To read this content please select one of the options below:

Integrated application in CAD/CAM, scheduling and control

Jau Woie Chang (Research Assistant, Department of Mechanical Engineering, National Taiwan University, Taipei, Taiwan)
Yih Ping Luh (Associate Professor, Department of Mechanical Engineering, National Taiwan University, Taipei, Taiwan)
Shean Shyong Chiou (Research Assistant, Department of Mechanical Engineering, National Taiwan University, Taipei, Taiwan)

Integrated Manufacturing Systems

ISSN: 0957-6061

Article publication date: 1 December 1997

1198

Abstract

Integrates CAD/CAM, production control and process control in a case study involving manufacturing automation. The manufacturing firm is a distributed cellular system operating in a produce‐to‐order environment. Combines a parametric CAD software with global variables and global relations to achieve a design automation. Results obtained from design automation are transmitted to update the design model and the associative manufacturing model. In addition, scheduling and control are also integrated in the system. Distinguishes three scheduling levels: static scheduling, rescheduling, and real‐time scheduling. For a distributed and effective reason, the distributed shifting bottleneck procedure (DSBP) is adopted as the static scheduler and rescheduler, and the LRPT (longest bottleneck processing time) despatching rule is adopted as the real time despatching rule. FInally, introduces the configuration of the system including the flexible manufacturing cell architecture and the input buffer device. Uses a PLC programming toll that follows the IEC 1131‐3 standard to implement cell controllers. The above implementation aims to easily and effectively execute the CIM system.

Keywords

Citation

Woie Chang, J., Ping Luh, Y. and Shyong Chiou, S. (1997), "Integrated application in CAD/CAM, scheduling and control", Integrated Manufacturing Systems, Vol. 8 No. 6, pp. 378-387. https://doi.org/10.1108/09576069710188887

Publisher

:

MCB UP Ltd

Copyright © 1997, MCB UP Limited

Related articles