Article
Publication date: 1 September 2022

Rinu Sathyan, Parthiban Palanisamy, Suresh G. and Navin M.

The automotive industry appears to overcome much of its obstacles, despite the constant struggle facing COVID-19. The pandemic has resulted in significant improvements in the…

Abstract

Purpose

The automotive industry appears to overcome much of its obstacles, despite the constant struggle facing COVID-19. The pandemic has resulted in significant improvements in the habits and conduct of consumers. There is an increased preference for personal mobility. In this dynamic environment with unexpected changes and high market rivalry, automotive supply chains focus more on executing responsive strategies with minimum costs. This paper aims to identify and model the drivers to the responsiveness of automotive supply chain.

Design/methodology/approach

Seventeen drivers for supply chain responsiveness have been identified from the extensive literature, expert interview. An integrated methodology of fuzzy decision-making trial and evaluation laboratory–interpretive structural modelling (DEMATEL–ISM) is developed to establish the interrelationship between the drivers. The cause–effect relationship between the drivers was obtained through fuzzy DEMATEL technique, and a hierarchical structure of the drivers was developed using the ISM technique.

Findings

The result of the integrated methodology revealed that strategic decision-making of management, accurate forecasting of demand, advanced manufacturing system in the organisation and data integration tools are the critical drivers.

Research limitations/implications

This study has conceptual and analytical limitations. In this study, a limited number of drivers are examined for supply chain responsiveness. Further research may examine the role of other key performance indicators in the broad field of responsiveness in the automotive supply chain or other industry sectors. Future study can uncover the interrelationships and relative relevance of indicators using advanced multi-criteria decision-making methodologies.

Originality/value

The authors proposed an integrated methodology that will be benefitted to the supply chain practitioners and automotive manufacturers to develop management strategies to improve responsiveness. This study further helps to compare the responsiveness of the supply chain between various automotive manufacturers.

Article
Publication date: 30 December 2019

C.R. Vishnu, R. Sridharan, P.N. Ram Kumar and V. Regi Kumar

Risk management in the healthcare sector is a highly relevant sub-domain and a crucial research area from the humanitarian perspective. The purpose of this paper is to focus on…

Abstract

Purpose

Risk management in the healthcare sector is a highly relevant sub-domain and a crucial research area from the humanitarian perspective. The purpose of this paper is to focus on the managerial/supply chain risk factors experienced by the government hospitals in an Indian state. The present paper analyzes the inter-relationships among the significant risk factors and ranks those risk factors based on their criticality.

Design/methodology/approach

The current research focuses on 125 public hospitals in an Indian state. Questionnaire-based survey and personal interviews were conducted in the healthcare sector among the inpatients and hospital staff to identify the significant risk factors. An integrated DEMATEL–ISM–PROMETHEE method is adopted to analyze the impact potential and dependence behavior of the risk factors.

Findings

The analysis asserts the absence of critical risk factors that have a direct impact on patient safety in the present healthcare system under investigation. However, the results illustrate the remarkable impact potential attributed to the risk factor, namely, staff shortage in inducing other risk factors such as employee attitudinal issues, employee health issues and absenteeism altogether resulting in community mistrust/misbeliefs. Maintenance mismanagement, monsoon time epidemics, physical infrastructure limitations are also found to be significant risk factors that compromise patient satisfaction levels.

Practical implications

Multiple options are illustrated to mitigate significant risk factors and operational constraints experienced by public hospitals in the state. The study warrants urgent attention from government officials to fill staff vacancies and to improve the infrastructural facilities to match with the increasing demand from the society. Furthermore, this research recommends the hospital authorities to start conducting induction and training programs for the hospital employees to instill the fundamental code of conduct while working in hectic, challenging and even in conditions with limited resources.

