The purpose of this study is to identify how the responsibilities and costs of planning, controlling and executing the material, resource and waste flows are shifted between…
Abstract
Purpose
The purpose of this study is to identify how the responsibilities and costs of planning, controlling and executing the material, resource and waste flows are shifted between actors when introducing a construction logistics setup (CLS) as a product innovation in a construction project, compared to the traditional way of organizing these activities.
Design/methodology/approach
This study is an analytical conceptual research study which aims to bring new insights into a problem through logical relationship building. Empirical data are gathered in two cases where CLSs are used, through observations and interviews regarding how the activities within the order-to-delivery process are performed. The results have been discussed at workshops with suppliers, installation companies, contractor firms and trade unions.
Findings
The outcome of this study is a model for illustrating how costs and responsibilities are shifted in the construction project and supply chain when a CLS is introduced. The cost shift is dependent on the activity shift that accompanies the services included in the setup.
Practical implications
The practical contribution of this work is twofold. First, this study provides a methodology of how to evaluate the impact of logistics services on the actors in the construction project. Second, this study shows shifts in costs and responsibilities in logistics activities with the introduction of construction logistics services.
Originality/value
The theoretical contributions of the model and this study lie in the inclusion of a multi-actor perspective in total cost modelling in supply chains.
Details
Keywords
Anna Fredriksson, Mats Janné and Martin Rudberg
The use of third-party logistics (TPL) setups in construction has increased but is still a new phenomenon. The purpose was to increase understanding of how structural and…
Abstract
Purpose
The use of third-party logistics (TPL) setups in construction has increased but is still a new phenomenon. The purpose was to increase understanding of how structural and management dimensions are related in CLSs by describing how CTPL setups are used.
Design/methodology/approach
Ten dimensions to describe and structure CLSs were identified from the literature and used to structure a cross-case analysis of 13 Swedish CLSs.
Findings
The main findings are: (1) there are three typical initiators of CLSs: municipalities, developers and contractors; (2) CLSs are drivers for service differentiation and modularization among TPL providers as construction specific services are required; (3) CLSs play a new role in construction by coordinating logistics activities between the construction project and the vicinity of the site.
Research limitations/implications
The study is based on 13 cases in the Swedish construction context. Additional studies of CLSs in other countries are needed.
Practical implications
The ten dimensions can be used as a guide in designing a CLS and in determining the order of design decisions. The identification and structuring of CTPL services also exemplify the variety of service offerings.
Originality/value
This is one of the first cross-case analyses of CLSs enabling the characterization of CTPL setups. This study identifies how different services included in the setup relate to the roles of SCM and logistics in construction.
Details
Keywords
Christopher Amoah and Hlatshwayo Nkosazana
Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study…
Abstract
Purpose
Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.
Design/methodology/approach
A quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.
Findings
The findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.
Research limitations/implications
Even though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.
Practical implications
To effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.
Originality/value
The study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.
Details
Keywords
This research studies the behavior choice of key actors in the construction supply chain and constructs a model which includes the benefit function of the government, contractors…
Abstract
Purpose
This research studies the behavior choice of key actors in the construction supply chain and constructs a model which includes the benefit function of the government, contractors and owners, aiming at improving the coverage of green buildings.
Design/methodology/approach
In this paper, tripartite dynamic game is studied and simulated based on duplicate dynamic equation. The tripartite game under government intervention is rarely considered, and government punishment measures are seldom introduced into the research.
Findings
According to the simulation results, the practical insights in line with the development of green supply chain are put forward. Rewards and punishments affect the development of the supply chain. New technologies and new materials accelerate the development of green supply chain and then improve the coverage of green buildings.
Research limitations/implications
This paper constructs a dynamic model based on complete information rationality, which is difficult to realize in practice, for information is incomplete and human rationality is limited.
Originality/value
In fact, the government has not issued a punishment document to introduce a new variable adjustment model.
Details
Keywords
A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites…
Abstract
Purpose
A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites. Contractor social networking is particularly problematic on industrialised building system (IBS) infrastructure maintenance projects where contractor’s certified quality product and firms are not matched with maintenance specialisation services. The paper aims to discuss this issue.
Design/methodology/approach
This paper reports on the early stages of research which is developing a new information and communications technology (ICT)-based approach to managing contractor social networking on IBS infrastructure maintenance schemes. As a precursor to this work, the paper reviews current contractor social networking websites practices on IBS infrastructure maintenance projects and explores the ICT tools and techniques currently being employed on such projects.
Findings
The findings reveal the need for more sophisticated contractor social networking websites solutions which accord with the needs of IBS infrastructure maintenance schemes.
Originality/value
The paper concludes by presenting a research framework for developing such a system in the future.
Details
Keywords
Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…
Abstract
Purpose
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.
Design/methodology/approach
The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).
Findings
Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.
Practical implications
The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.
Originality/value
There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.
Details
Keywords
Kimmo Keskiniva, Arto Saari and Juha-Matti Junnonen
This study aims to provide a foundation for the development of subcontracts that suit takt production in construction.
Abstract
Purpose
This study aims to provide a foundation for the development of subcontracts that suit takt production in construction.
Design/methodology/approach
This is a non-empiric conceptual study, which integrates takt production and general construction literature into new proposals for subcontract clauses suitable for takt production in construction. This study uses literature reviews, from which proposals regarding takt production viable subcontract clauses are conducted via logical reasoning.
Findings
A total of 13 proposals for takt production applicable subcontracts are provided in this study. The proposals emphasize detailed and collaborative planning, suitable payment methods and flexibility for takt plan modification.
Originality/value
Previous takt literature has not properly addressed the development of subcontracts for takt production, despite regular attempts to use subcontracting in takt production. This study aims to aid main contractors to create fair and suitable subcontracts, so that adhering to takt schedules could be more viable in practice. This study also acts as a foundation for further empirical studies regarding the subject.
Details
Keywords
Petter Haglund and Martin Rudberg
Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics…
Abstract
Purpose
Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics strategy from a process of establishing fit perspective.
Design/methodology/approach
A large Swedish building contractor's logistics strategy process was analysed using a longitudinal single-case study for a period of 11 years (2008–2019).
Findings
The case study reveals three main constraints to logistics strategy implementation: a dominant purchasing organisation, a lack of incentives and diverging top-management priorities. This suggests that logistics strategy fit is not a conscious choice determined by contextual factors.
Research limitations/implications
Establishing fit is a continuous cycle of regaining fit between the logistics context and logistics strategy components. Fit can be achieved by a change to the logistics context or to logistics strategy components.
Practical implications
Logistics managers may need to opt for satisfactory fit in view of the costs incurred by changing strategy versus the benefits to be gained from a higher degree of fit.
Originality/value
This paper adopts a longitudinal case design to study the fit between the logistics context and strategy, adding to the body of knowledge on organisational design and strategy in logistics and supply chain management.
Details
Keywords
Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp
Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…
Abstract
Purpose
Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.
Design/methodology/approach
This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.
Findings
The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.
Research limitations/implications
The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.
Practical implications
This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.
Originality/value
This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.
Details
Keywords
Provide explanations to why firms subcontract.
Abstract
Purpose
Provide explanations to why firms subcontract.
Design/Methodology/Approach
Theoretical analysis based on current and specific conditions of the construction sector and empirical indicators.
Findings
Attributes potentially influencing the subcontracting decision are updated.
Research Limitations/Implications
The paper will only focus on the make-or-buy decision of the main contractor and not the client.
Practical Implications
Contributing to coming analysis on the subcontractor decision.
Originality/Value
Updated transaction cost analysis on the construction industry.