Search results

1 – 10 of over 142000
Article
Publication date: 16 May 2023

Xiaolin Li, Huimin Li, Ruirui Zhang, Yilin Yin, Shaonan Sun, Juan Bai and Ruihua Liu

The purpose of this study is to explore the impact of asymmetric trust on construction project management performance in China's construction industry. Moreover, the authors…

Abstract

Purpose

The purpose of this study is to explore the impact of asymmetric trust on construction project management performance in China's construction industry. Moreover, the authors explore the mediating role of two types of knowledge sharing (explicit knowledge sharing and tacit knowledge sharing) in explaining the association between asymmetric trust and project management performance.

Design/methodology/approach

A theoretical model based on the research hypotheses proposed in this study was developed and a questionnaire survey was conducted with 271 professionals. The data collected was analyzed by the structural equation modeling (SEM) technique.

Findings

The results of this study indicate that there is a significant and negative association between asymmetric trust and project management performance. Moreover, two types of knowledge sharing (explicit knowledge sharing and tacit knowledge sharing) have different degrees of impact on improving project management performance. In addition, tacit knowledge sharing is a mediator between asymmetric trust and project management performance.

Research limitations/implications

The data used in this study is from Chinese scenarios, so the research conclusions and application effects based on this are bound to have certain regional limitations. Besides, there are many factors that affect project management performance improving, and the relationships among them are so complex. The theoretical model proposed in this study may not be fully considered. Therefore, follow-up researchers can consider bringing more suitable variables into their researches, so that the theoretical researches can be more in line with the actual project management practice, and the specific mechanism for improving project management performance can be explained more deeply.

Originality/value

This research's value is as follows: Firstly, this paper contributes to the trust and relational governance literature by expanding the research perspective of mutual trust to asymmetric trust. Specially, this research designs a measurement scale for asymmetric trust and then reveals the impact mechanism of it on project management performance, which will certainly promote research paradigm change of trust. Secondly, this research is beneficial to knowledge sharing literature in the construction management field by expanding the research scope of knowledge sharing from a cross-organizational perspective.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 September 2022

Bashir Tijani, Xiaohua Jin and Robert Osei-Kyei

Due to the frenetic and dynamic working conditions ascribed to architecture, engineering and construction (AEC) project organizations, enormous research has addressed the poor…

Abstract

Purpose

Due to the frenetic and dynamic working conditions ascribed to architecture, engineering and construction (AEC) project organizations, enormous research has addressed the poor mental health propensity of project management practitioners (PMPs). However, research has not considered the distant factors related to organizational design causing poor mental health. Therefore, this study addresses the problem by integrating institutional theory, agency theory and resource-based theory (RBT) to explore the relationship between organizational design elements: project governance, knowledge management, integrated project delivery, project management skills and mental health management indicators. Examples of mental health management indicators include social relationships, work-life balance and project leadership.

Design/methodology/approach

Purposive sampling method was adopted to collect survey data from 90 PMPs in 60 AEC firms in Australia. Structural equation modelling (SEM) was utilized to test the relationship between the variables.

Findings

The research found that project governance, knowledge management and integrated project delivery are positively correlated to mental health management indicators. However, the research finding suggests that project management skills have a negative impact on mental health management indicators.

Originality/value

The findings offer guidelines to AEC firms on achieving positive mental health management outcomes through concentration on project governance, knowledge management and integrated project delivery. It further calls for a reconsideration of existing project management skills causing poor mental health management outcomes.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 June 2017

Wise Mainga

The purpose of this paper is to use survey data to rank the relative importance of perceived factors that inhibit the transfer of knowledge across projects and examine the…

5061

Abstract

Purpose

The purpose of this paper is to use survey data to rank the relative importance of perceived factors that inhibit the transfer of knowledge across projects and examine the statistical relationship between various “higher order” dimensions of project management competencies and project efficiency among a sample of project-based firms (PBFs).

Design/methodology/approach

The research philosophical approach adopted was post-positivism, a half-way house between positivism and phenomenological approaches. The author used a largely structured survey questionnaire with an inclusion of few open-ended items. The survey data collected were largely based on the “perceptions” of mostly experienced project management practitioners, whose perspectives on project processes and performance are likely to be more dependable. Because of budget limitations, a total of 260 questionnaires were mailed to randomly selected PBFs (with an enclosed self-addressed and stamped return envelope). Of the 260 questionnaires sent to PBFs, 58 questionnaires were returned, representing a return rate of just over 22 percent.