Originality/value

Only limited papers are visible that address the identification and mitigation of risk factors associated with hospitals. The present paper proposes a novel DEMATEL–ISM–PROMETHEE integrated approach to map the inter-relationships among the significant risk factors and to rank those risk factors based on their criticality. Furthermore, the present study discloses the unique setting of the public healthcare system in a developing nation.

Details

International Journal of Health Care Quality Assurance, vol. 33 no. 1
Type: Research Article
ISSN: 0952-6862

Keywords

Article
Publication date: 20 February 2024

Xiaobo Shi, Yan Liu, Kunkun Ma, Zixin Gu, Yaning Qiao, Guodong Ni, Chibuzor Ojum, Alex Opoku and Yong Liu

The purpose is to identify and evaluate the safety risk factors in the coal mine construction process.

Abstract

Purpose

The purpose is to identify and evaluate the safety risk factors in the coal mine construction process.

Design/methodology/approach

The text mining technique was applied in the stage of safety risk factor identification. The association rules method was used to obtain associations with safety risk factors. Decision-Making Trial and Evaluation Laboratory (DEMATEL) and Interpretative Structural Modeling (ISM) were utilized to evaluate safety risk factors.

Findings

The results show that 18 safety risk factors are divided into 6 levels. There are 12 risk transmission paths in total. Meanwhile, unsafe behavior and equipment malfunction failure are the direct causes of accidents, and inadequate management system is the basic factor that determines the safety risk status.

Research limitations/implications

Due to the limitation of the computational matrix workload, this article only categorizes numerous lexical items into 18 factors. Then, the workshop relied on a limited number of experts; thus, the findings may be potentially biased. Next, the accident report lacks a universal standard for compilation, and the use of text mining technique may be further optimized. Finally, since the data are all from China, subsequent cross-country studies should be considered.

Social implications

The results can help China coal mine project managers to have a clear understanding of safety risks, efficiently carry out risk hazard identification work and take timely measures to cut off the path of transmission with risks identified in this study. This helps reduce the economic losses of coal mining enterprises, thus improving the safety standards of the entire coal mining industry and the national standards for coal mine safety policy formulation.

Originality/value

Coal mine construction projects are characterized by complexity and difficulties in construction. Current research on the identification and assessment of safety risk factors in coal mine construction is insufficient. This study combines objective and systematic research approaches. The findings contribute to the safety risk management of China coal mine construction projects by providing a basis for the development of safety measures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 May 2020

Alireza Naser SadrAbadi, Seyed Mahmood Zanjirchi and Negar Jalilian

In Iran, the Bank A is one of the largest and most effective banks of the banking network. The continued success of Bank A in improving the economic level of the country and…

Abstract

Purpose

In Iran, the Bank A is one of the largest and most effective banks of the banking network. The continued success of Bank A in improving the economic level of the country and satisfying the customers depends on recognizing all banking activities and processes in the form of supply chain and performing the necessary managerial acts in order to enhance the relevant processes. In this regard, the present study aimed to improve the most effective processes of banking services supply chain of Bank A in Iran.

Design/methodology/approach

The present study was applied and descriptive. Research population included the heads, deputies and active experts in Bank A, who were selected through judgmental and saturation sampling methods to complete the questionnaire and participate in interviews and conference sessions. Regarding to aim of study, the integrated approach of intuitionistic fuzzy based DEMATEL-ISM was used.

Findings

According to the results, the processes of product delivery, information technology management, public relations and advertising management, risk management, and marketing and sales management exerted the most impacts on other processes in the supply chain. Finally, after designing a process improvement path, solutions were presented to improve the most effective processes.

Originality/value

In this research, efforts were dedicated to the recognition of the major processes of the services supply chain of Bank A, designing the process framework of the bank and improving the prioritized processes by evaluating the causal relations that exist among the processes of the services supply chain.

