Search results

1 – 10 of over 1000
Open Access
Article
Publication date: 28 May 2019

Olanrewaju Ayobami Omoya, Kassandra A. Papadopoulou and Eric Lou

The purpose of this paper is to investigate the application of reliability engineering to oil and gas (O&G) pipeline systems with the aim of identifying means through which…

3336

Abstract

Purpose

The purpose of this paper is to investigate the application of reliability engineering to oil and gas (O&G) pipeline systems with the aim of identifying means through which reliability engineering can be used to improve pipeline integrity, specifically with regard to man-made incidents (e.g. material/weld/equipment failure, corrosion, incorrect operation and excavation damages).

Design/methodology/approach

A literature review was carried out on the application of reliability tools to O&G pipeline systems and four case studies are presented as examples of how reliability engineering can help to improve pipeline integrity. The scope of the paper is narrowed to four stages of the pipeline life cycle; the decommissioning stage is not part of this research. A survey was also carried out using a questionnaire to check the level of application of reliability tools in the O&G industry.

Findings

Data from survey and literature show that a reliability-centred approach can be applied and will improve pipeline reliability where applied; however, there are several hindrances to the effective application of reliability tools, the current methods are time based and focus mainly on design against failure rather than design for reliability.

Research limitations/implications

The tools identified do not cover the decommissioning of the pipeline system. Research validation sample size can be broadened to include more pipeline stakeholders/professionals. Pipeline integrity management systems are proprietary information and permission is required from stakeholders to do a detailed practical study.

Originality/value

This paper proposes the minimum applied reliability tools for application during the design, operation and maintenance phases targeted at the O&G industry. Critically, this paper provides a case for an integrated approach to applying reliability and maintenance tools that are required to reduce pipeline failure incidents in the O&G industry.

Details

International Journal of Quality & Reliability Management, vol. 36 no. 9
Type: Research Article
ISSN: 0265-671X

Keywords

Open Access
Article
Publication date: 4 July 2020

Camilla Lundgren, Jon Bokrantz and Anders Skoogh

The purpose of this study is to ensure productive, robust and sustainable production systems and realise digitalised manufacturing trough implementation of Smart Maintenance – “an…

5631

Abstract

Purpose

The purpose of this study is to ensure productive, robust and sustainable production systems and realise digitalised manufacturing trough implementation of Smart Maintenance – “an organizational design for managing maintenance of manufacturing plants in environments with pervasive digital technologies”. This paper aims to support industry practitioners in selecting performance indicators (PIs) to measure the effects of Smart Maintenance, and thus facilitate its implementation.

Design/methodology/approach

Intercoder reliability and negotiated agreement were used to analyse 170 maintenance PIs. The PIs were structurally categorised according to the anticipated effects of Smart Maintenance.

Findings

Companies need to revise their set of PIs when changing manufacturing and/or maintenance strategy (e.g. reshape the maintenance organisation towards Smart Maintenance). This paper suggests 13 categories of PIs to facilitate the selection of PIs for Smart Maintenance. The categories are based on 170 PIs, which were analysed according to the anticipated effects of Smart Maintenance.

Practical implications

The 13 suggested categories bring clarity to the measuring potential of the PIs and their relation to the Smart Maintenance concept. Thereby, this paper serves as a guide for industry practitioners to select PIs for measuring the effects of Smart Maintenance.

Originality/value

This is the first study evaluating how maintenance PIs measure the anticipated effects of maintenance in digitalised manufacturing. The methods intercoder reliability and negotiated agreement were used to ensure the trustworthiness of the categorisation of PIs. Such methods are rare in maintenance research.

Details

International Journal of Productivity and Performance Management, vol. 70 no. 6
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 2 December 2020

Zhe Zhang, Limin Jia and Yong Qin

This paper aims to investigate the reliability, availability, maintenance and safety analysis method for railway network operation.

1773

Abstract

Purpose

This paper aims to investigate the reliability, availability, maintenance and safety analysis method for railway network operation.

Design/methodology/approach

The reliability of the railway network is proposed based on the accident frequency and the topology of the railway network. Network efficiency and capacity are proposed to evaluate the availability of the railway network. The maintenance of the railway network is analyzed from the perspective of accident recovery time. The safety index of the railway network is proposed to measure the safety of railway stations and sections and the K-means method is proposed to find the safety critical stations and sections. Finally, the effectiveness of the proposed method is illustrated through a real-world case study.

Findings

The case study shows that the proposed model can produce a big-picture averaged view of the network-wide safety level and help us identify the safety critical stations and sections by considering both the expected reduction of network efficiency and capacity.

Practical implications

The potential application of the proposed model is to help the safety managers determine the investments in safety management of each section and station and then increase the safety and robustness of railway network operation.

Originality/value

The safety analysis of the railway network should consider the reliability, availability and maintenance of the railway network. In this paper, the reliability of the railway network is proposed based on the accident frequency and the topology of the railway network. Network efficiency and capacity are proposed to evaluate the availability of the railway network. The maintenance of the railway network is analyzed from the perspective of recovery time. Finally, the safety index of the railway network is proposed to analyze the safety critical stations and sections.

Details

Smart and Resilient Transportation, vol. 3 no. 1
Type: Research Article
ISSN: 2632-0487

Keywords

Open Access
Article
Publication date: 15 March 2022

Jingrui Ge, Kristoffer Vandrup Sigsgaard, Julie Krogh Agergaard, Niels Henrik Mortensen, Waqas Khalid and Kasper Barslund Hansen

This paper proposes a heuristic, data-driven approach to the rapid performance evaluation of periodic maintenance on complex production plants. Through grouping, maintenance

1446

Abstract

Purpose

This paper proposes a heuristic, data-driven approach to the rapid performance evaluation of periodic maintenance on complex production plants. Through grouping, maintenance interval (MI)-based evaluation and performance assessment, potential nonvalue-adding maintenance elements can be identified in the current maintenance structure. The framework reduces management complexity and supports the decision-making process for further maintenance improvement.

Design/methodology/approach

The evaluation framework follows a prescriptive research approach. The framework is structured in three steps, which are further illustrated in the case study. The case study utilizes real-life data to verify the feasibility and effectiveness of the proposed framework.

Findings

Through a case study conducted on 9,538 pieces of equipment from eight offshore oil and gas production platforms, the results show considerable potential for maintenance performance improvement, including up to a 23% reduction in periodic maintenance hours.

Research limitations/implications

The problem of performance evaluation under limited data availability has barely been addressed in the literature on the plant level. The proposed framework aims to provide a quantitative approach to reducing the structural complexity of the periodic maintenance evaluation process and can help maintenance professionals prioritize the focus on maintenance improvement among current strategies.

Originality/value

The proposed framework is especially suitable for initial performance assessment in systems with a complex structure, limited maintenance records and imperfect data, as it reduces management complexity and supports the decision-making process for further maintenance improvement. A similar application has not been identified in the literature.

Details

International Journal of Quality & Reliability Management, vol. 40 no. 3
Type: Research Article
ISSN: 0265-671X

Keywords

Open Access
Article
Publication date: 9 April 2018

Maheshwaran Gopalakrishnan and Anders Skoogh

The purpose of this paper is to identify the productivity improvement potentials from maintenance planning practices in manufacturing companies. In particular, the paper aims at…

5866

Abstract

Purpose

The purpose of this paper is to identify the productivity improvement potentials from maintenance planning practices in manufacturing companies. In particular, the paper aims at understanding the connection between machine criticality assessment and maintenance prioritization in industrial practice, as well as providing the improvement potentials.

Design/methodology/approach

An explanatory mixed method research design was used in this study. Data from literature analysis, a web-based questionnaire survey, and semi-structured interviews were gathered and triangulated. Additionally, simulation experimentation was used to evaluate the productivity potential.

Findings

The connection between machine criticality and maintenance prioritization is assessed in an industrial set-up. The empirical findings show that maintenance prioritization is not based on machine criticality, as criticality assessment is non-factual, static, and lacks system view. It is with respect to these finding that the ways to increase system productivity and future directions are charted.

Originality/value

In addition to the empirical results showing productivity improvement potentials, the paper emphasizes on the need for a systems view for solving maintenance problems, i.e. solving maintenance problems for the whole factory. This contribution is equally important for both industry and academics, as the maintenance organization needs to solve this problem with the help of the right decision support.

Details

International Journal of Productivity and Performance Management, vol. 67 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 23 July 2020

Tiedo Tinga, Flip Wubben, Wieger Tiddens, Hans Wortmann and Gerard Gaalman

For many decades, it has been recognized that maintenance activities should be adapted to the specific usage of a system. For that reason, many advanced policies have been…

3426

Abstract

Purpose

For many decades, it has been recognized that maintenance activities should be adapted to the specific usage of a system. For that reason, many advanced policies have been developed, such as condition-based and load-based maintenance policies. However, these policies require advanced monitoring techniques and rather detailed understanding of the failure behavior, which requires the support of an OEM or expert, prohibiting application by an operator in many cases. The present work proposes a maintenance policy that relieves the high (technical) demands set by these existing policies and provides a more accurate specification of the required (dynamic) maintenance interval than traditional usage-based maintenance.

Design/methodology/approach

The methodology followed starts with a review and critical assessment of existing maintenance policies, which are classified according to six different aspects. Based on the need for a technically less demanding policy that appears from this comparison, a new policy is developed. The consecutive steps required for this functional usage profiles based maintenance policy are then critically discussed: usage profile definition, monitoring, profile severity quantification and the possible extension to the fleet level. After the description of the proposed policy, it is demonstrated in three case studies on real systems.

Findings

A maintenance policy based on a simple usage registration procedure appears to be feasible, which enables a significantly more efficient maintenance process than the traditional usage-based policies. This is demonstrated by the policy proposed here.

Practical implications

The proposed maintenance policy based on functional usage profiles offers the operators of fleets of systems the opportunity to increase the efficiency and effectiveness of their maintenance process, without the need for a high investment in advanced monitoring systems and in experts interpreting the results.