Findings

Results indicate that “high time pressures towards the end of the project,” “too much focus on short-term project deliverables,” and “fear of negative sanctions when disclosing project mistakes” were three top-ranked factors that inhibited knowledge transfer across projects. Some “higher order” project management competencies like “dynamic competencies” have relatively a greater impact on predicting project efficiency. Dynamic competencies will only continue to increase in importance as today’s project environments are characterized as continuously evolving, turbulent, and complex and require the need to be effective in dealing with various uncertainties. Once included in the regression equation, the “ownership variable” dominates all other explanatory variables in predicting project efficiency among a sample of PBFs in the United Arab Emirates (UAE), most likely driven by the project management competencies of multinational corporations (MNCs). However, the project efficiency of state-owned PBFs did not differ significantly from that of “international firms that were not MNCs.” Specific conditions may have led to such an outcome. The author shows that enhancing project efficiency requires the reinforcement of multiple but specific factors.

Research limitations/implications

As the study was largely conducted on a limited budget and time frame, the author was not able to employ a multi-method approach. The inclusion of a few case studies would have facilitated triangulation of the current findings. In addition, the study captures “perceptions” and practical experiences of project management practitioners. Future studies could possibly develop what may be seen as “objective” measures of project learning and project management competencies. A larger survey supported by a larger budget would be one option in which some of the findings could be tested across PBFs located in different sectors and countries.

Practical implications

The author argues that the creation of a client-led “no-blame culture” within PBFs can ensure the development of a “safe” environment in which project team members can acknowledge project mistakes without the fear or danger(s) that may come with such admission. This may require changes in project organizational culture that reduces power distance, lowers sensitivity to hierarchal power relations, enhances team building efforts, and fosters a “learning climate” that tolerates “trial and error” experimentation. It may also require strengthening clients’ specific capabilities. Such change may require time and patience but could take advantage of “positive” aspects of participatory practices, personal relationships, and consensus decision-making approach that is prevalent in the UAE culture. One managerial implication points to the need to tailor scarce resources in building up multi-dimensional “higher order” competencies like “dynamic competencies” that have a relatively higher significant impact on enhancing project efficiency. Linking MNCs with local PBFs as collaborative mega project delivery partners may lead to enhancing project management competencies of the latter, conditional on their absorptive capacity.

Originality/value

The contribution of the paper is in providing survey-based empirical evidence that goes beyond case studies to highlight the importance of enhancing “higher order” project management competencies, such as “dynamic competencies,” that have a stronger predictive power of project efficiency in PBFs. The study also ranks the relative importance of various factors that inhibit the transfer of new knowledge across projects. To the author’s knowledge, this is the first study that has demonstrated the statistical relationship between “higher order” project management competencies and project efficiency. Project efficiency is a multi-faceted construct. Its strengthening is determined by a configuration of multiple but specific factors. A more “nuanced” understanding of the relationship between project management competencies and project efficiency in a particular context may be required.

Details

International Journal of Managing Projects in Business, vol. 10 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 11 July 2016

Gideon Nkuruziza, Francis Kasekende, Samson Omuudu Otengei, Shafic Mujabi and Joseph Mpeera Ntayi

The purpose of this paper is to examine the ways of improving performance of agricultural projects through stakeholder engagement and knowledge management in a Sub-Saharan…

Abstract

Purpose

The purpose of this paper is to examine the ways of improving performance of agricultural projects through stakeholder engagement and knowledge management in a Sub-Saharan context.

Design/methodology/approach

Data were collected using a self-administered questionnaire from 342 agricultural projects in Mukono and Wakiso districts in Uganda. Descriptive statistics and inferential statistics were used in the analysis.

Findings

The results reveal that stakeholder engagement and knowledge management are valuable intangible resources that significantly influence performance of agricultural projects. The findings, managerial and policy implications are fully discussed in this paper.

Originality/value

The authors empirically show that a model that synchronizes stakeholder engagement, knowledge management and performance of agricultural projects is a requirement for promoting sustainable agricultural performance outcomes. This study makes a contribution by providing information that is relevant for filling the practical gap that exists in agricultural projects of Sub-Saharan Africa as well as contributing to the theoretical development of project management discipline.

Details

International Journal of Social Economics, vol. 43 no. 7
Type: Research Article
ISSN: 0306-8293

Keywords

Article
Publication date: 23 June 2021

Constance Elizabeth Kampf, Charlotte J. Brandt and Christopher G. Kampf

The purpose is to explore how the process of action research (AR) can support building legitimacy and organizational learning in innovation project management and portfolio…

Abstract

Purpose

The purpose is to explore how the process of action research (AR) can support building legitimacy and organizational learning in innovation project management and portfolio practices in merger contexts.

Design/methodology/approach

Meta-reflection on method issues in Action Research through an action research case study with an innovation group during an organizational change process. This case demonstrates an example of an action research cycle focused on building practitioner legitimacy rather than problem-solving.