Details

International Journal of Productivity and Performance Management, vol. 70 no. 3
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 4 July 2022

Ying Zhao, Wei Chen, Zhuzhang Yang, Zongliang Li and Yong Wang

Risk factors related delay hinder the schedule performance of most construction projects in the world. It is a critical challenge to realize the advantages of prefabricated…

Abstract

Purpose

Risk factors related delay hinder the schedule performance of most construction projects in the world. It is a critical challenge to realize the advantages of prefabricated construction projects (PCPs) under the negative effect of schedule delay. This paper aims to propose an exhaustive list of risk factors impeding the progress of PCPs and evaluate the collected risk factors based on the cause–effect relations. The ultimate goal is to improve the understanding of the complex relations among various risk factors related delay in PCPs, and also offer managers a reference on aspect of schedule risk management.

Design/methodology/approach

This paper proposes a hybrid method of GT–DEMATEL–ISM, that is combing grounded theory, DEMATEL (decision-making trial and evaluation laboratory) and ISM (Interpretative Structural Modeling), to collect, evaluate and structure risk factors related delay for PCPs. The research procedure of this methodology is divided into three stages systematically involving qualitative and quantitative analysis. In the first stage, GT is utilized to implement qualitative analysis to collect the risk factors leading to schedule delay in PCPs. While, the quantitative analysis is to analyze and evaluate the collected risk factors based on the cause–effect relations in the next two stages evaluation by the DEMATEL focuses on quantifying the priority and intensity of the relations between factors. Additionally, ISM is employed to construct the hierarchical structure and graphically represent the pairwise relations between factors.

Findings

The outcome of qualitative investigation by grounded theory proposes a theoretical framework of risk factors related delay for PCPs. The framework contains three levels of category, namely, core category, main category and initial category and provides a list of risk factors related delay. Following this finding, evaluation results by the DEMATEL classify factors into cause and effect groups and determine 11 critical delay risk factors. Meanwhile, the findings show that risks referring to organizational management issue foremost impact the progress of PCPs. Furthermore, a systemic multilevel hierarchical structure model is visually constructed by ISM to present the pairwise linkages of critical factors. The model provides the risk transmission chains to map the spread path of delay impact in the system.

Originality/value

The contribution of the study involves twofold issues. Methodologically, this research proposes a hybrid method GT–DEMATEL–ISM used to identify and analyze factors for a complex system. It is also applicable to other fields facing similar problems that require collecting, evaluating and structuring certain elements as a whole in a comprehensive perspective. The theoretical contribution is to fill the relevant research gap of the existing body of knowledge. To the best knowledge of the authors, this paper is the first attempt to integrate qualitative and quantitative research for risk analysis related delay and take the insight into the whole process of PCPs covering off-site manufacture and on-site construction. Furthermore, the analysis of findings provided both a micro view focusing on individual risk factor and a managerial view from a systematic level. The findings also contribute the effective information to improve the risk management related schedule delay in PCPs.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 May 2023

Min Cheng, Lin Liu, Xiaotong Cheng and Li Tao

Many waste-to-energy (WTE) plants are constructed and operated using the public-private partnership (PPP) mode in China. However, risk events of PPP WTE incineration projects…

Abstract

Purpose

Many waste-to-energy (WTE) plants are constructed and operated using the public-private partnership (PPP) mode in China. However, risk events of PPP WTE incineration projects sometimes occur. This study aims to clarify the relationship of risks in China's PPP WTE incineration projects and identify the key risks accordingly and risk transmission paths.

Design/methodology/approach

A risk list of PPP WTE incineration projects was obtained based on literature analysis. Moreover, a hybrid approach combining fuzzy sets, decision-making trial and evaluation laboratory (DEMATEL) and interpretive structural modeling (ISM) was developed to analyze the causality of risks, explore critical risks and reveal the risk transmission paths. The quantitative analysis process was implemented in MATLAB.

Findings

The results show that government decision-making risk, government credit risk, government supervision behavior risk, legal and policy risk, revenue and cost risk and management capacity risk are the critical risks of PPP WTE incineration projects in China. These critical risks are at different levels in the risk hierarchy and often trigger other risks.

