Technology Management, vol. 25 no. 7
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 9 October 2023

Mingyao Sun and Tianhua Zhang

A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing…

Abstract

Purpose

A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing process is always accompanied by order splitting and merging; besides, in each stage of the process, there are always multiple machine groups that have different production capabilities and capacities. This paper studies a multi-agent based scheduling architecture for the radio frequency identification (RFID)-enabled semiconductor back-end shopfloor, which integrates not only manufacturing resources but also human factors.

Design/methodology/approach

The architecture includes a task management (TM) agent, a staff instruction (SI) agent, a task scheduling (TS) agent, an information management center (IMC), machine group (MG) agent and a production monitoring (PM) agent. Then, based on the architecture, the authors developed a scheduling method consisting of capability & capacity planning and machine configuration modules in the TS agent.

Findings

The authors used greedy policy to assign each order to the appropriate machine groups based on the real-time utilization ration of each MG in the capability & capacity (C&C) planning module, and used a partial swarm optimization (PSO) algorithm to schedule each splitting job to the identified machine based on the C&C planning results. At last, we conducted a case study to demonstrate the proposed multi-agent based real-time production scheduling models and methods.

Originality/value

This paper proposes a multi-agent based real-time scheduling framework for semiconductor back-end industry. A C&C planning and a machine configuration algorithm are developed, respectively. The paper provides a feasible solution for semiconductor back-end manufacturing process to realize real-time scheduling.

Details

IIMBG Journal of Sustainable Business and Innovation, vol. 1 no. 1
Type: Research Article
ISSN: 2976-8500

Keywords

Article
Publication date: 10 October 2022

Teng Wang, Xiaofeng Hu and Yahui Zhang

Steam turbine final assembly is a dynamic process, in which various interference events occur frequently. Currently, data transmission relies on oral presentation, while…

Abstract

Purpose

Steam turbine final assembly is a dynamic process, in which various interference events occur frequently. Currently, data transmission relies on oral presentation, while scheduling depends on the manual experience of managers. This mode has low information transmission efficiency and is difficult to timely respond to emergencies. Besides, it is difficult to consider various factors when manually adjusting the plan, which reduces assembly efficiency. The purpose of this paper is to propose a knowledge-based real-time scheduling system under cyber-physical system (CPS) environment which can improve the assembly efficiency of steam turbines.

Design/methodology/approach

First, an Internet of Things based CPS framework is proposed to achieve real-time monitoring of turbine assembly and improve the efficiency of information transmission. Second, a knowledge-based real-time scheduling system consisting of three modules is designed to replace manual experience for steam turbine assembly scheduling.

Findings

Experiments show that the scheduling results of the knowledge-based scheduling system outperform heuristic algorithms based on priority rules. Compared with manual scheduling, the delay time is reduced by 43.9%.

Originality/value

A knowledge-based real-time scheduling system under CPS environment is proposed to improve the assembly efficiency of steam turbines. This paper provides a reference paradigm for the application of the knowledge-based system and CPS in the assembly control of labor-intensive engineering-to-order products.

Details

Assembly Automation, vol. 42 no. 5
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 7 March 2023

Preeti Godabole and Girish Bhole

The main purpose of the paper is timing analysis of mixed critical applications on the multicore system to identify an efficient task scheduling mechanism to achieve three main…

Abstract

Purpose

The main purpose of the paper is timing analysis of mixed critical applications on the multicore system to identify an efficient task scheduling mechanism to achieve three main objectives improving schedulability, achieving reliability and minimizing the number of cores used. The rise in transient faults in embedded systems due to the use of low-cost processors has led to the use of fault-tolerant scheduling and mapping techniques.

Design/methodology/approach

The paper opted for a simulation-based study. The simulation of mixed critical applications, like air traffic control systems and synthetic workloads, is carried out using a litmus-real time testbed on an Ubuntu machine. The heuristic algorithms for task allocation based on utilization factors and task criticalities are proposed for partitioned approaches with multiple objectives.

