1 – 10 of 247Michael Sing, Joseph Chan, Henry Liu and Nancy N.H. Ngai
Modular construction is considered a well-established construction method for improving the efficiency of the construction industry worldwide. However, the industry struggles to…
Abstract
Purpose
Modular construction is considered a well-established construction method for improving the efficiency of the construction industry worldwide. However, the industry struggles to achieve higher levels of modularisation in urban areas. Previous studies on decision-making for modularisation have, so far, not focussed much on its application in urban areas. As modular construction could bring lots of advantages such as speed of construction, This study aims to develop a decision-making tool that can assist the project planners in deciding whether the modular construction techniques should be applied in their urban area project.
Design/methodology/approach
Based on the literature review, a total of 35 decision-making factors of modularisation were identified for this study. The decision-making model is then developed to evaluate the significance of each factor using the analytic hierarchy process (AHP) approach. A total number of 72 valid responses were obtained and analysed. The geometric mean of priorities is adopted to obtain the par-wise comparison between the critical factors in which each factor’s weighting in the decision-making model is calculated. Afterwards, the robustness of the decision-making model is demonstrated by the real-life projects in China, Hong Kong and the UK, respectively.
Findings
A total of 35 decision-making factors allocated in five criteria for modular construction selection in urban areas were identified. The criteria include site attributes, project characteristics, labour consideration, environmental and organisation and project risk. Their impact was calculated using the AHP to indicate the relative importance with respect to the adoption of modularisation in urban areas. Afterwards, a two-level decision-making model was developed that can be used as a decision-making tool for the adoption of modular construction.
Practical implications
The outcome of this research will be beneficial to industrial practitioners and academics in understanding the critical attributes that affect the adoption of modular construction in an urban area. It further enables the building professionals to assess the feasibility of using modular construction in their projects, especially at the early stage, so as to facilitate its use.
Originality/value
There is a number of literature on the decision-making model on the adoption of modular construction. However, previous studies did not provide specific concerns related to urban areas, whereas there is an urgent need to have an updated analysis that can be catered to the modular construction in the urban area. In this research study, the 35 decision-making factors were ranked by the experienced project managers and then a pair-wise comparison was conducted. With this information, the robust decision-making model is formulated to offer a kept promised indicator in adopting modularisation in the urban area.
Details
Keywords
Lerato Aghimien, Clinton Ohis Aigbavboa and Douglas Aghimien
The current era of the fourth industrial revolution has attracted significant research on the use of digital technologies in improving construction project delivery. However, less…
Abstract
The current era of the fourth industrial revolution has attracted significant research on the use of digital technologies in improving construction project delivery. However, less emphasis has been placed on how these digital tools will influence the management of the construction workforce. To this end, using a review of existing works, this chapter explores the fourth industrial revolution and its associated technologies that can positively impact the management of the construction workforce when implemented. Also, the possible challenges that might truncate the successful deployment of digital technologies for effective workforce management were explored. The chapter submitted that implementing workforce management-specific digital platforms and other digital technologies designed for project delivery can aid effective workforce management within construction organisations. Technologies such as cloud computing, the Internet of Things, big data analytics, robotics and automation, and artificial intelligence, among others, offer significant benefits to the effective workforce management of construction organisations. However, several challenges, such as resistance to change due to fear of job loss, cost of investment in digital tools, organisational structure and culture, must be carefully considered as they might affect the successful use of digital tools and by extension, impact the success of workforce management in the organisations.
Details
Keywords
Martin Götz and Ernest H. O’Boyle
The overall goal of science is to build a valid and reliable body of knowledge about the functioning of the world and how applying that knowledge can change it. As personnel and…
Abstract
The overall goal of science is to build a valid and reliable body of knowledge about the functioning of the world and how applying that knowledge can change it. As personnel and human resources management researchers, we aim to contribute to the respective bodies of knowledge to provide both employers and employees with a workable foundation to help with those problems they are confronted with. However, what research on research has consistently demonstrated is that the scientific endeavor possesses existential issues including a substantial lack of (a) solid theory, (b) replicability, (c) reproducibility, (d) proper and generalizable samples, (e) sufficient quality control (i.e., peer review), (f) robust and trustworthy statistical results, (g) availability of research, and (h) sufficient practical implications. In this chapter, we first sing a song of sorrow regarding the current state of the social sciences in general and personnel and human resources management specifically. Then, we investigate potential grievances that might have led to it (i.e., questionable research practices, misplaced incentives), only to end with a verse of hope by outlining an avenue for betterment (i.e., open science and policy changes at multiple levels).
Details
Keywords
Qais K. Jahanger, David Trejo and Joseph Louis
The health of an economy is heavily dependent on the productivity of the economy's major industries including construction. While most macro-measures of productivity in the USA…
Abstract
Purpose
The health of an economy is heavily dependent on the productivity of the economy's major industries including construction. While most macro-measures of productivity in the USA construction industry indicate a decline, corresponding studies at the individual task level indicate an increase in productivity. Therefore, this paper aims to identify areas where productivity challenges exist and thus provide recommendations for improvement in the construction industry.
Design/methodology/approach
A model that relates the way construction projects are executed with the sources of data that inform productivity analyses is developed and presented. This effort/value-flow model informs the data analysis that is performed to determine productivity trends for management and field labor. Further analysis for field labor productivity using field data and management productivity was separately conducted. Management productivity was particularly difficult to gauge, resulting in the use of surrogate measures.
Findings
It was observed that while both field labor and management productivities at the industry level have been decreasing, the decrease in management productivity was five times that of field labor productivity. A similar trend was observed for management productivity at the project level.
Originality/value
The primary contribution of this paper to the body of knowledge and industry is the introduction of a holistic analysis of USA construction productivity. Recommendations to improve management productivity include the use of technology, especially project management software.
Details
Keywords
Lerato Aghimien, Clinton Ohis Aigbavboa and Douglas Aghimien
This book aimed to conceptualise a construction workforce management model suitable for effectively managing workers in construction organisations. To this end, this chapter…
Abstract
This book aimed to conceptualise a construction workforce management model suitable for effectively managing workers in construction organisations. To this end, this chapter presents the conceptualised model, which consists of seven workforce management practices with their respective measurement variables. Drawing from existing theories, models, and practices, the chapter concludes that a construction organisation that will attain its strategic objectives in the current fourth industrial revolution era must be willing to promote effective recruitment and selection, compensation and benefits, performance management and appraisal, employee involvement and empowerment, training and development, as well as improving workers emotional intelligence and handling external environment pressure. These practices can promote proactiveness, participation, and improved skills and can lead to effective commitment, better quality, and flexibility within the organisation.
Details
Keywords
Robert Osei-Kyei, Timur Narbaev, Michael Atafo-Adabre, Nicholas Chileshe and Joseph Kwame Ofori-Kuragu
The demand for retirement villages globally has been increasing due to the rapid growth in the ageing population in recent years. To address the rising challenges in the…
Abstract
Purpose
The demand for retirement villages globally has been increasing due to the rapid growth in the ageing population in recent years. To address the rising challenges in the retirement market, the public–private partnership (PPP) has become a feasible method to develop retirement villages. This paper aims to survey and examine the key success criteria (SC) for using the PPP approach in the retirement village sector.
Design/methodology/approach
An empirical questionnaire survey was conducted with experts experienced in international PPP and retirement village. The analysis was conducted using one-way analysis of variance, mean score analysis, Kendall’s coefficient of concordance and factor analysis.
Findings
Results indicate that out of the 16 recognized SC, the most significant ones are SC1: “Affordability”, SC11: “Reduced social isolation of residents” and SC14: “Improvement of emotional wellbeing of residents”. Furthermore, results from the factor analysis technique indicate that the 16 SC can be classified into five major factor groupings, and these include SCG1 – “Financial performance of project”; SCG2 – “Adherence to design and technical specifications”; SCG3 – “Adherence to local council/authority’s environmental health and socio-economic requirements”; SCG4 – “Social inclusion and risk management”; and SCG5 – “Advancement in emotional wellbeing and physical health of residents”.
Originality/value
The study will sufficiently assist retirement village stakeholders, retirement village project participants and related government authorities of the best measures to put in place to maintain the sustainable development of the global retirement village market.
Details
Keywords
Junjie Li, Jiaying Zhang, Chunlu Liu and Xiangyun Luo
This research paper aims to establish a comprehensive framework for the barriers to CER in the construction industry, assesses the barriers' relative degrees of hindrance and…
Abstract
Purpose
This research paper aims to establish a comprehensive framework for the barriers to CER in the construction industry, assesses the barriers' relative degrees of hindrance and causal mechanisms.
Design/methodology/approach
Firstly, 26 carbon emission reduction (CER) barriers in the construction industry were identified based on a systematic literature review (SLR) and categorized into five dimensions: policy, economy, society, technology and organization (PEST + O model). Secondly, the Best–Worst Method (BWM) was used to clarify the degrees of hindrance of the CER barriers. Then, the Grey-Decision-Making Trial and Evaluation Laboratory (Grey-DEMATEL) was used to visualize the directional cause–result relationship network among prominent barriers. Finally, the Boston matrix model was used to propose differentiated strategies to address CER barriers in the construction industry.
Findings
The calculated centrality and causality of the prominent barriers indicated that the lack of relevant legal policies and normative guidelines, the poor binding force and enforcement of existing relevant policies, the lack of effective economic subsidies and incentives and the difficulty in the operation, transformation and upgrading of existing construction CER are the key barriers that CER needs to address first in the construction industry. Considering the order of priority and the optimal path, differentiated countermeasures are proposed to address key, driving, independent and effect barriers.
Originality/value
This study develops a BWM–Grey-DEMATEL integrated multi-criteria decision-making model. An innovative C-shaped strategic map for addressing CER barriers in the construction industry is proposed by integrating the dual dimensions of time and space. This will guide practitioners, policymakers and decision-makers in developing CER strategies.
Details
Keywords
Sampa Chisumbe, Clinton Ohis Aigbavboa, Erastus Mwanaumo and Wellington Didibhuku Thwala
Mark E. Mendenhall, Frank C. Butler, Philip T. Roundy and Andrew F. Ehat
This paper aims to study the formation and preservation of behavioral integration (BI) in the top management team (TMT) of The Church of Jesus Christ of Latter-day Saints from…
Abstract
Purpose
This paper aims to study the formation and preservation of behavioral integration (BI) in the top management team (TMT) of The Church of Jesus Christ of Latter-day Saints from 1844 to the present.
Design/methodology/approach
An analytically structured history approach within a case exemplar framework is adopted. Theoretical insights are extrapolated from the case study to form a process model of BI formation and preservation in TMTs.
Findings
The findings reveal that three factors primarily influence BI creation (induction, education and cementation) and that BI is preserved via an iterative process that is driven by CEO conservatorship, intentional mentoring and social modeling.
Originality/value
This study investigates an unexplored area in upper echelons theory: the process by which BI is formed and preserved in TMTs and presents a process model of BI formation and preservation that shifts attention in the literature from analyses of the effect of BI on various organizational outcomes to how it can be formed in the first place and then preserved.
Details