Originality/value

Currently, there is a lack of exploration on the interaction between the risks of PPP WTE incineration projects. This study fills this gap by examining the key risks and risk transfer pathways of PPP WTE incineration projects from the perspective of risk interactions. The findings can help the public and private sectors to systematically understand the risks in PPP WTE incineration projects, thus enabling them to identify the risks that need to be focused on when making decisions and to optimize risk prevention strategies. The proposed hybrid approach can offer methodological ideas for risk analysis of other types of PPP projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 20 July 2021

R.K. Jena and Yogesh Dwivedi

Tourism is one of the upcoming service industry in India with high potentials for future growth, particularly in rural areas. Many potential barriers are affecting the growth of

3243

Abstract

Purpose

Tourism is one of the upcoming service industry in India with high potentials for future growth, particularly in rural areas. Many potential barriers are affecting the growth of tourism in rural India. Therefore, it is essential to explore and prioritize the barriers to tourism growth in rural India.

Design/methodology/approach

Qualitative and quantitative responses from “16” experts related to tourism and hospitality management from central India are collected for this study. An integrated Multi-Criteria Decision Making (MCDM) based framework is adopted to identify and relate significant barriers to tourism growth in India.

Findings

The result of the study identified many significant barriers and their importance to tourism growth in rural India.

Research limitations/implications

The findings of this study add to the knowledge base of tourism research in line with the previous literature. This study offers an in-depth understanding of barriers focusing on rural tourism growth and devising both the plan of action and the suggestive measures in dealing with rural tourism.

Originality/value

The study provides a robust framework by integrating Interpretive Structural Modelling(ISM) and Decision Making Trial and Evaluation Laboratory (DEMATEL) to explore and prioritizing the critical barriers to rural tourism growth in India. The results of this study can help the decision-maker to fundamentally improve the economy of India through the growth of rural tourism.

Details

Journal of Tourism Futures, vol. 9 no. 3
Type: Research Article
ISSN: 2055-5911

Keywords

Article
Publication date: 9 April 2024

Shuai Zhan and Zhilan Wan

The credit of agricultural product quality and safety reflects the ability of the main actors involved in the supply chain to provide reliable agricultural products to consumers…

Abstract

Purpose

The credit of agricultural product quality and safety reflects the ability of the main actors involved in the supply chain to provide reliable agricultural products to consumers. To fundamentally solve the problem of agricultural product quality and safety, it is worth studying how to make the credit awareness and integrity self-discipline of the supply chain agriculture-related subjects strengthened and the role and value of credit supervision given full play. Starting from the application of blockchain in the agricultural product supply chain, this paper aims to investigate the main factors affecting the credit regulation of agricultural product quality.

Design/methodology/approach

Using the DEMATEL-ISM (decision-making trial and evaluation laboratory–interpretative structural modeling) method, we analyze the credit influencing factors of agricultural quality and safety empowered by blockchain technology, find the causal relationship between the crucial influencing factors and deeply explore the hierarchical transmission relationship between the influencing factors. Then, the path analysis in structural equation modeling is utilized to verify and measure the significance and effect value of the transmission relationship among the crucial influencing factors of credit regulation.

Findings

The results show that the quality and safety credit regulation of agricultural products is influenced by a combination of direct and deep influencing factors. Long-term stable cooperative relationship, Quality and safety credit evaluation, Supply chain risk control ability, Quality and safety testing, Constraints of the smart contract are the main influence path of blockchain embedded in agricultural product supply chain quality and safety credit supervision.

Originality/value

Credit supervision is an important means to improve the ability and level of social governance and standardize the market order. From the perspective of blockchain embedded in the agricultural supply chain, the regulatory body is transformed from the product body to the supply chain body. Take the credit supervision of supply chain subjects as the basis of agricultural product quality supervision. With the help of blockchain technology to improve the effectiveness of agricultural product quality and safety credit supervision, credit supervision is used to constrain and incentivize the behavior of agricultural subjects.