Findings

Both partitioned earliest deadline first (EDF) with the utilization-based heuristic and EDF-virtual deadline (VD) with a criticality-based heuristic for allocation works well, as it schedules the air traffic system with a 98% success ratio (SR) using only three processor cores with transient faults being handled by the active backup of the tasks. With synthetic task loads, the proposed criticality-based heuristic works well with EDF-VD, as the SR is 94%. The validation of the proposed heuristic is done with a global and partitioned approach of scheduling, considering active backups to make the system reliable. There is an improvement in SR by 11% as compared to the global approach and a 17% improvement in comparison with the partitioned fixed-priority approach with only three processor cores being used.

Research limitations/implications

The simulations of mixed critical tasks are carried out on a real-time kernel based on Linux and are generalizable in Linux-based environments.

Practical implications

The rise in transient faults in embedded systems due to the use of low-cost processors has led to the use of fault-tolerant scheduling and mapping techniques.

Originality/value

This paper fulfills an identified need to have multi-objective task scheduling in a mixed critical system. The timing analysis helps to identify performance risks and assess alternative architectures used to achieve reliability in terms of transient faults.

Details

International Journal of Pervasive Computing and Communications, vol. 20 no. 1
Type: Research Article
ISSN: 1742-7371

Keywords

Article
Publication date: 20 January 2020

Amer Fahmy, Tarek Hassan, Hesham Bassioni and Ronald McCaffer

Basic project control through traditional methods is not sufficient to manage the majority of real-time events in most construction projects. The purpose of this paper is to…

Abstract

Purpose

Basic project control through traditional methods is not sufficient to manage the majority of real-time events in most construction projects. The purpose of this paper is to propose a Dynamic Scheduling (DS) model that utilizes multi-objective optimization of cost, time, resources and cash flow, throughout project construction.

Design/methodology/approach

Upon reviewing the topic of DS, a worldwide internet survey with 364 respondents was conducted to define end-user requirements. The model was formulated and solution algorithms discussed. Verification was reported using predefined problem sets and a real-life case. Validation was performed via feedback from industry experts.

Findings

The need for multi-objective dynamic software optimization of construction schedules and the ability to choose among a set of optimal alternatives were highlighted. Model verification through well-known test cases and a real-life project case study showed that the model successfully achieved the required dynamic functionality whether under the small solved example or under the complex case study. The model was validated for practicality, optimization of various DS schedule quality gates, ease of use and software integration with contemporary project management practices.

Practical implications

Optimized real-time scheduling can provide better resources management including labor utilization and cost efficiency. Furthermore, DS contributes to optimum materials procurement, thus minimizing waste.

Social implications

Optimized real-time scheduling can provide better resources management including labor utilization and cost efficiency. Furthermore, DS contributes to optimum materials procurement, thus minimizing waste.

Originality/value

The paper illustrates the importance of DS in construction, identifies the user needs and overviews the development, verification and validation of a model that supports the generation of high-quality schedules beneficial to large-scale projects.

Details

Built Environment Project and Asset Management, vol. 10 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 8 May 2007

Margaret Naughton and Donal Heffernan

This paper aims to describe the development of a new software tool for the scheduling of real‐time control messages in a time‐triggered control network. The prime application area…

Abstract

Purpose

This paper aims to describe the development of a new software tool for the scheduling of real‐time control messages in a time‐triggered control network. The prime application area for such a solution is in real‐time robotic controllers and other similar machine control systems.

Design/methodology/approach

The design of a scheduling tool, called SMART‐Plan, is described. The tool is based on a “least slack time” scheduling policy. A prototype tool for the time‐triggered controller area network (TTCAN) is developed. The design is validated against Society of Automotive Engineers Benchmark and a formal verification of the message schedule is also proposed.

