Search results
1 – 10 of over 5000Tom A.E. Aben, Wendy van der Valk, Jens K. Roehrich and Kostas Selviaridis
Inter-organisational governance is an important enabler for information processing, particularly in relationships undergoing digital transformation (DT) where partners depend on…
Abstract
Purpose
Inter-organisational governance is an important enabler for information processing, particularly in relationships undergoing digital transformation (DT) where partners depend on each other for information in decision-making. Based on information processing theory (IPT), the authors theoretically and empirically investigate how governance mechanisms address information asymmetry (uncertainty and equivocality) arising in capturing, sharing and interpreting information generated by digital technologies.
Design/methodology/approach
IPT is applied to four cases of public–private relationships in the Dutch infrastructure sector that aim to enhance the quantity and quality of information-based decision-making by implementing digital technologies. The investigated relationships are characterised by differing degrees and types of information uncertainty and equivocality. The authors build on rich data sets including archival data, observations, contract documents and interviews.
Findings
Addressing information uncertainty requires invoking contractual control and coordination. Contract clauses should be precise and incentive schemes functional in terms of information requirements. Information equivocality is best addressed by using relational governance. Identifying information requirements and reducing information uncertainty are a prerequisite for the transformation activities that organisations perform to reduce information equivocality.
Practical implications
The study offers insights into the roles of both governance mechanisms in managing information asymmetry in public–private relationships. The study uncovers key activities for gathering, sharing and transforming information when using digital technologies.
Originality/value
This study draws on IPT to study public–private relationships undergoing DT. The study links contractual control and coordination as well as relational governance mechanisms to information-processing activities that organisations deploy to reduce information uncertainty and equivocality.
Details
Keywords
Jad EL Bizri, Elina Karttunen and Katrina Lintukangas
This study aims to build on social capital theory (SCT) and its dimensions by examining the role of social capital in the public procurement process and by identifying related…
Abstract
Purpose
This study aims to build on social capital theory (SCT) and its dimensions by examining the role of social capital in the public procurement process and by identifying related contingencies that may influence procurement performance.
Design/methodology/approach
A systematic literature review and a thematic analysis regarding social capital in procurement are conducted. The antecedent–behaviour–consequence (ABC) model is used for illuminating linkages between social capital, contingencies and procurement performance.
Findings
The dimensions of social capital are investigated in the procurement process; however, the extent of social capital role can vary between the phases of the process. It is concluded that the contingencies of social dynamics are linked with social capital and may influence the outcomes and performance of the procurement process.
Practical implications
Social capital can ease interactions between public buyers and private suppliers by contributing to effective tendering, improving social interaction in negotiations and balancing rigidity in contract management, supporting the interests of both parties. The provided framework helps decision makers to comprehend the social dynamics in public procurement.
Social implications
Improving social dynamics and solutions in public procurement.
Originality/value
This study extends social capital research in the field of public procurement and creates a framework connecting social capital and prevailing contingency factors to procurement process performance.
Details
Keywords
Silvia Sacchetti and Alberto Ianes
This study aims to address the question of what coordination mechanism can be used for cultural production and, in particular, for the governance of music culture production. The…
Abstract
Purpose
This study aims to address the question of what coordination mechanism can be used for cultural production and, in particular, for the governance of music culture production. The authors locate their reflection within the specific institutional innovations introduced in Italy in 2017, focusing on the idea of shared administration and the public–private collaboration instituted in Trentino (a province located in northern Italy) in support of its cultural policy.
Design/methodology/approach
This study focusses on the Trentino’s music school system. This includes 13 organisations (musicians’ cooperatives as well as associations of musicians and students, plus one municipal school which do not overlap with the public school system). To analyse shared administration features, the authors rely on selected information from 50 interviews with Trentino Music Schools (TMS) teachers and administrators, and on the proceedings of the 1994 music school conference organised by the schools at the time when this novel educational system was created.
Findings
To offer an innovative educational service, the public actor (Provincia Autonoma di Trento [PAT]) and the schools (TMS) have developed a strong interdependence at the different levels of decision-making: PAT needs organisations that are sufficiently structured and organised to respect requirements of transparency and accountability, as well as educational standards, whereas TMS need public funding to maintain their service accessible for users, good labour conditions and be financially sustainable. Likewise, the success of TMS in educating thousands of students every year, including additional teaching programmes funded by PAT within general public schools, has contributed to decrease the exclusion from music education, raise interest in young people for music and fed enrolment in TMS as well as in the public schools related to the conservatoire filière. Conclusions emphasise the existence of a polycentric system of music culture production which needs to acknowledge the risk of being trapped in a static disequilibrium, while recognising change and the need to support and promote a culture of cooperation among schools and across layered institutional levels over time.
Research limitations/implications
Further research can observe this system of cultural production over time, to appreciate changes and organisational tranformations, while introducing comparative analysis with other systems in different regions.
Practical implications
The relationship between the public and private sectors to design, organise and manage activities of collective interest (in the social, cultural, sporting and other fields) can increasingly become an effective and efficient alternative to the traditional bureaucratic as well as to the competitive method. For this to happen, however, all actors involved must be aware not only of areas of efficiency but also of inefficiency. To remedy the latter, corrective measures will have to be introduced. For example, fostering and improving “co-programmazione” and “co-progettazione” means giving all stakeholders involved the opportunity to actively participate. Should the number of participants increase, more discussion fora could be set up because one alone may not be sufficient to foster maximum involvement, to enhance different points of view, to allow for intersectoral and multidisciplinary interpretations and responses.
Social implications
The system governance based on co-programming and co-design has allowed – despite limitations – to pursue educational purposes and thus well-being for the users, as well as for the teachers and the community as a whole. The continuity of this educational and cultural action has been guaranteed by the economic and financial sustainability of the schools, which is highly dependent on the public actor funding personnel costs, and in turn tied to the number of students (demand) attending each school. Actors embedded in the system need to build awareness of industry and cultural changes and knowledge of how to introduce more adaptive capacity. This points towards the need for strengthening networking capacity and collaboration among schools and other relevant stakeholders.
Originality/value
The case presented is a unique system of music culture production in Italy, and its governance has never been addressed by previous studies. It provides an application of shared administration to which public administrations and communities can learn to improve access to music culture and education. For public and private organisations to take advantage of the method of “co-programmazione” and “co-progettazione”, to make the production of a meritorious good more efficient and to favour its maximum accessibility, this study considers the strengths and weaknesses of this approach, or the areas of efficiency and inefficiency, for which new measures will have to be introduced.
Details
Keywords
Uncertainty, a state of unknowing linked to threats and opportunities, is a key characteristic of megaprojects, making it challenging for government officials and politicians to…
Abstract
Purpose
Uncertainty, a state of unknowing linked to threats and opportunities, is a key characteristic of megaprojects, making it challenging for government officials and politicians to decide on their initiation. For them, implementation by the private sector adds an extra layer of complexity and uncertainty to megaproject planning. In this context, only a few studies have focussed on governing and the mobilization of uncertainty arguments in communication between government actors and private developers either in favour of or against megaprojects. The purpose of this article is to shed light on how private megaproject proposals progress towards political acceptance or rejection in public decision-making.
Design/methodology/approach
This process of public decision-making on private megaproject proposals is examined in the case of the Helsinki–Tallinn undersea rail tunnel. In line with the interpretive research tradition, the authors’ study draws on a qualitative methodology underpinned by social constructionism. The research process can be characterized as abductive.
Findings
The authors’ findings suggest that while public decision-making on megaprojects is a conflictual and dynamic process, some types of uncertainty are relatively more important in affecting the perceived feasibility of the projects in the eyes of public sector decision-makers.
Originality/value
This study contributes to the debate on uncertainty management in megaprojects, proposing a new type of uncertainty – uncertainty about privateness – which has not been explicitly visible thus far.
Details
Keywords
Ricardo Santos, Amélia Brandão, Bruno Veloso and Paolo Popoli
This study aims to understand the perceived emotions of human–artificial intelligence (AI) interactions in the private sector. Moreover, this research discusses the…
Abstract
Purpose
This study aims to understand the perceived emotions of human–artificial intelligence (AI) interactions in the private sector. Moreover, this research discusses the transferability of these lessons to the public sector.
Design/methodology/approach
This research analysed the comments posted between June 2022 and June 2023 in the global open Reddit online community. A data mining approach was conducted, including a sentiment analysis technique and a qualitative approach.
Findings
The results show a prevalence of positive emotions. In addition, a pertinent percentage of negative emotions were found, such as hate, anger and frustration, due to human–AI interactions.
Practical implications
The insights from human–AI interactions in the private sector can be transferred to the governmental sector to leverage organisational performance, governmental decision-making, public service delivery and the creation of economic and social value.
Originality/value
Beyond the positive impacts of AI in government strategies, implementing AI can elicit negative emotions in users and potentially negatively impact the brand of private and government organisations. To the best of the authors’ knowledge, this is the first research bridging the gap by identifying the predominant negative emotions after a human–AI interaction.
Details
Keywords
Michael Opara, Robert Rankin, Ran Ling and Thien Le
In this study, the authors revisit Alberta's public-private partnership (P3) program after 20 years of field level experience by retracing its historical emergence and…
Abstract
Purpose
In this study, the authors revisit Alberta's public-private partnership (P3) program after 20 years of field level experience by retracing its historical emergence and institutional evolution given its political context. Specifically, the authors adopt a path dependence perspective to reconstruct and reexamine Alberta's P3 program emergence, reflect on the successes achieved, and articulate challenges that must be overcome to institutionalize P3s as part of Alberta's infrastructure delivery environment in the future.
Design/methodology/approach
Adopting a constructivist approach and a case-based methodology, the authors (re)analyze the activities of governmental agents, private industry, and other actors as part of a new infrastructure policy introduced in 2002 to transform the provincial institutional landscape to accommodate P3.
Findings
The authors find Alberta's P3 emergence was driven by the necessity of its infrastructure deficits, political expediency, and resource scarcity. Furthermore, with well-entrenched conservative political actors as gatekeepers, Alberta's P3 implementation demonstrated stability and incremental change simultaneously, consistent with core elements of path dependency. Following the introduction of P3 in Alberta, the province lacked formal institutional structures that would transition its P3 program from good to great and enable it to become firmly embedded in the public infrastructure delivery landscape. With the subsequent absence of P3-convinced (political) leadership and uncertainty about its P3 policy direction, Alberta was unable or unwilling to consolidate the progress made at the start of the program.
Originality/value
Most recently, the emergence of new political leadership in Alberta has (re)catalyzed policy progress, pointing toward a more methodical program approach, and suggesting a rediscovered confidence in P3s in the province with the establishment of a P3 Office (P3O), including nascent formal rules for unsolicited bids. These recent changes in our view make for a much more anchored policy and could lead to program sustainability and eventual institutionalization. Given the unpredictability of the recent political change, a more robust analysis of the relationship between political party control, leadership, and P3 stability is required to anticipate future policy and organizational obstacles.
Details
Keywords
Michael Opara, Oliver Nnamdi Okafor, Akolisa Ufodike and Kenneth Kalu
This study adopts an institutional entrepreneurship perspective in the context of public–private partnerships (P3s) to highlight the role of social actors in enacting…
Abstract
Purpose
This study adopts an institutional entrepreneurship perspective in the context of public–private partnerships (P3s) to highlight the role of social actors in enacting institutional change in a complex organizational setting. By studying the actions of two prominent social actors, the authors argue that successful institutional change is the result of dynamic managerial activity supported by political clout, organizational authority and the social positioning of actors.
Design/methodology/approach
The authors conducted a field-based case study in a complex institutional and organizational setting in Alberta, Canada. The authors employed an institutional entrepreneurship perspective to identify and analyze the activities of two allied actors motivated to transform the institutional environment for public infrastructure delivery.
Findings
The empirical study suggests that the implementation of institutional change is both individualistic and collaborative. Moreover, it is grounded in everyday organizational practices and activities and involves a coalition of allies invested in enacting lasting change in organizational practice(s), even when maintaining the status quo seems advantageous.
Originality/value
The authors critique the structural explanations that dominate the literature on public–private partnership implementation, which downplays the role of agency and minimizes its interplay with institutional logics in effecting institutional change. Rather, the authors demonstrate that, given the observed impact of social actors, public–private partnership adoption and implementation can be theorized as a social phenomenon.
Details
Keywords
Lorenzo Pratici and Phillip McMinn Singer
Health-care systems around the globe share several pressing challenges – including increasing costs and patient outcomes. Innovative arrangements, such as public–private…
Abstract
Purpose
Health-care systems around the globe share several pressing challenges – including increasing costs and patient outcomes. Innovative arrangements, such as public–private partnerships (PPP) can be adopted to help address these challenges. Although the promise of PPPs is great, so are its peril if the arrangements are not managed and regulated adequately through the contracting process. Yet, PPP arrangements can introduce their own unique set of problems. This paper aims to analyze how PPPs contracting accounts for three major problems identified reviewing the: performance measurement and audit; determination of compensation and risk management–related issues.
Design/methodology/approach
The authors used a case study approach to analyze contracting among health-care PPPs in two countries: Italy and the USA. With a structured review performed on Scopus database using a keywords Boolean research, the authors identified three recurring major issues to investigate in two selected cases, one per country. For each major issue, the authors defined several sub-issues retrieved from a widely used institutional framework. In each sub-issue, a documental analysis on all published information related to the signed contract has been performed identifying the approaches used by the two organizations.
Findings
The authors find that PPP contracting in the USA case seems to be oriented more toward managing institutional change as well as more flexibility in the deductibility and compensation determination for organizations and providers, suggesting this organization is more oriented to change in general. The authors find that PPP contracting in Italy more clearly delineate the allocation of risk between organizations that engage in PPPs, suggesting a more practical approach.
