Search results

1 – 10 of 54
Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79381

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 28 February 2022

Duncan Maxwell and Rachel Couper

Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital…

1895

Abstract

Purpose

Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital transformation of construction, new solutions are being investigated that can provide consistent data between changing projects. One such source of data manifests in the tracking of logistics activities across the supply chain. Construction logistics is traditionally considered a site management activity focused solely on the “back end” of projects, but an expanded logistics focus can unlock new avenues of improvement. This study aims to understand the requirements and benefits of such a consistent thread of data.

Design/methodology/approach

From a research project with one of Australia’s largest contracting companies, this paper details a series of construction tracking tests as an empirical case study in using Bluetooth low energy aware tracking technology to capture data across the manufacture, delivery and assembly of a cross-laminated timber structural prototyping project.

Findings

The findings affirm the tracking of expanded logistics data can improve back-end performance in subsequent projects while also demonstrating the opportunity to inform a project’s unique front-end design phase. The case study demonstrates that as the reliability, range and battery life of tracking technologies improve, their incorporation into a broader range of construction activities provides invaluable data for improvement across projects.

Originality/value

As a live case study, this research offers unique insights into the potential of construction tracking to close the data loop from final site assembly back to the early project design phase, thus driving continual improvement from a holistic perspective.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Content available
Article
Publication date: 20 March 2023

Abdulkabir Opeyemi Bello, Doris Omonogwu Eje, Abdullahi Idris, Mudasiru Abiodun Semiu and Ayaz Ahmad Khan

The growing demand for housing and infrastructure, as well as the requirement for affordable housing, has been a significant factor, necessitating investigation for sustainable…

Abstract

Purpose

The growing demand for housing and infrastructure, as well as the requirement for affordable housing, has been a significant factor, necessitating investigation for sustainable approaches and implementation of alternative construction innovations. Hence, this study aims to identify and assess the drivers for implementing modular construction systems (MCS) in developing countries.

Design/methodology/approach

The study adopts a quantitative research approach to seek respondents’ opinions on the factors that can drive the implementation of MCS in developing countries. Accordingly, a structured questionnaire was used as an instrument of data collection based on five Likert scales. The data was analysed using the mean score, one sample t-test, Kruskal–Wallis, factor analysis (FA) and Pearson correlation analysis.

Findings

Results show that 15 of the 16 major identified drivers were statistically significant towards implementing MCS, which indicates that the drivers are crucial for implementing MCS in developing countries. However, the Kruskal–Wallis test reveals that the respondents have varying opinions on the identified drivers. FA categorised the drivers into four categories, namely, “management and sustainability”, “key performance”, “know-how and logistics” and “regulations and policies”. A strong relationship among the four categories of drivers was established using Pearson correlation, which indicated that all the drivers’ categories are essential for implementing MCS in developing countries.

Originality/value

This study identified and assessed the drivers towards implementing MCS in developing countries. The study concludes that the identified drivers are essential for implementing MCS in developing countries. Also, the study considers the government the most placed player in driving the implementation of MCS in developing countries.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Content available
Book part
Publication date: 13 September 2018

Abstract

Details

Unmaking Waste in Production and Consumption: Towards the Circular Economy
Type: Book
ISBN: 978-1-78714-620-4

Content available
Article
Publication date: 26 October 2021

Carlos T. Formoso and Rafael Sacks

315

Abstract

Details

Engineering, Construction and Architectural Management, vol. 28 no. 8
Type: Research Article
ISSN: 0969-9988

Content available
Article
Publication date: 30 December 2020

Mohammed Arif, Jack Goulding, Jeff Rankin and Farzad Pour Rahimian

461

Abstract

Details

Construction Innovation , vol. 21 no. 1
Type: Research Article
ISSN: 1471-4175

Open Access
Article
Publication date: 2 September 2021

Martin Lennartsson, Samuel André and Fredrik Elgh

The purpose of this research is to support the customization ability for industrial house building companies striving to offer individualized products but with a strategy which…

1491

Abstract

Purpose

The purpose of this research is to support the customization ability for industrial house building companies striving to offer individualized products but with a strategy which includes a production facility. This is accomplished by analyzing the as-is state in terms of existing engineering assets and by proposing a to-be state using the design platform and product lifecycle management (PLM) support.

Design/methodology/approach

This study is based on design research methodology and collected data are in-depth interviews, document reviews and workshops and method development. The theoretical baseline is product platforms and the design platform.

Findings

The analysis showed that despite use of a platform, inherent assets are disorganized. Still, the identified object-based engineering assets were possible to include in a conceptual proposal for better management, both in the process and product view, using an asset relationship matrix and a PLM system.

Practical implications

The results should be applicable for industrial house building and off-site construction companies and offers an approach to identify and manage their assets and platforms which are crucial to stay competitive.

Originality/value

Previous research on design platforms has focused on engineer-to-order companies within the mechanical industry. The contribution of this paper lies in the application and support of the design platform for industrial house building and the introduction of PLM system support.

Open Access
Article
Publication date: 29 March 2021

Rita Lavikka, Krishna Chauhan, Antti Peltokorpi and Olli Seppänen

Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among…

2310

Abstract

Purpose

Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among multiple organisations in successful innovation implementation. This paper aims to understand the role of value creation and value capture in the implementation of systemic innovations in construction which is by nature, an inter-organisational context.

Design/methodology/approach

The empirical research focused on the barriers, enablers and opportunities for value creation and value capture of the Finnish construction project parties when trying to implement mechanical, electrical and plumbing (MEP) prefabrication, which is a systemic innovation. Data were collected through interviews, observations and action workshops.

Findings

The empirical study identified interaction patterns on how social, political, technical and economic barriers lead to uneven value capturing, lack of value-based procurement and unclear value creation between MEP design and installation. They hinder the implementation of MEP prefabrication. The results point to enablers leading to fairly shared value to all parties, procurement of value and collaborative value creation, thus increasing the usage of MEP prefabrication, a systemic innovation.

Originality/value

The study adds new knowledge by demonstrating that the identification of barriers and their interaction with enablers and opportunities for value creation and capture lay a baseline for suggestions on how to implement a systemic innovation. This study stresses the importance of enabling value creation and capture for all construction project parties when implementing a systemic innovation.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 16 March 2021

Hongjuan Wu, Queena K. Qian, Ad Straub and Henk J. Visscher

The recent promotion of prefabricated housing (PH) in China has resulted in a prosperous period for its implementation. However, transaction costs (TCs) cause low economic…

2014

Abstract

Purpose

The recent promotion of prefabricated housing (PH) in China has resulted in a prosperous period for its implementation. However, transaction costs (TCs) cause low economic efficiency to stakeholders and hinder the further promotion of PH. No relevant study has yet been made to investigate the TCs and their causes in the PH field. This paper identifies critical TCs and explores the influencing factors from the developers' perspective.

Design/methodology/approach

Semi-structured interviews and a questionnaire survey were used to collect data about TCs and influencing factors. The most influential factors are identified with their impacts on particular TCs, yielded from correlation analysis and logistic regression.

Findings

From the developers' perspective in China's PH market, this study identified that the most concerning sources of TCs are: hidden costs arising from disputes, extra workloads from design changes, learning costs, intensive communication and coordination in assembly and unexpected information costs in decision-making. The use of an ordered logistic regression approach indicates that the four most influential factors are: qualification of the general contractor, mandatory local policies, owner type and competitiveness of the developer.

Practical implications

To reduce the TCs, experiencing learning and ensuring the design scheme's complicity are recommended to save information searching and exchanging costs. The implications for the PH developers are for them to: (1) professionalize their own organization and (2) procure high-qualified general contractors. For the policymakers, this means they should improve the clarity of the mandatory local policies for PH step-by-step.

Originality/value

By applying the TCs economic theory, this study explores factors that influence TCs in the PH industry. It sheds light on the influencing mechanism behind the TCs in the context of prefabricated housing.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article