Article
Publication date: 24 January 2022

Samin Mahdavian, Ming Lu and Estacio Pereira

Previous research regarding shaping factors and major causes behind accidents in the construction field is reviewed. In particular, a hypothetical model is established to…

Abstract

Purpose

Previous research regarding shaping factors and major causes behind accidents in the construction field is reviewed. In particular, a hypothetical model is established to correlate activity time, cost and safety in the context of construction activity acceleration planning. Two demonstration cases are presented to illustrate the proposed theoretical model in the context of critical activity expedition planning. Further, a third case uses a 100-activity project to perform the global level total project time and cost analysis, identifying specific activity acceleration plans that would materialize the shortened total project time at the lowest total project cost.

Design/methodology/approach

This research proposes a safety-centric application framework to guide construction acceleration planning at both activity and project levels while taking sufficient preventive measures against safety hazards and accidents. As planning construction acceleration by factoring in safety constraints inevitably drives up cost, it is imperative to control increases in activity costs at the local level in connection with schedule acceleration planning while at the same time not compromising on safety. This research also addresses this critical question through performing global level total project time and cost analysis.

Findings

An application framework is proposed for guiding a planner through identifying accident shaping factors, obeying schedule acceleration rules and accounting for safety-related costs in attempts to mitigate hazardous situations on-site at both activity level (local) and project level (global), resulting in (1) minimizing the increase of total project cost in schedule acceleration while at the same time not compromising on safety at individual activities; (2) producing specific execution plans on each individual activity in terms of the amount of time to crash and the associated activity cost.

Originality/value

This study is original in developing theories and methods for evaluating the impact of safety constraints upon construction time and cost in activity acceleration planning and project time-cost analysis. The research fills a gap in knowledge in terms of how to factor in sufficient safety constraints while achieving project time and cost objectives on construction acceleration planning at both activity and project levels.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 November 2023

Ho Soon Choi

This study defines and critically analyzes Korean high modernism using the Sewoon Sangga project as a case study, as it has significant value in Korea's urban and architectural…

106

Abstract

Purpose

This study defines and critically analyzes Korean high modernism using the Sewoon Sangga project as a case study, as it has significant value in Korea's urban and architectural history.

Design/methodology/approach

The methodology applied for this study was a theory-interpretive analysis. This study examines the modernization process of Seoul based on the concept of “high modernism,” in that the theory-interpretive analysis method analyzes historical phenomena centered on a specific concept.

Findings

As a form of national belief, the various ideas that give birth to modern cities are defined as “high modernism.” As a Korean megastructure, the Sewoon Sangga project is significant in the history of Korean urbanism and architecture because it is the archetype of Korean high modernism and is representative of South Korea's compressed economic growth. However, soon-to-be-demolished Sewoon Sangga signifies the failure of Korean high modernism. This study identified the critical characteristics of Korean high modernism through the Sewoon Sangga project.

Originality/value

This study analyzed a representative Asian city through the specific concept of high modernism. It transpired that high modernism, which played an important role in the birth and development of modern cities, should be transformed for future cities and architectural development. This study has significance in that it expands the study of the history of urbanism and architecture centered on the West to the same in Asia.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 4 October 2022

Ali Rashidi, Wei Yin Yong, Duncan Maxwell and Yihai Fang

The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how…

Abstract

Purpose

The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how construction practitioners perceive technology integration in construction planning in light of emerging technologies. This study intended to uncover unique experimental findings by integrating 4D-building information modelling (BIM) to virtual reality (VR) technology during construction planning among construction professionals at light steel framing (LSF) projects.

Design/methodology/approach

The building industry participants were invited to provide inputs on two different construction planning methods: conventional and innovative methods. The conventional method involved the participants using traditional platforms such as 2D computer-aided design (CAD) and physical visualisation of paper-based construction drawings for the LSF assembly process with a Gantt Chart tool to complete construction planning-related tasks for the targeted project. Comparatively, participants are required to perform the same tasks using more innovative platforms like 4D-BIM in a VR environment.

Findings

A Charrette Test Method was used to validate the findings, highlighting an improvement in usability (+10.3%), accuracy (+89.1%) and speed (+30%) using 4D BIM with VR compared to the conventional paper-based method. The findings are also validated by a paired t-test, which is supported by the rationality of the same findings. This study posits positive results for construction planning through the utilisation of modern practices and technologies. These findings are significant for the global construction industry facing low productivity issues, delays and certainty in terms of building delivery timelines due to poor construction planning.