Originality/value

The original contribution of this work is the explicit definition of a new maintenance policy, which combines the benefits of considering the effects of usage or environment severity with a limited investment in monitoring technology.

Details

Journal of Quality in Maintenance Engineering, vol. 27 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 31 July 2023

Jingrui Ge, Kristoffer Vandrup Sigsgaard, Bjørn Sørskot Andersen, Niels Henrik Mortensen, Julie Krogh Agergaard and Kasper Barslund Hansen

This paper proposes a progressive, multi-level framework for diagnosing maintenance performance: rapid performance health checks of key performance for different equipment groups…

1123

Abstract

Purpose

This paper proposes a progressive, multi-level framework for diagnosing maintenance performance: rapid performance health checks of key performance for different equipment groups and end-to-end process diagnostics to further locate potential performance issues. A question-based performance evaluation approach is introduced to support the selection and derivation of case-specific indicators based on diagnostic aspects.

Design/methodology/approach

The case research method is used to develop the proposed framework. The generic parts of the framework are built on existing maintenance performance measurement theories through a literature review. In the case study, empirical maintenance data of 196 emergency shutdown valves (ESDVs) are collected over a two-year period to support the development and validation of the proposed approach.

Findings

To improve processes, companies need a separate performance measurement structure. This paper suggests a hierarchical model in four layers (objective, domain, aspect and performance measurement) to facilitate the selection and derivation of indicators, which could potentially reduce management complexity and help prioritize continuous performance improvement. Examples of new indicators are derived from a case study that includes 196 ESDVs at an offshore oil and gas production plant.

Originality/value

Methodological approaches to deriving various performance indicators have rarely been addressed in the maintenance field. The proposed diagnostic framework provides a structured way to identify and locate process performance issues by creating indicators that can bridge generic evaluation aspects and maintenance data. The framework is highly adaptive as data availability functions are used as inputs to generate indicators instead of passively filtering out non-applicable existing indicators.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 2
Type: Research Article
ISSN: 0265-671X

Keywords

Open Access
Article
Publication date: 13 June 2022

Julie Krogh Agergaard, Kristoffer Vandrup Sigsgaard, Niels Henrik Mortensen, Jingrui Ge and Kasper Barslund Hansen

The purpose of this paper is to investigate the impact of early-stage maintenance clustering. Few researchers have previously studied early-stage maintenance clustering…

1027

Abstract

Purpose

The purpose of this paper is to investigate the impact of early-stage maintenance clustering. Few researchers have previously studied early-stage maintenance clustering. Experience from product and service development has shown that early stages are critical to the development process, as most decisions are made during these stages. Similarly, most maintenance decisions are made during the early stages of maintenance development. Developing maintenance for clustering is expected to increase the potential of clustering.

Design/methodology/approach

A literature study and three case studies using the same data set were performed. The case studies simulate three stages of maintenance development by clustering based on the changes available at each given stage.

Findings

The study indicates an increased impact of maintenance clustering when clustering already in the first maintenance development stage. By performing clustering during the identification phase, 4.6% of the planned work hours can be saved. When clustering is done in the planning phase, 2.7% of the planned work hours can be saved. When planning is done in the scheduling phase, 2.4% of the planned work hours can be saved. The major difference in potential from the identification to the scheduling phase came from avoiding duplicate, unnecessary and erroneous work.

Originality/value

The findings from this study indicate a need for more studies on early-stage maintenance clustering, as few others have studied this.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

1276

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 28 February 2024

Eyad Buhulaiga and Arnesh Telukdarie

Multinational business deliver value via multiple sites with similar operational capacities. The age of the Fourth Industrial Revolution (4IR) delivers significant opportunities…

1928

Abstract

Purpose

Multinational business deliver value via multiple sites with similar operational capacities. The age of the Fourth Industrial Revolution (4IR) delivers significant opportunities for the deployment of digital tools for business optimization. Therefore, this study aims to study the Industry 4.0 implementation for multinationals.

Design/methodology/approach

The key objective of this research is multi-site systems integration using a reproducible, modular and standardized “Cyber Physical System (CPS) as-a-Service”.

Findings

A best practice reference architecture is adopted to guide the design and delivery of a pioneering CPS multi-site deployment. The CPS deployed is a cloud-based platform adopted to enable all manufacturing areas within a multinational energy and petrochemical company. A methodology is developed to quantify the system environmental and sustainability benefits focusing on reduced carbon dioxide (CO2) emissions and energy consumption. These results demonstrate the benefits of standardization, replication and digital enablement for multinational businesses.

Originality/value

The research illustrates the ability to design a single system, reproducible for multiple sites. This research also illustrates the beneficial impact of system reuse due to reduced environmental impact from lower CO2 emissions and energy consumption. The paper assists organizations in deploying complex systems while addressing multinational systems implementation constraints and standardization.

Details

Digital Transformation and Society, vol. 3 no. 3
Type: Research Article
ISSN: 2755-0761

Keywords

1 – 10 of over 1000