Search results

1 – 10 of 825
Article
Publication date: 26 September 2023

Lunyan Wang, Mengyu Tao, Xiaowei An, Guanghua Dong, Yehui Huang and Haoyu Wang

The operation of water environment treatment Public-Private Partnership projects (WETP-PPP) is crucial to the project effectiveness. However, there are often problems in projects…

Abstract

Purpose

The operation of water environment treatment Public-Private Partnership projects (WETP-PPP) is crucial to the project effectiveness. However, there are often problems in projects that attach importance to construction and neglect operation management, which seriously affect the project operation effect. To ensure the good operation effect of the WETP-PPP, an evolutionary game model of the regulation strategy during the operation period of WETP-PPP is constructed.

Design/methodology/approach

An evolutionary game model of regulation is established which considers the government, the project company and the public in water environment treatment Public-Private Partnership projects (WETP-PPP). Five scenarios of equilibriums and the game's evolutionary stable strategies are analyzed, and the corresponding stability conditions are then obtained. Finally, through the simulation, the influence of different factors on the choice of the three-party strategy is analyzed.

Findings

First, the key factors that affect the evolution game are the regulation costs and performance rewards of the government, the project company's operation costs and penalties for opportunism and the public supervision costs and rewards. Second, in order to ensure the operation effect, the government needs the performance incentive from the superior government. Third, the public's supervision enthusiasm needs to be mobilized by the government. Last, the penalty strength of speculative operation should be strong enough to play a deterrent role.

Research limitations/implications

The theoretical research in this paper has some limitations. Initially, due to the large number of participants in WETP-PPP, in addition to the government department, the project company and the public studied in this paper, it also involves the consulting industry and financial institutions. In the future, more participants can be added to form four-party interest relationships and conduct four-party evolutionary game research. Second, the operation environment of WETP-PPP is complex and changeable, and various influencing factors are intertwined, the number of parameters involved in this paper is limited, and further detailed research is needed in the future.

Practical implications

Based on the evolutionary game theory, this article discusses the evolution law of the tripartite game behavior of the government department, the project company and the public, which is helpful to clarify the strategy evolution path of the tripartite in the WETP-PPP, and the generation condition and evolution mechanism of the equilibrium strategy of the tripartite game. The key parameters affecting the tripartite strategy selection are analyzed through simulation, which can provide reference for the government department to formulate relevant measures. At the same time, it broadens the application field of evolutionary games and supplements the research on the management mechanism of WETP-PPP during the operation period.

Social implications

Based on the evolutionary game theory, this paper introduces the supervision behavior of the public, which can provide a new perspective for researchers to conduct relevant research. Secondly, for the regulation during the operation of WETP-PPP, this paper can provide reference for the government department to establish a scientific public supervision system, improve the government supervision mechanism and other relevant measures, which can help promote the public supervision willingness, improve the regulation efficiency of the government and guide the project company to reduce speculation, so as to ensure the effect of water environment management.

Originality/value

This paper focuses on the regulation of WETP-PPP during the operation period to research interactions among the government, the project company and the public. Based on the analysis of the evolutionary game, some suggestions are put forward, such as perfecting the government regulation mechanism, optimizing the reward and punishment system for the project company and broadening the channels of public supervision. The research results of this paper can provide support for the government's regulation of WETP-PPP and ensure the project operation effect.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 January 2024

Yanhui Du, Jingfeng Yuan, ShouQing Wang, Yan Liu and Ningshuang Zeng

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation…

112

Abstract

Purpose

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation department, which negatively impacts the information quality, leading to information asymmetry and undermining the overall effectiveness of supervision. This study aims to explore how to use blockchain to anchor the information used for supervision in PPP projects to the original information, to strengthen the oversight.

Design/methodology/approach

This paper adopts the principles of design science research (DSR) to design a conceptual framework that systematically organizes information along the information dissemination chain, ensuring the reliable anchoring of original information. Two-stage interviews involving experts from academia and industry are conducted, serving as formative and summative evaluations to guide the design.