Originality/value

This new blend of technologies—combining 4D BIM and VR in industrialised construction projects—potentially directs future initiatives to drive the efficiency of construction planning in the building lifecycle. The interactive BIM-based virtual environment would purposefully transform construction planning practices in order to deliver modern and more certain building construction methods with a focus on prefabrication processes.

Article
Publication date: 16 June 2023

Xia Shu, Stewart Smyth and Jim Haslam

The authors explore the under-researched area of post-decision evaluation in PPPs (public–private partnerships), focusing upon how and whether Post-decision Project Evaluation…

Abstract

Purpose

The authors explore the under-researched area of post-decision evaluation in PPPs (public–private partnerships), focusing upon how and whether Post-decision Project Evaluation (PdPE) is considered and provided for in United Kingdom (UK) public infrastructure projects.

Design/methodology/approach

The authors’ research design sought insights from overviewing UK PPP planning and more focused exploration of PPP operational practice. The authors combine the extensive analysis of planning documents for operational UK PPP projects with interviews of different stakeholders in PPP projects in one city. Mobilising an open critical perspective, documents were analysed using ethnographic content analysis (ECA) and interviews were analysed using thematic analysis consistent therewith. The authors theorise the absence and ambiguities of PdPE drawing on the sociology of ignorance.

Findings

The authors find a long-standing absence and lack of PdPE in PPP projects throughout planning and operational practice, reflecting a dynamic, multi-faceted ignorance. Concerning planning practice, the authors’ documentary analysis evidences a trend in PdPE from its absence in the early years (which may indicate some natural or genuine ignorance) to different levels or forms of weak inclusion later. Regarding this inclusion, the authors find strategic ignorance played a substantive role, involving “deliberate engineering” by both public sector and private partners. Interview findings indicate lack of clarity over PdPE and its under-development in PPP practice, deficiencies again suggestive of natural and strategic ignorance.

Originality/value

The authors draw from the sociology of ignorance vis-à-vis accounting's absence and ambiguity in the context of PPP, contributing to an under-researched area.

Details

Accounting, Auditing & Accountability Journal, vol. 37 no. 1
Type: Research Article
ISSN: 0951-3574

Keywords

Article
Publication date: 6 February 2024

Moslem Sheikhkhoshkar, Hind Bril El Haouzi, Alexis Aubry and Farook Hamzeh

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control…

Abstract

Purpose

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control metrics have been devised and put into practice, often with little emphasis on analyzing their underlying concepts. To cover this gap, this research aims to identify and analyze a holistic list of control metrics and their functionalities in the construction industry.

Design/methodology/approach

A multi-step analytical approach was conducted to achieve the study’s objectives. First, a holistic list of control metrics and their functionalities in the construction industry was identified. Second, a quantitative analysis based on social network analysis (SNA) was implemented to discover the most important functionalities.

Findings

The results revealed that the most important control metrics' functionalities (CMF) could differ depending on the type of metrics (lagging and leading) and levels of control. However, in general, the most significant functionalities include managing project progress and performance, evaluating the look-ahead level’s performance, measuring the reliability and stability of workflow, measuring the make-ready process, constraint management and measuring the quality of construction flow.

Originality/value

This research will assist the project team in getting a comprehensive sensemaking of planning and control systems and their functionalities to plan and control different dynamic aspects of the project.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 2 January 2024

Emma Mihocic, Koorosh Gharehbaghi, Per Hilletofth, Kong Fah Tee and Matt Myers

In successfully meeting city and metropolitan growth, sustainable development is compulsory. Sustainability is a must-focus for any project, particularly for large and mega rail…

Abstract

Purpose

In successfully meeting city and metropolitan growth, sustainable development is compulsory. Sustainability is a must-focus for any project, particularly for large and mega rail infrastructure. This paper aims to investigate to what degree social, environmental and economic factors influence the government when planning sustainable rail infrastructure projects. To respond to such a matter, this paper focuses on two Australian mega-rail projects: the South West Rail Link (SWRL) and the Mernda Rail Extension (MRE).

Design/methodology/approach

As the basis of an experimental evaluation framework strengths, weaknesses, opportunities and threats (SWOT) and factor analysis were used. These two methods were specifically selected as comparative tools for SWRL and SWRL projects, to measure their overall sustainability effect.

Findings

Using factor analysis, in the MRE, the factors of network capacity, accessibility, employment and urban planning were seen frequently throughout the case study. However, politics and economic growth had lower frequencies throughout this case study. This difference between the high-weighted factors is likely a key element that determined the SWRL to be more sustainable than the MRE. The SWOT analysis showed the strengths the MRE had over the SWRL such as resource use and waste management, and natural habitat preservation. These two analyses have shown that overall, calculating the sustainability levels of a project can be subjective, based on the conditions surrounding various analysis techniques.

Originality/value

This paper first introduces SWRL and MRE projects followed by a discussion about their overall sustainable development. Both projects go beyond the traditional megaprojects' goal of improving economic growth by developing and enhancing infrastructure. Globally, for such projects, sustainability measures are now considered alongside the goal of economic growth. Second, SWOT and factor analysis are undertaken to further evaluate the complexity of such projects. This includes their overall sustainable development vision alignment with environmental, economic and social factors.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 July 2022

Daniele Binci, Corrado Cerruti, Giorgia Masili and Cristina Paternoster

The purpose of this study is to explore the agile project management (APM) approach through the contextual ambidextrous lens by overcoming the traditional perspective that…

1979

Abstract

Purpose

The purpose of this study is to explore the agile project management (APM) approach through the contextual ambidextrous lens by overcoming the traditional perspective that separates projects within the opposite planned-exploitation- and emergent-exploration-oriented forms.

Design/methodology/approach

This study uses a grounded approach to five different agile-oriented companies for discovering how agile adoption shows both emergent (exploration-oriented) and planned (exploitation-oriented) tensions in a perspective that connects, rather than separates, them.

Findings

This study discovers five main categories, namely, approach, objectives, boundaries, leadership and feedback, that capture the tensions between planned and emergent issues of agile projects. The identified variables interact with different intervening conditions of the APM attributes (i.e. road map, product backlog, team backlog and solution delivery), activating different response actions (“exploitation embedded in exploration” and vice-versa), requiring, as a consequence, the need for contextual ambidexterity.

Research limitations/implications

This study identifies different implications based on real project contexts, as the importance of a more complete picture of the APM approach, which also considers the combination of planned and emergent aspects of projects and, as consequence, the needs for dual capacities (T-shaped skills) both at project management and team levels.

Practical implications

This study identifies, in real project contexts, the relevance of integration between the corporate level and the agile project team. This implies the search for constant dialogue, with feedback exchange spread across all levels, also enabled by an integrated leadership approach.

Originality/value

This study highlights agile tensions in a real-world project context by describing how APM connects both explorative and exploitative aspects of change within the same APM initiative, in order to manage such tensions, which differs from previous studies that consider APM in alternation with a linear project management approach as stage-gate.

Details

The TQM Journal, vol. 35 no. 5
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 1 August 2023

Method Julius Gwaleba, Sophia Marcian Kongela and Wilbard Jackson Kombe

This paper aims to explore the role of participatory governance to actors’ participation in land use planning for tenure security in rural Tanzania. Three case studies where land…

Abstract

Purpose

This paper aims to explore the role of participatory governance to actors’ participation in land use planning for tenure security in rural Tanzania. Three case studies where land use planning project implemented were selected to make assessment on how local actors were involved in the process.

Design/methodology/approach

This paper uses qualitative research methods, whereby semi-structured interviews with village landholders and key informants were conducted to get their perspectives on land use decisions and land tenure (in)security. Besides, focus group discussions with the village landholders were also used.

Findings

The research findings indicate low participation of local actors in land use planning process. Decisions on land use by the local actors were very minimal. Further, communication between the involved actors was also difficult.

Originality/value

The study offers insights on participatory governance into land use planning for tenure security. The study develops a framework to improve land use planning process toward tenure security outcome. A tri-partite strategy consisting of enabling mechanisms of governance capacity, institutional capacity and converging discourses articulates a framework for the evolution in the degree of local actors’ participation to improve security of land rights through land use planning process in rural Tanzania.

Details

Journal of Property, Planning and Environmental Law, vol. 15 no. 3
Type: Research Article
ISSN: 2514-9407

Keywords

Article
Publication date: 9 February 2022

Farzaneh Moshtaghian and Esmatullah Noorzai

This research has been conducted with a view to creating a framework to integrate risk management based on building information modeling (BIM) information.

Abstract

Purpose

This research has been conducted with a view to creating a framework to integrate risk management based on building information modeling (BIM) information.

Design/methodology/approach

In this research, all the information related to the construction of a residential project including 3D, 4D and 5D BIM models and the execution and control phases information was collected, and the risk list was determined for each activity accordingly.

Findings

The present study has suggested a framework for risk management in order to optimize project changes.

Originality/value

The lack of integration between 3D, 4D and 5D modeling besides execution information is a fundamental problem in many projects. The gap between these two groups of information will lead to improper management and late decisions, eventually imposing unforeseen delays and cost overruns. Risk management by the means of adopting a new approach has been addressed in recent studies using new methods, such as BIM and its associated technologies, some of which were mentioned in the review of theoretical literature in this research.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988