Search results

1 – 10 of over 1000
Article
Publication date: 3 July 2024

Raja Nurul Waheeda Raja Zilan, Adi Irfan Che-Ani and Siti Rashidah Hanum Abd Wahab

This paper aims to review the elements of facilities condition index (FCI) as one of the most widely used metrics for describing the physical condition of facilities and as a…

Abstract

Purpose

This paper aims to review the elements of facilities condition index (FCI) as one of the most widely used metrics for describing the physical condition of facilities and as a measure of financial indicator related to maintenance activity. This research will benefit future studies that focus on implementation of FCI and encourage the best practice when assessing the physical condition to evaluate the performance of facilities as well as to plan for maintenance action to be taken and financial implication involved based on the findings from FCI.

Design/methodology/approach

A total of 33 studies from 2012 to 2022 were identified and extracted from four academic databased, named Scopus, Google Scholar, Web of Science and Mendeley. These published studies were selected because it matches with the inclusion requirements for research question, “What are the elements of facilities condition index discussed in the literature from 2012 to 2022?”. To answer the research question, the studies in ATLAS.ti were grouped into five major themes based on the codes and categories found.

Findings

This paper presents the findings of a thematic analysis of the current literature discussed about FCI. A total of 33 studies from 2012 to 2022 were identified and extracted from four academic databased, named Scopus, Google Scholar, Web of Science and Mendeley. A themed review was conducted, and five themes were identified as elements of FCI, which are named as follows: “Condition Assessment”, “Deferred Maintenance”, “Facilities Performance”, “Financial and Fund Allocation” and “Decision Making”.

Originality/value

This paper fulfils the fundamental elements on current FCI practices as well as intended to highlight existing practices that are essential to evaluate facilities performance and planning for maintenance strategies.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

1284

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 18 September 2024

Felipe Terra Mohad, Leonardo de Carvalho Gomes, Guilherme da Luz Tortorella and Fernando Henrique Lermen

Total productive maintenance consists of strategies and procedures that aim to guarantee the entire functioning of machines in a production process so that production is not…

Abstract

Purpose

Total productive maintenance consists of strategies and procedures that aim to guarantee the entire functioning of machines in a production process so that production is not interrupted and no loss of quality in the final product occurs. Planned maintenance is one of the eight pillars of total productive maintenance, a set of tools considered essential to ensure equipment reliability and availability, reduce unplanned stoppage and increase productivity. This study aims to analyze the influence of statistical reliability on the performance of such a pillar.

Design/methodology/approach

In this study, we utilized a multi-method approach to rigorously examine the impact of statistical reliability on the planned maintenance pillar within total productive maintenance. Our methodology combined a detailed statistical analysis of maintenance data with advanced reliability modeling, specifically employing Weibull distribution to analyze failure patterns. Additionally, we integrated qualitative insights gathered through semi-structured interviews with the maintenance team, enhancing the depth of our analysis. The case study, conducted in a fertilizer granulation plant, focused on a critical failure in the granulator pillow block bearing, providing a comprehensive perspective on the practical application of statistical reliability within total productive maintenance; and not presupposing statistical reliability is the solution over more effective methods for the case.

Findings

Our findings reveal that the integration of statistical reliability within the planned maintenance pillar significantly enhances predictive maintenance capabilities, leading to more accurate forecasts of equipment failure modes. The Weibull analysis of the granulator pillow block bearing indicated a mean time between failures of 191.3 days, providing support for optimizing maintenance schedules. Moreover, the qualitative insights from the maintenance team highlighted the operational benefits of our approach, such as improved resource allocation and the need for specialized training. These results demonstrate the practical impact of statistical reliability in preventing unplanned downtimes and informing strategic decisions in maintenance planning, thereby emphasizing the importance of your work in the field.

Originality/value

In terms of the originality and practicality of this study, we emphasize the significant findings that underscore the positive influence of using statistical reliability in conjunction with the planned maintenance pillar. This approach can be instrumental in designing and enhancing component preventive maintenance plans. Furthermore, it can effectively manage equipment failure modes and monitor their useful life, providing valuable insights for professionals in total productive maintenance.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 12 September 2024

Nopadol Rompho, Sukrit Vinayavekhin, Chonlada Sajjanit and Kimitaka Asatani

This study aims to identify key research clusters (or sub-fields) in the field of performance measurement research, analyse its historical development and propose future research…

Abstract

Purpose

This study aims to identify key research clusters (or sub-fields) in the field of performance measurement research, analyse its historical development and propose future research avenues.

Design/methodology/approach

Several bibliometric analysis methods, including co-citation analysis and text mining techniques, were used to review papers published on performance measurement research.

Findings

This study reveals eight main clusters of research in this field, ranging from theoretical-focused clusters (e.g. strategic performance measurement) to practical-focused clusters (e.g. design of performance measurement). These clusters are further categorised into four groups based on the size and degree of connectedness. Regarding the analysis of historical development, the established clusters, such as supply chain management, remain important, while newer clusters, such as hospitality and humanitarianism, have recently gained increasing interest.