Findings

The framework establishes a weak-centralized information organizing mode, including the design of governance community and on-chain and off-chain governance mechanisms. Feedback from experts is collected via interviews and the designed framework is thought to improve information used for supervision. Constructive suggestions are also collected and analyzed for further development.

Originality/value

This paper provides a novel example exploring the inspirations blockchain can bring to project governance, like exercising caution regarding the disorderly expansion of public sector authority in addressing information disadvantages and how to leverage blockchain to achieve this. Technical details conveyed by the framework deepen understanding of how blockchain benefits and the challenges faced in successful implementation for practitioners and policymakers. The targeted evaluation serves as rigorous validation, guiding experts to provide reliable feedback and richer insights by offering them a more cognitively convenient scenario.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 October 2023

Kaone Bakokonyane and Nkobi Owen Pansiri

The purpose of this study was to examine the application of the collaborative research supervision approach (CRSA) to learning projects in higher education, using socialisation…

Abstract

Purpose

The purpose of this study was to examine the application of the collaborative research supervision approach (CRSA) to learning projects in higher education, using socialisation, externalisation, combination and internalisation (SECI) dimensions. The study, therefore, examined how these dimensions assisted learners in Botswana's higher education to generate research knowledge.

Design/methodology/approach

The study used a mixed-method research approach and exploratory research design. Purposive sampling was used to examine how the CRSA dimensions were employed in a classroom of 111 higher education learners who were carrying out research projects. Out of this population, 97 responded to a questionnaire, and 14 learners participated in a face-to-face interview. One hundred and eleven research documents produced by learners were analysed, and 42 observations were conducted.

Findings

The study found that the four dimensions of CRSA assist greatly in the development of knowledge of the research processes. This study confirms that the CRSA in higher education institutions has the potential to enhance research knowledge and skills, build learners' confidence in research, engage in learning, reduce workload, reduce the frustration of doing research and help learners complete their work in time. Learners with weak research skills easily catch up with their average-performing peers.

Research limitations/implications

It is important to recognise the methodological limitations of this study. The study used a mixed method and a single case. As a result, the results' significance cannot be justified. Additionally, the context and methodology restrict the findings' generalisability. There is obviously potential for additional cases since this article only offers a preliminary analysis of the single case issue. Consequently, the study recommends that yet another study could be conducted to check if the approach could be used for graduate learners. Another study could also be conducted to check if the approach could be used as a supervisory approach that can provide prospects for knowledge sharing and creating learning in an organisation.

Practical implications

The study discovered that when properly implemented, CRSA arrangement enhances research knowledge development and reduces the workload for both the supervisor and the student. When choosing this desired research supervision approach, either in terms of policy or in actual practice, it is important to take the potential for information exchange into account. This might result in improved research supervision efficacy in higher education and hence the production of better quality graduate learning projects.

Social implications

This study recommends the use of the CRSA in higher education, so as to help learners with weak research skills, to collaboratively work with learners with high and average research skills. It also improves the quality of supervisor–learner learning relationship.

Originality/value

The research results were given to participants and respondents for approval to find out if what was written was what they said. The research results were also given to colleagues to check whether the analysis is balanced and fair and to check biases and exaggerations.

Details

Journal of Applied Research in Higher Education, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2050-7003

Keywords

Article
Publication date: 15 December 2023

Zehui Bu, Jicai Liu and Jiaqi Liu

Emotions, understood as evolving mental states, are pivotal in shaping individuals“' decision-making, especially in ambiguous information evaluation, probability estimation of…

Abstract

Purpose

Emotions, understood as evolving mental states, are pivotal in shaping individuals“' decision-making, especially in ambiguous information evaluation, probability estimation of events, and causality analysis. Public–private partnership (PPP) projects represent a confluence of “economic–environmental–social” dimensions, wherein stakeholder behavior follows the sequential progression of “cognition–emotion–action.” Consequently, comprehending the effects of emotional shifts on stakeholder's decision-making processes is vital to fostering the sustainability of PPP projects.

Design/methodology/approach

The paper utilizes rank-dependent expected utility and evolutionary game theory to systematically examine the influence of emotional factors on stakeholders' behavior and decision-making processes within PPP projects. The paper integrates three emotional state functions—optimism, pessimism and rationality—into the PPP framework, highlighting the intricate interactions among the government, private sector, surrounding public and the media. Furthermore, the paper amalgamates the evolutionary pathways of environmental rights incidents with the media's role. Through equilibrium analysis and numerical simulation, the paper delves into the diverse interplay of emotions across different phases of the environmental rights incident, assessing the impact of these emotions on the evolutionary game's equilibrium results.

Findings

Emotions significantly influence the microlevel decisions of PPP stakeholders, adapting continually based on event dynamics and media influences. When the private sector demonstrates optimism and the surrounding public leans toward rationality or pessimism, the likelihood of the private sector engaging in speculative behavior escalates, while the surrounding public refrains from adopting a supervisory strategy. Conversely, when the private sector is pessimistic and the public is optimistic, the system fails to evolve a stable strategy. However, when government regulation intensifies, the private sector opts for a nonspeculative strategy, and the surrounding public adopts a supervisory strategy. Under these conditions, the system attains a relatively optimal state of equilibrium.

Originality/value

The paper develops a game model to examine the evolutionary dynamics between the surrounding public and private sectors concerning environmental rights protection in waste incineration PPP projects. It illuminates the nature of the conflicting interests among project participants, delves into the impact of emotional factors on their decision-making processes and offers crucial perspectives for the governance of such partnerships. Furthermore, this paper provides substantive recommendations for emotional oversight to enhance governance efficacy.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 October 2023

Xiaoli Wu, Lianying Zhang and Cailin Zhang

This research focuses on exploring a psychological mechanism between abusive supervision and job engagement via job insecurity and job alternative to understand how frontline…

Abstract

Purpose

This research focuses on exploring a psychological mechanism between abusive supervision and job engagement via job insecurity and job alternative to understand how frontline construction workers' perceived abusive supervision impacts on their work engagement.

Design/methodology/approach

This study draws on the conservation of resources theory (COR) to postulate that workers' job insecurity acts as a mediation between abusive supervision and work engagement, and the perception of job alternative moderates the impact of abusive supervision on job insecurity. This study empirically tests survey data from 357 frontline construction workers and adopts partial least square structural equation modeling (PLS-SEM) to test the proposed model.

Findings

This paper proved the dark-side of abusive supervision, dual character of job insecurity and moderating role of job alternative. The game-changing mediation effects of job insecurity were examined, which suggested that work engagement would be higher when abusive supervision stimulates stronger job insecurity. Furthermore, the result indicated that the relationship between abusive supervision and job insecurity should be weaker when job alternative is high.

Practical implications

This research suggests construction project managers (CPMs) must take steps such as enhancing supervisors' emotional management skills to control frequency of abuse and thus lessen compromising engagement. Moreover, overall understanding frontline workers' job insecurity is meaningful for better construction performance management.

Originality/value

This research contributes to the disputed leadership style (abusive supervision) and positive psychology knowledge (work engagement) in construction projects by unveiling the psychosocial mechanism (game-changing effects of job insecurity) of construction frontline workers positive engaged feeling. This study highlights the function of personal and job resources in process of resource conservation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 August 2023

Lei Cui

The construction industry has long been criticized for unethical conduct. The owner usually manages the contractor's opportunistic behaviors by employing a professional…

Abstract

Purpose

The construction industry has long been criticized for unethical conduct. The owner usually manages the contractor's opportunistic behaviors by employing a professional supervisor, but there is a risk of covert collusion between the supervisor and contractor. Based on the principal–agent theory and collusion theory, this paper aims to investigate optimal collusion-proof incentive contracts.

Design/methodology/approach

This paper presents a game-theoretic framework comprising an owner, supervisor and contractor, who interact and pursue maximized self-profits. Built upon the fixed-price incentive contract, cost-reimbursement contract, and revenue-sharing contract, different collusion-proof incentive contracts are investigated. A real project case is used to validate the developed model and derived results.

Findings

This paper shows that the presence of unethical collusion undermines the owner's interests. Especially, the possibility of agent collusion may induce the owner to abandon extracting quality information from the supervisor. Furthermore, information asymmetry significantly affects the construction contract selection, and the application conditions for different incentive contracts are provided.

Research limitations/implications

This study still has some limitations that deserve further exploration. First, this study explores contractor–supervisor collusion but ignores the possibility of the supervisor abusing authority to extort the contractor. Second, to focus on collusion, this paper ignores the supervision costs. What's the optimal supervision effort that the owner should induce the supervisor to exert? Finally, this paper assumes that the colluders involved always keep their promises. However, what if the colluders may break their promises?

Practical implications

Several collusion-proof incentive contracts are explored in a project management setting. The proposed incentive contracts can provide the project owner with effective and practical tools to inhibit covert collusion in construction management and thus safeguard construction project quality.

Originality/value

This study expands the organization collusion theory to the field of construction management and investigates the optimal collusion-proof incentive contracts. In addition, this study is the first to investigate the effects of information asymmetry on contract selection.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 May 2023

Min Cheng, Lin Liu, Xiaotong Cheng and Li Tao

Many waste-to-energy (WTE) plants are constructed and operated using the public-private partnership (PPP) mode in China. However, risk events of PPP WTE incineration projects…

Abstract

Purpose

Many waste-to-energy (WTE) plants are constructed and operated using the public-private partnership (PPP) mode in China. However, risk events of PPP WTE incineration projects sometimes occur. This study aims to clarify the relationship of risks in China's PPP WTE incineration projects and identify the key risks accordingly and risk transmission paths.

Design/methodology/approach

A risk list of PPP WTE incineration projects was obtained based on literature analysis. Moreover, a hybrid approach combining fuzzy sets, decision-making trial and evaluation laboratory (DEMATEL) and interpretive structural modeling (ISM) was developed to analyze the causality of risks, explore critical risks and reveal the risk transmission paths. The quantitative analysis process was implemented in MATLAB.

Findings

The results show that government decision-making risk, government credit risk, government supervision behavior risk, legal and policy risk, revenue and cost risk and management capacity risk are the critical risks of PPP WTE incineration projects in China. These critical risks are at different levels in the risk hierarchy and often trigger other risks.

Originality/value

Currently, there is a lack of exploration on the interaction between the risks of PPP WTE incineration projects. This study fills this gap by examining the key risks and risk transfer pathways of PPP WTE incineration projects from the perspective of risk interactions. The findings can help the public and private sectors to systematically understand the risks in PPP WTE incineration projects, thus enabling them to identify the risks that need to be focused on when making decisions and to optimize risk prevention strategies. The proposed hybrid approach can offer methodological ideas for risk analysis of other types of PPP projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 28 July 2023

Nyamagere Gladys Sospeter

The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost…

Abstract

Purpose

The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost. Accordingly, it is expected that these design documents must be of high quality to engender the attainment of the desired project objectives. The purpose of this study is to analyze the factors that affect the quality of design documentation in construction projects in the context of a developing country.

Design/methodology/approach

This study used a descriptive research design involving professionals from firms offering services in areas of design and documentation, mainly architectural, quantity surveying and engineering. A total of 80 out of 84 questionnaires were received and analyzed using IBM SPSS Statistics Version 25, and a factor analysis approach was used to categorize the factors into smaller five groups.

Findings

The factors were subsequently categorized according to size, time, staff, quality and training-related factors. Collectively, large size of the project, inadequate supervision of junior design staff, low professional fees, procurement process and system, failure to adopt quality management systems and allocation or assigning of staff to more than one project at the same time have high influence (component loading of 700) in respective groups.

Research limitations/implications

The reliance on data to analyze the factors of design documents in construction projects in developing economies context, using a Tanzanian exemplar, is considered a limitation. Developing countries with similar economic characteristics, procurement systems and cultural setup could benefit from the results of this study.

Practical implications

The study of factors affecting quality of design and documents in construction projects serves as a guide for built environment firms in Tanzania in conducting effective business and ensuring quality design documents, hence improved project performance. Understanding the nature of relationship between the design and construction teams as well as the impact of design documents on project performance is of great importance for the design teams of future projects and other decision-makers to pay attention when preparing design and related documents, especially during design stage of construction projects in developing countries.

Originality/value

The study contributes the knowledge by providing useful insights on the subject through a categorization of the factors affecting the quality of design documentation and exploring the nature of relationship between the design and construction teams in construction projects within a previously unexplored Tanzanian context focusing on a traditional procurement system for future improvement of project delivery, hence project success.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 May 2023

Ling Yan, Yichao Chen and Tingting Cao

The consulting team intervenes in the integrated construction consulting (ICC) network structure centered on “client-contractor-consultant.” Team boundary-spanning behavior (TBB…

Abstract

Purpose

The consulting team intervenes in the integrated construction consulting (ICC) network structure centered on “client-contractor-consultant.” Team boundary-spanning behavior (TBB) driven by the network structure is crucial to project performance. This article investigated how to stimulate the consulting project performance (CPP) improvement by considering the interactive effect of network structure and TBB. To be specific, this paper explored the configuration between structural characteristics of project networks, the dimension of TBB, and project performance in ICC projects.

Design/methodology/approach

Network density and centrality were used to reflect network structure. This study collected 216 valid responses from construction professionals (including project managers, department managers, and project engineers) via a questionnaire survey and analyzed the data using fsQCA.

Findings

Combining with the corresponding typical project case and analysis, the results concluded four types of configurations for achieving high performance in the ICC projects. Meanwhile, network centrality, density, ambassadorial behavior, coordination behavior, and detection behavior significantly impact high consulting project performance. Matching ICC network characteristics with the TBB is important. There are also three low performance configurations for the ICC projects. Low performance state also occurs when network centrality or density and coordination behavior is simultaneously low. Only the right match between the network characteristics and TBB can produce high consulting project performance.

Research limitations/implications

The network centrality and density, the implementation of TBB vary, and the paths to achieve high consulting project performance are different. Clients, ICC projects, and consulting teams should choose the appropriate development paths according to the actual situation. (1) Clients should commit to applying the ICC project model with high network centrality, density, and coordination behavior of ICC enterprises to promote project performance. (2) Consulting enterprises should carry out ICC business based on detecting behavior and coordinating behavior. (3) The market should cultivate head consulting enterprises with independence and integration, and bring into play the effectiveness of consulting team ambassadorial behavior.

Practical implications

Comparing the results of the four high CPP configurations, the network structure characteristics are essential, which means that in the Chinese consulting practice between the owner and the consulting firm pay attention to the use of appropriate ICC organizational structure model and arrange the degree of centralization of authorized responsibilities. Coordination behavior is necessary to achieve high CPP. Therefore, Chinese consulting firms should pay attention to effective communication and exchange with project contractors in order to get high CPP in conducting business; meanwhile, enabling behavior can achieve high CPP both in the presence and absence of configuration H1 and H4, which indicates that enabling behavior has substitution effect. Comparing the three low CPP configurations also contrarily confirms the indispensability of coordinating behavior. Comparing the results of high and low CPP configurations, the TBB is seriously missing and not properly applied in CPP enhancement. In detail, Chinese consulting firms have been regarded as independent third parties providing services, and less attention has been paid to the TBB of Chinese consulting firms in past practice, thus leading to the dilemma of inadequate empowerment of consulting firms due to their unclear status. To solve this dilemma, the findings of this paper offer a solution at the micro level to change the previous perception of consulting and demonstrate that Chinese consulting practice needs to pay attention to TBB with owners and contractors, and apply it well to enhance the reputation, management consulting level and capability, and experience and expertise of consulting firms to achieve high CPP.

Originality/value

The research results changed from the previous bilateral project governance to a new perspective of network embedding. It provided a theoretical basis for the improvement path of high consulting project performance, as well as providing ideas for clients on the organizational design of ICC projects. On the other hand, it provided a practical reference for TBB positioning of ICC enterprises for transformation and upgrading development.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Year

Last 12 months (825)

Content type

Earlycite article (825)
1 – 10 of 825