Details

Industrial Management & Data Systems, vol. 124 no. 5
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 24 October 2021

Cheng Gong, Hongyu Xu, Feng Xiong, Jian Zuo and Na Dong

Some papers have investigated the complex factors impacting building information modeling (BIM) application in prefabricated buildings (PBs), but few paid attention to their…

Abstract

Purpose

Some papers have investigated the complex factors impacting building information modeling (BIM) application in prefabricated buildings (PBs), but few paid attention to their interaction relationships. Ignoring the fact that different factors are not isolated may lead to some key factors being overlooked without appropriate improvement strategies being proposed. This paper aims to analyze those factors and their inter-relationships, with the view to identify the critical factors and their interaction relationships so as to derive constructive strategies that would effectively facilitate BIM adoption in Chinese prefabrication.

Design/methodology/approach

First, factors influencing BIM application in prefabrication are extracted and collated by literature review, expert interview and analysis of PBs characteristics. Thereafter, an evaluation laboratory (decision-making trial and evaluation laboratory) and interpretive structural modeling are used to explore the relationships and hierarchy among the factors. Based on the degree of cause and centrality, critical factors are extracted and the interaction relationship are investigated.

Findings

The results show that BIM policies and standards for PBs are the main causal factors. The maturity of BIM software and BIM data interface for PBs, willingness to share data, the strategic goals of the enterprise, BIM law and BIM input and benefit are the main transitional factors while BIM staff and workflow, enterprise attitude, distribution of BIM liability and cooperation of participants are the main direct factors.

Originality/value

Based on the above findings, corresponding improvement strategies are proposed so as to promote BIM application in prefabrication and the rapid development of China’s PBs efficiently.

Article
Publication date: 11 December 2023

Mohammad Hosein Madihi, Ali Akbar Shirzadi Javid and Farnad Nasirzadeh

In traditional Bayesian belief networks (BBNs), a large amount of data are required to complete network parameters, which makes it impractical. In addition, no systematic method…

Abstract

Purpose

In traditional Bayesian belief networks (BBNs), a large amount of data are required to complete network parameters, which makes it impractical. In addition, no systematic method has been used to create the structure of the BBN. The aims of this study are to: (1) decrease the number of questions and time and effort required for completing the parameters of the BBN and (2) present a simple and apprehensible method for creating the BBN structure based on the expert knowledge.

Design/methodology/approach

In this study, by combining the decision-making trial and evaluation laboratory (DEMATEL), interpretive structural modeling (ISM) and BBN, a model is introduced that can form the project risk network and analyze the impact of risk factors on project cost quantitatively based on the expert knowledge. The ranked node method (RNM) is then used to complete the parametric part of the BBN using the same data obtained from the experts to analyze DEMATEL.

Findings

Compared to the traditional BBN, the proposed method will significantly reduce the time and effort required to elicit network parameters and makes it easy to create a BBN structure. The results obtained from the implementation of the model on a mass housing project showed that considering the identified risk factors, the cost overruns relating to material, equipment, workforce and overhead cost were 37.6, 39.5, 42 and 40.1%, respectively.

Research limitations/implications

Compared to the traditional BBN, the proposed method will significantly reduce the time and effort required to elicit network parameters and makes it easy to create a BBN structure. The results obtained from the implementation of the model on a mass housing project showed that considering the identified risk factors, the cost overruns relating to material, equipment, workforce and overhead cost were 37.6, 39.5, 42 and 40.1%, respectively. The obtained results are based on a single case study project and may not be readily generalizable.

Originality/value

The presented framework makes the BBN more practical for quantitatively assessing the impact of risk on project costs. This helps to manage financial issues, which is one of the main reasons for project bankruptcy.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords