Janek Richter, Dirk Basten, Bjoern Michalik, Christoph Rosenkranz and Stefan Smolnik

Based on an exploratory case-based approach, the purpose of this paper is to open the KM black box and examine the relationships that link knowledge management (KM) inputs (i.e…

2137

Abstract

Purpose

Based on an exploratory case-based approach, the purpose of this paper is to open the KM black box and examine the relationships that link knowledge management (KM) inputs (i.e. knowledge resources and KM practices) via knowledge processes to KM performance. This paper aims to identify the underlying mechanisms and explain how KM performance is enabled.

Design/methodology/approach

This in-depth case study conducted at a medium-sized consultancy in the supply chain management industry empirically examines knowledge flows to uncover the relationships between KM inputs, knowledge processes and KM performance. We adopt the viable system model (VSM) as a theoretical lens to identify KM mechanisms.

Findings

By identifying six KM mechanisms, we contribute to the theoretical understanding of how KM inputs are interconnected and lead to KM performance via knowledge processes.

Originality/value

Based on the insights gained, we provide propositions that organizations should consider in designing viable KM. Our findings help organizations in understanding their KM with the help of knowledge flow analysis and identifying how critical KM elements are interconnected.

Details

Kybernetes, vol. 52 no. 13
Type: Research Article
ISSN: 0368-492X

Keywords

Open Access
Article
Publication date: 30 May 2023

Rehab Iftikhar, Mehwish Majeed and Nathalie Drouin

The purpose of this paper is to study the crisis management process for project-based organizations (PBOs) by developing a comprehensive model and propositions.

4113

Abstract

Purpose

The purpose of this paper is to study the crisis management process for project-based organizations (PBOs) by developing a comprehensive model and propositions.

Design/methodology/approach

This paper is based on a conceptual study. A literature review is considered a primary source for studying contemporary research, including 171 publications in total, which embody qualitative, quantitative, conceptual and theoretical studies. For data analysis, content analysis is used, which is comprised of descriptive and thematic analysis.

Findings

This study identifies five imperative elements of crisis management for PBOs which include (1) sense-making (information gathering and crisis interpretation), (2) decision-making (accurate and timely decision), (3) response (reactive response), (4) outcome (success/failure) and (5) learning. Based on these findings, this study proposes an integrative model of the interplay between sense-making, decision-making, response, outcome and learning. Furthermore, the findings lead to propositions for each of the elements. The paper contributes to the literature on dynamic capability theory.

Originality/value

This paper explores the crisis management process for PBOs. The proposed model deepens the understanding of the practices and processes of project-based crisis management.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 26 June 2023

Petter Haglund and Mats Janné

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service…

1159

Abstract

Purpose

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service provider (LSP). However, construction logistics is normally approached either as a strategic decision or as an operational issue and rarely as a tactical concern. The purpose of this study is to explore how to organize the logistics outsourcing decision at strategic, tactical and operational levels.

Design/methodology/approach

This study is performed as a single-case study within a construction corporation, containing (amongst others) a building contractor (BC) and a construction equipment rental company (CERC) offering logistics services.

Findings

The study shows that to procure construction logistics service successfully, BCs need logistics capabilities at strategic and tactical levels to maintain an alignment between the use of logistics services and operational characteristics. Simultaneously, CERC’s need to design their service offerings to correspond to the needs of the BC.

Research limitations/implications

This study builds on a single-case study of a Swedish construction corporation. Further research is needed to better understand current logistics outsourcing and development practices and how these can be improved to foster better logistics management at the project level.

Practical implications

BCs find suggestions of different logistics organization structures and suitable outsourcing arrangements. CERCs and LSPs can use the findings to understand their customers’ needs and adapt service offerings.

Originality/value

To the best of the authors’ knowledge, this study is one of the first studies of how two companies within a corporation can work together to develop construction logistics service offerings.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 28 February 2019

Melody Barlage, Arjan van den Born and Arjen van Witteloostuijn

More and more workers in Western economies are operating as freelancers in the so-called “gig economy”, moving from one project – or gig – to the next. A lively debate revolves…

Abstract

More and more workers in Western economies are operating as freelancers in the so-called “gig economy”, moving from one project – or gig – to the next. A lively debate revolves around the question as to whether this new employment relationship is actually good for innovation in the 21 st century economy. Proponents argue that in this gig process valuable knowledge is created and transferred from one organization to the next via freelancers through their sequence of temporary gigs or projects. Antagonists reason that freelancers are only hired as one-trick ponies on a transactional basis, where knowledge is neither created nor shared. In this study, we focus on the characteristics of gigs. Which project characteristics lead to increased engagement of freelancers, and hence to knowledge-sharing behavior? Our study suggests that the gig economy can indeed lead to increased knowledge sharing by and engagement of freelance workers, provided that organizations and freelancers structure and shape gigs in such a way that they: (1) not only suit the task requirements at hand and (2) fit with the acquired skills of the freelancer, but that these gigs also (3) leave ample of room for the freelancer’s individual growth and development of new skills. This suggests that innovative organizations will need to shape gigs in such a way that freelancers are not only hired for their expertise, but rather that gigs also provide a learning opportunity for freelancers.

Details

Emerald Open Research, vol. 1 no. 4
Type: Research Article
ISSN: 2631-3952

Keywords

Open Access
Article
Publication date: 29 December 2022

Petter Haglund and Martin Rudberg

Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics…

2989

Abstract

Purpose

Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics strategy from a process of establishing fit perspective.

Design/methodology/approach

A large Swedish building contractor's logistics strategy process was analysed using a longitudinal single-case study for a period of 11 years (2008–2019).

Findings

The case study reveals three main constraints to logistics strategy implementation: a dominant purchasing organisation, a lack of incentives and diverging top-management priorities. This suggests that logistics strategy fit is not a conscious choice determined by contextual factors.

Research limitations/implications

Establishing fit is a continuous cycle of regaining fit between the logistics context and logistics strategy components. Fit can be achieved by a change to the logistics context or to logistics strategy components.

Practical implications

Logistics managers may need to opt for satisfactory fit in view of the costs incurred by changing strategy versus the benefits to be gained from a higher degree of fit.

Originality/value

This paper adopts a longitudinal case design to study the fit between the logistics context and strategy, adding to the body of knowledge on organisational design and strategy in logistics and supply chain management.

Details

The International Journal of Logistics Management, vol. 34 no. 7
Type: Research Article
ISSN: 0957-4093

Keywords

Open Access
Article
Publication date: 21 March 2024

Angela França Versiani, Pollyanna de Souza Abade, Rodrigo Baroni de Carvalho and Cristiana Fernandes De Muÿlder

This paper discusses the effects of enabling conditions of project knowledge management in building volatile organizational memory. The theoretical rationale underlies a recursive…

Abstract

Purpose

This paper discusses the effects of enabling conditions of project knowledge management in building volatile organizational memory. The theoretical rationale underlies a recursive relationship among enabling conditions of project knowledge management, organizational learning and memory.

Design/methodology/approach

This research employs a qualitative descriptive single case study approach to examine a mobile application development project undertaken by a major software company in Brazil. The analysis focuses on the project execution using an abductive analytical framework. The study data were collected through in-depth interviews and company documents.

Findings

Based on the research findings, the factors that facilitate behavior and strategy in managing project knowledge pose a challenge when it comes to fostering organizational learning. While both these factors play a role in organizational learning, the exchange of information from previous experience could be strengthened, and the feedback from the learning process could be improved. These shortcomings arise from emotional tensions that stem from power struggles within knowledge hierarchies.

Practical implications

Based on the research, it is recommended that project-structured organizations should prioritize an individual’s professional experience to promote organizational learning. Organizations with well-defined connections between their projects and strategies can better establish interconnections among knowledge creation, sharing and coding.

Originality/value

The primary contribution is to provide a comprehensive view that incorporates the conditions required to manage project knowledge, organizational learning and memory. The findings lead to four propositions that relate to volatile memory, intuitive knowledge, learning and knowledge encoding.

Details

Innovation & Management Review, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2515-8961

Keywords

Open Access
Article
Publication date: 17 March 2023

Charlotta Winkler

This paper aims to explore the process of implementing solar photovoltaic (PV) systems in construction to contribute to the understanding of systemic innovation in construction.

1091

Abstract

Purpose

This paper aims to explore the process of implementing solar photovoltaic (PV) systems in construction to contribute to the understanding of systemic innovation in construction.