Originality/value

This study applies citation-based clustering, a type of bibliometric literature review method that has been underused in the field of performance measurement. Moreover, the results obtained from this study are also distinct from those of previous studies, offering valuable insights especially for researchers. With a comprehensive understanding of the field, researchers can use it to understand the key literature, observe ongoing developments within their specialisation and inform their future research directions.

Details

Measuring Business Excellence, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1368-3047

Keywords

Article
Publication date: 28 March 2023

Huiying (Cynthia) Hou, Joseph H.K. Lai, Hao Wu and Tong Wang

This paper aims to investigate the theoretical and practical links between digital twin (DT) application in heritage facilities management (HFM) from a life cycle management…

1071

Abstract

Purpose

This paper aims to investigate the theoretical and practical links between digital twin (DT) application in heritage facilities management (HFM) from a life cycle management perspective and to signpost the future development directions of DT in HFM.

Design/methodology/approach

This state-of-the-art review was conducted using a systematic literature review method. Inclusive and exclusive criteria were identified and used to retrieve relevant literature from renowned literature databases. Shortlisted publications were analysed using the VOSviewer software and then critically reviewed to reveal the status quo of research in the subject area.

Findings

The review results show that DT has been mainly adopted to support decision-making on conservation approach and method selection, performance monitoring and prediction, maintenance strategies design and development, and energy evaluation and management. Although many researchers attempted to develop DT models for part of a heritage building at component or system level and test the models using real-life cases, their works were constrained by availability of empirical data. Furthermore, data capture approaches, data acquisition methods and modelling with multi-source data are found to be the existing challenges of DT application in HFM.

Originality/value

In a broader sense, this study contributes to the field of engineering, construction and architectural management by providing an overview of how DT has been applied to support management activities throughout the building life cycle. For the HFM practice, a DT-cum-heritage building information modelling (HBIM) framework was developed to illustrate how DT can be integrated with HBIM to facilitate future DT application in HFM. The overall implication of this study is that it reveals the potential of heritage DT in facilitating HFM in the urban development context.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. 15 no. 5
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 28 February 2024

Hassan Th. Alassafi, Khalid S. Al-Gahtani, Abdulmohsen S. Almohsen and Abdullah M. Alsugair

Heating, ventilating, air-conditioning and cooling (HVAC) systems are crucial in daily health-care facility services. Design-related defects can lead to maintenance issues…

Abstract

Purpose

Heating, ventilating, air-conditioning and cooling (HVAC) systems are crucial in daily health-care facility services. Design-related defects can lead to maintenance issues, causing service disruptions and cost overruns. These defects can be avoided if a link between the early design stages and maintenance feedback is established. This study aims to use experts’ experience in HVAC maintenance in health-care facilities to list and evaluate the risk of each maintenance issue caused by a design defect, supported by the literature.

Design/methodology/approach

Following semistructured interviews with experts, 41 maintenance issues were identified as the most encountered issues. Subsequently, a survey was conducted in which 44 participants evaluated the probability and impact of each design-caused issue.

Findings

Chillers were identified as the HVAC components most prone to design defects and cost impact. However, air distribution ducts and air handling units are the most critical HVAC components for maintaining healthy conditions inside health-care facilities.

Research limitations/implications

The unavailability of comprehensive data on the cost impacts of all design-related defects from multiple health-care facilities limits the ability of HVAC designers to furnish case studies and quantitative approaches.

Originality/value

This study helps HVAC designers acquire prior knowledge of decisions that may have led to unnecessary and avoidable maintenance. These design-related maintenance issues may cause unfavorable health and cost consequences.

Open Access
Article
Publication date: 30 August 2024

Malwela Joseph Lebea, Justus Ngala Agumba and Oluseyi Julius Adebowale

The United Nations' Sustainable Development Goal of ensuring healthy lives and promoting well-being for people of all ages underscores the vital role of public healthcare…

Abstract

Purpose

The United Nations' Sustainable Development Goal of ensuring healthy lives and promoting well-being for people of all ages underscores the vital role of public healthcare facilities (PHFs) in delivering essential healthcare services. However, these facilities often suffer from inadequate maintenance, exacerbated by the insufficient implementation of maintenance strategies. Recognizing the importance of PHFs in enhancing healthcare services, this paper investigates the Critical Success Factors (CSFs) in the maintenance strategies of PHFs in South Africa.

Design/methodology/approach

Through semi-structured interviews with nineteen purposively selected maintenance personnel from the Limpopo Department of Health (DoH), this study identified and analyzed the CSFs to enhance maintenance operations in PHFs. Thematic content analysis was employed to derive key insights from the collected data.