Findings

The research findings show that it is feasible to develop such a message scheduling tool and the performance of the tool is comparable with other research solutions, which have been applied in the past to simple periodic schedulers, as opposed to time‐triggered networks.

Research limitations/implications

Although the prototype solution assumes a TTCAN control network, the concept will also be feasible for other types of time‐triggered control networks. The availability of such a tool might encourage developers of robotic equipment to adopt the time‐triggered network approach for the architectural development of such control systems. To date, the problems associated with the message scheduling of such time‐triggered systems have been an inhibitor to such developments.

Originality/value

This is a new scheduling approach to the message scheduling of time‐triggerred control networks.

Details

Industrial Robot: An International Journal, vol. 34 no. 3
Type: Research Article
ISSN: 0143-991X

Keywords

Article
Publication date: 8 June 2010

Apurva Shah, Ketan Kotecha and Dipti Shah

In client/server distributed systems, the server is often the bottleneck. Improving the server performance is thus crucial for improving the overall performance of distributed…

Abstract

Purpose

In client/server distributed systems, the server is often the bottleneck. Improving the server performance is thus crucial for improving the overall performance of distributed information systems. Real‐time system is required to complete its work and deliver its services on a timely basis. The purpose of this paper is to propose a new scheduling algorithm for real‐time distributed system (client/server model) to achieve the above‐mentioned goal.

Design/methodology/approach

The ant colony optimization (ACO) algorithms are computational models inspired by the collective foraging behavior of ants. They provide inherent parallelism and robustness. Therefore, they are appropriate for scheduling of tasks in soft real‐time systems. During simulation, results are obtained with periodic tasks, measured in terms of success ratio and effective CPU utilization; and compared with results of earliest deadline first (EDF) algorithm in the same environment.

Findings

Analysis and experiments show that the proposed algorithm is equally efficient during underloaded conditions. The performance of EDF decreases as the load increases, but the proposed algorithm works well in overloaded conditions also. Because of this type of property, the proposed algorithm is more suitable for the situation when future workload of the system is unpredictable.

Originality/value

The application of ACO algorithms for scheduling of client/server real‐time distributed system, never found before in the literature. The new concept proposed in this paper will be of great significance to both theoretical and practical research in scheduling of distributed systems in the years to come.

Details

International Journal of Intelligent Computing and Cybernetics, vol. 3 no. 2
Type: Research Article
ISSN: 1756-378X

Keywords

Article
Publication date: 5 May 2015

Yanting Ni and Yi Wang

In a mixed flow production environment, interactions between production planning and scheduling are critical for mixed flow distributed manufacturing management. The purpose of…

Abstract

Purpose

In a mixed flow production environment, interactions between production planning and scheduling are critical for mixed flow distributed manufacturing management. The purpose of this paper is to assist manufacturers in achieving real-time ordering and obtaining integrated optimization of shop floor production planning and scheduling for mixed flow production systems.

Design/methodology/approach

A double decoupling postponement (DDP) approach is presented for production dispatch control, and an integrated model is designed under an assemble to order (ATO) environment. To generate “optimal” lots to fulfil real-time customer requests, constant work in progress (CONWIP) and days of inventory dispatching algorithms are embedded into the proposed DDP model, which can deal with real-time ordering and dynamic scheduling simultaneously. Subsequently, a case study is conducted, and experiments are carried out to verify the presented method.

Findings

The proposed DDP model is designed to upgrade a previous CONWIP method in the case study company, and the proposed model demonstrates better performance for the integration of production planning and scheduling in mixed flow manufacturing. As a result, the presented operation mechanism can reflect real-time ordering information to shop floor scheduling and obtain performance metrics in terms of reliability, availability and maintainability.

Research limitations/implications

The presented model can be further proliferated to generic factory manufacturing with the proposed logic and architecture.

Originality/value

The DDP model can integrate real-time customer orders and work in process information, upon which manufacturers can make correct decisions for dispatch strategies and order selection within an integrated system.

Details

Kybernetes, vol. 44 no. 5
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 1 December 1997

Jau Woie Chang, Yih Ping Luh and Shean Shyong Chiou

Integrates CAD/CAM, production control and process control in a case study involving manufacturing automation. The manufacturing firm is a distributed cellular system operating in…

1200

Abstract

Integrates CAD/CAM, production control and process control in a case study involving manufacturing automation. The manufacturing firm is a distributed cellular system operating in a produce‐to‐order environment. Combines a parametric CAD software with global variables and global relations to achieve a design automation. Results obtained from design automation are transmitted to update the design model and the associative manufacturing model. In addition, scheduling and control are also integrated in the system. Distinguishes three scheduling levels: static scheduling, rescheduling, and real‐time scheduling. For a distributed and effective reason, the distributed shifting bottleneck procedure (DSBP) is adopted as the static scheduler and rescheduler, and the LRPT (longest bottleneck processing time) despatching rule is adopted as the real time despatching rule. FInally, introduces the configuration of the system including the flexible manufacturing cell architecture and the input buffer device. Uses a PLC programming toll that follows the IEC 1131‐3 standard to implement cell controllers. The above implementation aims to easily and effectively execute the CIM system.

Details

Integrated Manufacturing Systems, vol. 8 no. 6
Type: Research Article
ISSN: 0957-6061

Keywords

Article
Publication date: 14 June 2024

Yaser Sadati-Keneti, Mohammad Vahid Sebt, Reza Tavakkoli-Moghaddam, Armand Baboli and Misagh Rahbari

Although the previous generations of the Industrial Revolution have brought many advantages to human life, scientists have been looking for a substantial breakthrough in creating…

Abstract

Purpose

Although the previous generations of the Industrial Revolution have brought many advantages to human life, scientists have been looking for a substantial breakthrough in creating technologies that can improve the quality of human life. Nowadays, we can make our factories smarter using new concepts and tools like real-time self-optimization. This study aims to take a step towards implementing key features of smart manufacturing including  preventive self-maintenance, self-scheduling and real-time decision-making.

Design/methodology/approach

A new bi-objective mathematical model based on Industry 4.0 to schedule received customer orders, which minimizes both the total earliness and tardiness of orders and the probability of machine failure in smart manufacturing, was presented. Moreover, four meta-heuristics, namely, the multi-objective Archimedes optimization algorithm (MOAOA), NSGA-III, multi-objective simulated annealing (MOSA) and hybrid multi-objective Archimedes optimization algorithm and non-dominated sorting genetic algorithm-III (HMOAOANSGA-III) were implemented to solve the problem. To compare the performance of meta-heuristics, some examples and metrics were presumed and solved by using the algorithms, and the performance and validation of meta-heuristics were analyzed.

Findings

The results of the procedure and a mathematical model based on Industry 4.0 policies showed that a machine performed the self-optimizing process of production scheduling and followed a preventive self-maintenance policy in real-time situations. The results of TOPSIS showed that the performances of the HMOAOANSGA-III were better in most problems. Moreover, the performance of the MOSA outweighed the performance of the MOAOA, NSGA-III and HMOAOANSGA-III if we only considered the computational times of algorithms. However, the convergence of solutions associated with the MOAOA and HMOAOANSGA-III was better than those of the NSGA-III and MOSA.

Originality/value

In this study, a scheduling model considering a kind of Industry 4.0 policy was defined, and a novel approach was presented, thereby performing the preventive self-maintenance and self-scheduling by every single machine. This new approach was introduced to integrate the order scheduling system using a real-time decision-making method. A new multi-objective meta-heuristic algorithm, namely, HMOAOANSGA-III, was proposed. Moreover, the crowding-distance-quality-based approach was presented to identify the best solution from the frontier, and in addition to improving the crowding-distance approach, the quality of the solutions was also considered.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

1 – 10 of over 46000