Design/methodology/approach

The exploratory research presented is based on qualitative data collected in workshops and interviews with 76 construction- and solar-industry actors experienced in solar PV projects. Actor-specific barriers were identified and analysed using an abductive approach.

Findings

In light of established definitions of systemic innovation, the process of implementing solar PV systems in construction involves challenges regarding technical and material issues, competencies, and informal and formal institutions. The specificities of this case highlight the necessity of paying attention to details in the process and to develop knowledge of systemic innovation in construction since the industry’s involvement in addressing societal challenges related to the energy transition will require implementing such innovations much more in the future.

Practical implications

New knowledge of solar PV systems as an innovation in professional construction is collected, enabling the adaptation of management strategies for its implementation. This knowledge can also be applied generally to other challenges encountered in highly systemic innovation implementation. Solar industry actors can gain an understanding of solar-specific challenges for the construction industry, challenges for which they must adapt their activities.

Originality/value

The exploration of actor-specific experiences of solar PV projects has resulted in a novel understanding of this specific innovation and its implementation. The findings illustrate a case of a high level of systemic innovation and the need to use a finer-grained scale for classification when studying innovation in construction.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 19 March 2024

Mansoor Ahmed and Lorenzo Lucianetti

The research study provides empirical insights on the relationship between entrepreneurial leadership (EL), entrepreneurial passion for founding (EPF), entrepreneurial bricolage…

Abstract

Purpose

The research study provides empirical insights on the relationship between entrepreneurial leadership (EL), entrepreneurial passion for founding (EPF), entrepreneurial bricolage (EB) and project success (PS), in the case of freelancers. The study aims to get a better understanding of whether freelancers, who behave like entrepreneurial leaders, can successfully complete projects through EB.

Design/methodology/approach

The study collected data from 209 freelancers through snowball sampling, in two waves, with a time-lag of fourteen days, to better examine the causality of variables. Data were analyzed by Model No. 4 and 7 (i.e. mediation and moderation, respectively) of Process macro.

Findings

Drawing on the effectuation theory, the results show that EB mediates the relationship between EL and PS and EPF moderates this relationship.

Practical implications

The freelancers can formally establish businesses later, after knowing whether they can complete these new types of projects. These online freelancing platforms can provide special services to freelancers who first want to test their skills on unrelated projects. In sum, the paper suggests that freelancers can be successful entrepreneurial leaders.

Originality/value

The EL, EPF, EB and PS are studied in the context of the informal sector, i.e. freelancing, which is the emerging working style in the world. It provides an in-depth understanding of phenomena in freelancers that lacks background literature.

Details

Journal of Small Business and Enterprise Development, vol. 31 no. 8
Type: Research Article
ISSN: 1462-6004

Keywords

Open Access
Article
Publication date: 8 December 2022

Rajenlall Siriram

The objective of this research is to explore integration and transition activities in large industrial projects. The purpose is to (a) obtain a better understanding of the…

1720

Abstract

Purpose

The objective of this research is to explore integration and transition activities in large industrial projects. The purpose is to (a) obtain a better understanding of the integration and transition activities between the project front-end (FE) and project initiation phases (PIPs), (b) explore what, how and when these integrations and transitions occur, and (c) explore what the integration and transition activities mean to project practitioners.

Design/methodology/approach

A qualitative research design methodology is followed, based on interviews using open-ended questions. An expert panel is used to provide responses to questions pertaining to the integration and transition between the project FE and PIP. The research is focused on managing large projects in the South African electrical engineering industrial projects industry. A literature review combined with empirical analysis reflects the importance of integrating and transitioning in project business.

Findings

The findings provide guidance to researchers and practitioners on integration and transition mechanisms, how and when these occur. It highlights the benefits of integration and transition activities. Important lessons for researchers and practitioners are provided together with areas for future research.

Originality/value

This is an interpretative analysis of expert opinion. Expert panel members are experienced at senior decision-making level, and their expertise was accessed based on experience, education and knowledge. This extensive experience is shared in this paper providing insights into their opinions, experiences, success and failures. These inputs together with the literature review provide interesting implications for both a theoretical foundation as well as practical implications for practitioners.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2070

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Access

Only content I have access to

Year

Last 6 months (134)

Content type

1 – 10 of 134