Findings

The study's findings highlight adequate maintenance planning and effective leadership as the two overarching CSFs in the maintenance of PHFs. These factors play a pivotal role in addressing challenges that hinder the current maintenance team from meeting maintenance requirements to the satisfaction of both staff and patients within PHFs.

Originality/value

The study offers valuable insights for policymakers to improve the effectiveness of maintenance operations in PHFs. By addressing the identified CSFs, policymakers can enhance maintenance operations in PHFs, positively impacting healthcare service delivery and the well-being of both staff and patients.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 7
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 14 July 2022

Ayman Ahmed Ezzat Othman and Ahmed Ramadan Kamal

The aim of this paper is to develop a framework to enhance building maintainability through facilitating early suppliers’ involvement (ESI) in the design process.

Abstract

Purpose

The aim of this paper is to develop a framework to enhance building maintainability through facilitating early suppliers’ involvement (ESI) in the design process.

Design/methodology/approach

A research methodology consisting of literature review, case studies and survey questionnaire was designed to achieve the above-mentioned aim. Firstly, literature review was used to examine the concepts of building maintenance, maintainability, the design process and ESI. Secondly, three case studies were presented and analysed to investigate the role of ESI towards enhancing building maintainability during the design process. Thirdly, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to investigate their perception and application of ESI towards enhancing building maintainability during the design process. Finally, the research developed a framework to facilitate ESI in the design process in ADFs in Egypt.

Findings

Through literature review, the research highlighted the relationship between ESI and enhancing building maintainability and identified the roles, benefits, challenges and that encounter ESI in ADFs, factors for suppliers selection and levels of involvement. Results of the data analysis showed that “Difficulty of trusting external parties and sharing information with transparency” was ranked the highest challenge of ESI in ADFs in Egypt, followed by “Legal competitive advantage restrictions”. Moreover, “Better estimation for operation and maintenance costs” was ranked the highest contributions of ESI towards enhancing building maintainability, followed by “Reduce the number of operation and maintenance problems or reworks”. Finally, respondents stated that “Innovation, technical expertise, and competence” was ranked the highest supplier’s selection criteria, while “paying consultation fees for offering advice and recommendations to the design team” was ranked the highest form of supplier’s remuneration.

Research limitations/implications

The proposed framework contributes to the body of knowledge through proposing five functions that aimed to facilitate ESI in the design process, a research area that received scant attention in construction research. In addition, because of the conceptual nature of the framework, it has to be validated to ensure its capability to overcome the challenges of ESI as an approach for enhancing building maintainability during the design process.

Practical implications

This research presents a practical solution that bridges the gap between theory and practice through overcoming the challenges that obstruct suppliers from being involved in the design process as an approach for enhancing building maintainability.

Originality/value

This research discussed the relationship between ESI and enhancing building maintainability as well as the roles, benefits and challenges that encounter ESI in ADFs. In addition, the research investigated the levels of suppliers’ involvement, selection criteria and forms of payment. Moreover, it investigated the perception and application of ESI in ADFs in Egypt towards improving building maintainability. The research proposed a framework to facilitate the integration of suppliers in the early stages of the project life cycle. It represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 17 September 2024

Mahadev Laxman Naik and Milind Shrikant Kirkire

Asset maintenance in manufacturing industries is a critical issue as organizations are highly sensitive towards maximizing asset uptime. In the advent of Industry 4.0, maintenance…

Abstract

Purpose

Asset maintenance in manufacturing industries is a critical issue as organizations are highly sensitive towards maximizing asset uptime. In the advent of Industry 4.0, maintenance is increasingly becoming technology driven and is being termed as Maintenance 4.0. Several barriers impede the implementation of Maintenance 4.0. This article aims at - exploring the barriers to implementation of Maintenance 4.0 in manufacturing industries, categorizing them, analysing them to prioritize and suggesting the digital technologies to overcome them.

Design/methodology/approach

Twenty barriers to the implementation of Maintenance 4.0 were identified through literature survey and discussion with the industry experts. The identified barriers were divided into five categories based on their source of occurrence and prioritized using fuzzy-technique for order preference by similarity to ideal solution (TOPSIS), sensitivity analysis was carried out to check the robustness of the solution.

Findings

“Data security issues” has been ranked as the most influencing barrier towards the implementation of Maintenance 4.0, whereas “lack of skilled engineers and data scientists” is the least influencing barrier that impacts the implementation of Maintenance 4.0 in the manufacwturing industries.

Practical implications

The outcomes of this research will help manufacturing industries, maintenance engineers/managers, policymakers, and industry professionals for detailed understanding of barriers and identify easy pickings while implementing Maintenance 4.0.

Originality/value

Manufacturing industries are witnessing a paradigm shift due to digitization and maintenance 4.0 forms the cornerstone. Little research has been carried in Maintenance 4.0 and its implementation; this article will help in bridging the gap. The prioritization of the barriers and digital course of actions to overcome those is a unique contribution of this article.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords