Open Access
Article
Publication date: 5 August 2020

Francesco Pomponi, Robert Crawford, André Stephan, Jim Hart and Bernardino D'Amico

The construction and operation of buildings is a major contributor to global energy demand, greenhouse gases emissions, resource depletion, waste generation, and associated…

Abstract

The construction and operation of buildings is a major contributor to global energy demand, greenhouse gases emissions, resource depletion, waste generation, and associated environmental effects, such as climate change, pollution and habitat destruction. Despite its wide relevance, research on building-related environmental effects often fails to achieve global visibility and attention, particularly in premiere interdisciplinary journals – thus representing a major gap in the research these journals offer. In this article we review and reflect on the factors that are likely causing this lack of visibility for such a prominent research topic and emphasise the need to reconcile the construction and operational phases into the physical unity of a building, to contribute to the global environmental discourse using a lifecycle-based approach. This article also aims to act as a call for action and to raise awareness of this important gap. The evidence contained in the article can support institutional policies to improve the status quo and provide a practical help to researchers in the field to bring their work to wide interdisciplinary audiences.

Details

Emerald Open Research, vol. 1 no. 5
Type: Research Article
ISSN: 2631-3952

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

80208

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 28 February 2022

Duncan Maxwell and Rachel Couper

Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital…

2103

Abstract

Purpose

Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital transformation of construction, new solutions are being investigated that can provide consistent data between changing projects. One such source of data manifests in the tracking of logistics activities across the supply chain. Construction logistics is traditionally considered a site management activity focused solely on the “back end” of projects, but an expanded logistics focus can unlock new avenues of improvement. This study aims to understand the requirements and benefits of such a consistent thread of data.

Design/methodology/approach

From a research project with one of Australia’s largest contracting companies, this paper details a series of construction tracking tests as an empirical case study in using Bluetooth low energy aware tracking technology to capture data across the manufacture, delivery and assembly of a cross-laminated timber structural prototyping project.

Findings

The findings affirm the tracking of expanded logistics data can improve back-end performance in subsequent projects while also demonstrating the opportunity to inform a project’s unique front-end design phase. The case study demonstrates that as the reliability, range and battery life of tracking technologies improve, their incorporation into a broader range of construction activities provides invaluable data for improvement across projects.

Originality/value

As a live case study, this research offers unique insights into the potential of construction tracking to close the data loop from final site assembly back to the early project design phase, thus driving continual improvement from a holistic perspective.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Content available
Article
Publication date: 16 January 2009

Dr Mohammed Arif

491

Abstract

Details

Construction Innovation, vol. 9 no. 1
Type: Research Article
ISSN: 1471-4175

Content available
Article
Publication date: 30 December 2020

Mohammed Arif, Jack Goulding, Jeff Rankin and Farzad Pour Rahimian

492

Abstract

Details

Construction Innovation , vol. 21 no. 1
Type: Research Article
ISSN: 1471-4175

Content available
Article
Publication date: 24 February 2012

Ronald McCaffer

306

Abstract

Details

Engineering, Construction and Architectural Management, vol. 19 no. 2
Type: Research Article
ISSN: 0969-9988

Content available
Article
Publication date: 1 May 2006

163

Abstract

Details

Structural Survey, vol. 24 no. 3
Type: Research Article
ISSN: 0263-080X

Keywords

Content available
Article
Publication date: 24 August 2012

234

Abstract

Details

Structural Survey, vol. 30 no. 4
Type: Research Article
ISSN: 0263-080X

Content available
Article
Publication date: 1 June 2004

114

Abstract

Details

International Journal of Productivity and Performance Management, vol. 53 no. 4
Type: Research Article
ISSN: 1741-0401

1 – 10 of 94