Findings

Key findings include (1) demonstrating how AR can be used for building legitimacy through visualizing the innovation process, and embedding those visuals in top management practices of the organization; and (2) demonstrating how AR can work as an organizational learning tool in merger contexts.

Research limitations/implications

This study focuses on an action research cooperation during a two-and-a-half-year period. Thus, findings offer the depth of a medium term case study. The processes of building legitimacy represent this particular case, and can be investigated in other organizational contexts to see the extent to which these issues can be generalized.

Practical implications

For researchers, this paper offers an additional type of AR cycle to consider in their research design which can be seen as demonstrating a form of interplay between practitioner action and organizational level legitimacy. For practitioners, this paper demonstrates a connection between legitimacy and organizational learning in innovation contexts. The discussion of how visuals were co-created and used for building legitimacy for an innovation process that differs from the standard stage gate model demonstrates how engaging in AR research can contribute to developing visuals as resources for building legitimacy and organizational learning based on connections between theory and practice.

Originality/value

This case rethinks AR practice for innovation project management contexts to include legitimacy and organizational learning. This focus on legitimacy building from organizational learning and knowledge conversion contributes to our understanding of the soft side of innovation project management. Legitimacy is demonstrated to be a key concern for innovation project management practices.

Details

International Journal of Managing Projects in Business, vol. 16 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 31 July 2019

Linhua Sang, Dongchun Xia, Guodong Ni, Qingbin Cui, Jianping Wang and Wenshun Wang

The purpose of this paper is to explore the influence mechanism of job satisfaction and positive affect on knowledge sharing among project members in Chinese construction…

1821

Abstract

Purpose

The purpose of this paper is to explore the influence mechanism of job satisfaction and positive affect on knowledge sharing among project members in Chinese construction industry, and test the moderating role of organizational commitment between them in order to find a new approach from the perspective of psychology to improve the knowledge sharing performance within project management organizations in China constantly.

Design/methodology/approach

An empirical study was used based on confirmatory factor analysis and hierarchical regression analysis with a sample of 540 project members from 80 project management organizations in China.

Findings

Research results showed that job satisfaction and positive affect of project members both have a significant positive impact on knowledge sharing; organizational commitment could moderate the influence of job satisfaction and positive affect on knowledge sharing among project members partially within the Chinese context.

Research limitations/implications

A questionnaire study from China only represents the relationship and regular pattern within a shorter time interval in the Chinese context. It is necessary to continue to implement a longitudinal study in a relatively long period in future research.

Practical implications

Knowledge sharing among project members can be enhanced through improving job satisfaction and positive affect, and strengthening project members’ organizational commitment can amplify the influence effect of job satisfaction and positive affect on knowledge sharing.

Originality/value

This paper clarifies the direct influence mechanism of project members’ job satisfaction and positive affect on explicit knowledge sharing (EKS) and tacit knowledge sharing (TKS), and further tests the partial moderating effect of organizational commitment on the influence relationship of job satisfaction and positive affect on EKS and TKS.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 August 2018

Carlos F. Gomes, Michael H. Small and Mahmoud M. Yasin

The purpose of this paper is to assess the management of public-sector projects in Portugal paying particular attention to the extent to which total quality management (TQM…

1098

Abstract

Purpose

The purpose of this paper is to assess the management of public-sector projects in Portugal paying particular attention to the extent to which total quality management (TQM) principles are being utilized in such projects.

Design/methodology/approach

Based on an extensive review of the literature, nine propositions are advanced about the interrelationships among seven factors that were identified, in a previous study, as having some influence on the management process in the planning and implementation of public-sector projects in Portugal. Structural equation modeling was used to investigate these propositions using data obtained from 211 respondents to a survey of project managers from municipalities across Portugal.

Findings

The results of the structural equation model indicate that the TQM components working in tandem with project-management-specific variables provide a systematic means of managing the planning and implementation stages of projects, with technical items being critical in the planning stage and softer management items becoming important in the implementation stage.

Research limitations/implications

Readers should be careful not to generalize the findings in a global context or for private sector projects. However, researchers are encouraged to extend this study by including other planning and implementation variables with a view to discerning what particular characteristics of a project make it more amenable to TQM solutions.

Practical implications

The findings are presented to show how the key components of TQM, customer focus, employee involvement and continuous involvement, can be applied during the planning and implementation stages of projects.

Originality/value

The sample size of 211 is representative of the underlying population of project managers in municipalities across Portugal and is comparatively large in relation to other empirical project management studies from Portugal, lending credence to the generalizability of these finding to public-sector projects in Portugal.

Details

International Journal of Public Sector Management, vol. 32 no. 2
Type: Research Article
ISSN: 0951-3558

Keywords

Article
Publication date: 27 September 2021

Giustina Secundo, Gianluca Elia, Alessandro Margherita and Karl-Heinz Leitner

Managing a project involves taking a number of critical decisions that can have a crucial impact on the success or failure of the initiative. The analytical definition and…

3080

Abstract

Purpose

Managing a project involves taking a number of critical decisions that can have a crucial impact on the success or failure of the initiative. The analytical definition and visualization of the main components of a project can support project managers engaged to address the right issues at the right time. This article aims to identify crucial crossroads in the management of a project and to provide a visual representation of knowledge involved into a system of project components and decisions.

Design/methodology/approach

A design science process is adopted to define the initial goals and requirements and to develop the knowledge visualization framework. Expert feedback is also gathered to obtain a preliminary validation of the framework.

Findings

Moving from a system view of project dimensions, we identify eight types of strategic decisions, i.e. growth, problem shifting, goals balancing, escalation, rewarding, resource allocation, problem fixing and cooperation. We then present a visualization map of project decision making addressing six categories of knowledge (i.e. “what-knowledge”, “how-knowledge”, “who-knowledge”, “why-knowledge”, “what for-knowledge”, “when-knowledge”).

Research limitations/implications

The framework needs further theoretical refinement in terms of more fine-grained decision types, other determinants and the reciprocal influence in the management of project activities.

Practical implications

The article can support project managers attempting to build a comprehensive view of project decisions, and it can be a basis to develop novel types of knowledge management systems for project-related applications.

Originality/value

The article proposes a new approach to sustain strategic decision making in project management by adopting a knowledge visualization view. Moreover, it provides an operational tool for managers and analysts at different levels engaged into the management of a project.

Details

Management Decision, vol. 60 no. 4
Type: Research Article
ISSN: 0025-1747

Keywords

Article
Publication date: 1 February 2004

Michel J. Leseure and Naomi J. Brookes

The results of a research project dealing with knowledge management in project environments and the capability to transfer knowledge across projects teams are presented. A key…

14933

Abstract

The results of a research project dealing with knowledge management in project environments and the capability to transfer knowledge across projects teams are presented. A key distinction is made between generic project knowledge (kernel knowledge) and specific project knowledge (ephemeral knowledge). For each type of knowledge, knowledge management benchmarks are described and discussed. The empirical data used in this paper was collected from companies of various sizes operating in the manufacturing, construction and service sectors.

Details

Journal of Knowledge Management, vol. 8 no. 1
Type: Research Article
ISSN: 1367-3270

Keywords

Article
Publication date: 19 April 2022

Adnan Alghail, Liu Yao and Mohammed Abbas

The factors for higher education institutions’ (HEIs) project management failure have been studied for several years. One of the issues is a lack of tools to combine their…

Abstract

Purpose

The factors for higher education institutions’ (HEIs) project management failure have been studied for several years. One of the issues is a lack of tools to combine their knowledge infrastructure capabilities (KIC) with project management (PM) to examine these infrastructures and monitor maturity. There are several project management maturity (PMM) models available. However, there are just a few empirical studies that support the three knowledge infrastructure capabilities and PMM integrations. As a result, the current research aims to suggest a new conceptual model, KIC-knowledge management (KM), and assess a research model that includes the three knowledge infrastructure capabilities as a prerequisite to elevate the PMM.

Design/methodology/approach

Partial least squares structural equation modeling (PLS-SEM) is used to evaluate the proposed research model. The study’s hypotheses were also examined using a sample of 352 respondents from PM departments at ten Yemeni public universities.

Findings

The study found that if the three key knowledge infrastructure capabilities integrate into the PMs, then it will help HEIs to perform project tasks more effectively and efficiently. Also, it will improve the PM maturity level if all the three capabilities positively effect PMM.

Research limitations/implications

The study findings cannot be generalized to other industries because the collected date were with the Yemeni public universities’ context. Also, the new proposed model can be assessed in various sectors to increase the validity of the model. One more thing, future academics can conduct qualitative research study to validate again the proposed model.

Practical implications

Project managers can develop and improve their organization’s effectiveness and performance by focusing on these findings and using the developed model. Also, the findings of this study can be used as a benchmark for evaluating initiatives and knowledge-based governmental entities.

Social implications

It is an opportunity for knowledge-based governmental entities particularly and other organizations to elevate most of projects to achieve a supreme level of maturity. Also, this study will assist employees to understand the relationship between KICs and projects within HEIs in Yemen.

Originality/value

This paper is among the first to empirically study the impact of the three knowledge infrastructure capabilities toward PMM. It links between two important domains: KM and PM.

Details

VINE Journal of Information and Knowledge Management Systems, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2059-5891

Keywords

1 – 10 of over 142000