Practical implications
PPP is complex. Contracting helps manage the complexity of these arrangements. This case study approach to PPP contracting highlights the variation in contracting approaches across two different countries. Policymakers and health-care managers need to ensure that PPP contracting clearly delineates auditing and performance measurement, compensation and risk management.
Originality/value
The authors’ analysis sheds light on the different approaches to arranging health-care PPPs in two different country settings. More research should be done to connect these different approaches to important outcomes, such as patient and organizational finances, as well as expanding the scope of countries adopting PPP in health care.
Details
Keywords
Jianfeng Zhao, Niraj Thurairajah, David Greenwood, Henry Liu and Jingfeng Yuan
The unprecedented SARS-CoV-2 (COVID-19) pandemic has further constrained the budgets of governments worldwide for delivering their much-needed infrastructure. Consequently, public…
Abstract
Purpose
The unprecedented SARS-CoV-2 (COVID-19) pandemic has further constrained the budgets of governments worldwide for delivering their much-needed infrastructure. Consequently, public-private partnerships (PPPs), with the private sector's investment and ingenuity, would appear to be an increasingly popular alternative. Value for money (VfM) has become the major criterion for evaluating PPPs against the traditional public sector procurement and, however, is plagued with controversy. Hence, it is important that governments compare and contrast their practice with similar and disparate bodies to engender best practice. This paper, therefore, aims to understand governments' assessment context and provide a cross-continental comparison of their VfM assessment.
Design/methodology/approach
Faced with different domestic contexts (e.g. aging infrastructure, population growth, and competing demands on finance), governments tend to place different emphases when undertaking the VfM assessment. In line with the theory of boundary spanning, a cross-continental comparison is conducted between three of the most noticeable PPP markets (i.e. the United Kingdom, Australia and China) about their VfM assessment. The institutional level is interpreted by a social, economic and political framework, and the methodological level is elucidated through a qualitative and quantitative VfM assessment.
Findings
There are individual institutional characteristics that have shaped the way each country assesses VfM. For the methodological level, we identify that: (1) these global markets use a public sector comparator as the benchmark in VfM assessment; (2) ambiguous qualitative assessment is conducted only against PPPs to strengthen their policy development; (3) Australia's priority is in service provision whereas that of the UK and China is project finance and production; and (4) all markets are seeking an amelioration of existing controversial VfM assessments so that purported VfM relates to project lifecycles. As such, an option framework is proposed to make headway towards a sensible selection of infrastructure procurement approaches in the post COVID-19 era.
Originality/value
This study addresses a current void of enhancing the decision-making process for using PPPs within today's changing environment and then opens up an avenue for future empirical research to examine the option framework and ensuing VfM decisions. Practically, it presents a holistic VfM landscape for public sector procurers that aim to engage with PPPs for their infrastructure interventions.
Details
Keywords
Nisha Prakash and Aparna Hawaldar
The effect of corporate social responsibility (CSR) on corporate financial performance (CFP) is shown to depend on both firm-specific and external factors. This study investigates…
Abstract
Purpose
The effect of corporate social responsibility (CSR) on corporate financial performance (CFP) is shown to depend on both firm-specific and external factors. This study investigates the moderating role of two firm-specific factors – the firm life-cycle stage and ownership structure – on the CSR–CFP relationship in a developing economy setting – India.
Design/methodology/approach
The study covers 1,419 listed companies in India during 2015–21. The firm lifecycle is represented using firm age and future growth prospects. Ownership is represented through a dummy variable and promoters’ holding percentages. Return on assets (RoA) is used as a measure of CFP, while CSR intensity, i.e. the ratio of CSR expenditure to profit after tax (PAT), is used to represent CSR. Fixed effect panel regression and generalized method of moments (GMM) models are used for data analysis.
Findings
CSR expenditure has a significant negative impact on CFP. Firm age and future growth prospects amplify this negative impact, indicating that the firm life-cycle has a significant negative moderating effect on the CSR–CFP relationship. Furthermore, the impact of CSR on CFP is worse for government companies than private ownership. Promoters’ holdings have a positive impact on the CSR–CFP relationship.
Research limitations/implications
The results question the validity of mandatory CSR expenditure on companies operating in developing countries and call for a differentiated policy approach to CSR expectations based on firm characteristics. This study also enhances the existing literature on CSR–CFP.
Originality/value
The growing research on CSR–CFP has limited coverage of firm characteristics as contributing factors. Hence, this paper helps in enhancing the existing literature on CSR–CFP and makes it more relevant to firms with specific characteristics.
Details