Search results

1 – 10 of over 105000
Article
Publication date: 1 August 2019

Sandra Matarneh, Mark Danso-Amoako, Salam Al-Bizri, Mark Gaterell and Rana Matarneh

The purpose of this study is to address challenges in the current information exchange process between building information modelling (BIM) and facilities management (FM) systems…

1124

Abstract

Purpose

The purpose of this study is to address challenges in the current information exchange process between building information modelling (BIM) and facilities management (FM) systems and to propose a workable solution. This study’s objective is to identify the information exchange requirements and to develop methods for seamless information flow between building information models and FM systems.

Design/methodology/approach

Data collection and analysis was based on an extensive literature review of similar studies followed by a questionnaire survey with a total of 112 participants and 2 focus groups with a total of 12 participants to validate the conceptual framework. The outputs of the survey analysis formed the background of the proposed framework to streamline information exchange process between building information models and FM systems.

Findings

The study findings form a foundation for enabling the integration of various data sources including building information models. Such integrated platforms will enable automated information exchange between the various data sources and FM systems. The study also provides key information requirements sources to complement the existing construction operations building information exchange information and to support standardization for information exchange process.

Originality/value

The contribution of this study is the identification of information exchange requirements and sources to enable seamless information flow between BIM and FM systems. The study findings will also lay the basis for research studies using the developed framework context to enable the identification of specific data outputs for FM systems inputs.

Article
Publication date: 2 October 2019

Ahmed Alnaggar and Michael Pitt

The purpose of this study is to outline the problems associated with asset information management using the Construction Operations Building Information Exchange (COBie) standard…

Abstract

Purpose

The purpose of this study is to outline the problems associated with asset information management using the Construction Operations Building Information Exchange (COBie) standard and to analyse the causes of industry failure to successfully adopt the standard. Based on this analysis, the paper will propose a process model, namely, Lifecycle Exchange of Asset Data (LEAD) to manage asset dataflow between all building stakeholders from design to construction and ultimately to the facility management team. This model aims to help the construction supply chain to produce complete and high-quality asset data that supports the operation phase of the built environment.

Design/methodology/approach

A review of relevant studies provided a theoretical background for this study. The authors then collected and analysed COBie data from five live construction projects using building information modelling (BIM) projects from different design and construction companies. The process model is based on an industry placement within Bouygues UK construction company, which was a Tier 1 building contractor in London in the period from December 2016 to December 2018. The researcher used an inductive approach observing current practises in two construction projects to produce “LEAD” model. Then a focus group was conducted with industry experts to discuss and refine the process model.

Findings

Analysis of literature and data collected in the course of this study revealed that although COBie is a BIM Level 2 standard in the UK, there is currently a low success rate in producing complete and accurate COBie data in the UK construction industry. This low rate is because of COBie’s rigid data syntax/structure, complexity and ambiguity of its data exchange process, which suggests that COBie may not be the future of the industry. Based on these findings, the study proposed a process model, namely, “LEAD,” to improve COBie output and also to be used with project-specific information requirements.

Practical implications

To the best of the authors’ knowledge, this paper is one of the first to focus solely on asset data exchange process using COBie standard and highlights the problems the industry faces in this remit. The study is based on industry placement for two years, so the analysis is based on actual and current industry problems. Current industry practices also informed the “LEAD” model, and the model provides a step-by-step guidance in producing and exchanging BIM asset data in all stages of the building lifecycle.

Originality/value

This paper provides a detailed analysis of the most common problems associated with COBie as an asset data exchange standard. Understanding these problems is of high value for industry practitioners to avoid them in projects. The paper also proposed a novel process model that can be used either to improve COBie quality or can be used with any project-specific data requirements.

Article
Publication date: 9 May 2016

Margarida Jerónimo Barbosa, Pieter Pauwels, Victor Ferreira and Luís Mateus

Building information modeling (BIM) is most often used for the construction of new buildings. By using BIM in such projects, collaboration among stakeholders in an architecture…

3481

Abstract

Purpose

Building information modeling (BIM) is most often used for the construction of new buildings. By using BIM in such projects, collaboration among stakeholders in an architecture, engineering and construction project is improved. To even further improve collaboration, there is a move toward the production and usage of BIM standards in various countries. These are typically national documents, including guides, protocols, and mandatory regulations, that introduce guidelines about what information should be exchanged at what time between which partners and in what formats. If a nation or a construction team agrees on these guidelines, improved collaboration can come about on top of the collaboration benefits induced by the mere usage of BIM. This scenario might also be targeted for interventions in existing buildings. The paper aims to discuss these issues.

Design/methodology/approach

In this paper, the authors investigate the general content and usage of existing BIM standards for new constructions, describing specifications about BIM deliverable documents, modeling, and collaboration procedures. The authors suggest to what extent the content in the BIM standards can also be used for interventions in existing buildings. These suggestions rely heavily on literature study, supported by on-site use case experiences.

Findings

From this research, the authors can conclude that the existing standards give a solid basis for BIM collaboration in existing building interventions, but that they need to be extended in order to be of better use in any intervention project in an existing building. This extension should happen at: data modeling level: other kinds of data formats need to be considered, coming from terrestrial laser scanning and automatic digital photogrammetry tools; at data exchange level: exchange requirements should take explicit statements about modeling tolerances and levels of (un)certainty; and at process modeling level: business process models should include information exchange processes from the very start of the building survey (BIM→facility management→BIM or regular audit).

Originality/value

BIM environments are not often used to document existing buildings or interventions in existing buildings. The authors propose to improve the situation by using BIM standards and/or guidelines, and the authors give an initial overview of components that should be included in such a standard and/or guideline.

Details

Structural Survey, vol. 34 no. 2
Type: Research Article
ISSN: 0263-080X

Keywords

Article
Publication date: 20 August 2018

Jeevan Jacob and Koshy Varghese

The building design processes today are complex, involving many disciplines and issues like collaboration, concurrency and collocation. Several studies have focused on…

Abstract

Purpose

The building design processes today are complex, involving many disciplines and issues like collaboration, concurrency and collocation. Several studies have focused on understanding and modeling formal information exchange in these processes. Few past studies have also identified the importance of informal information exchanges in the design process and proposed passive solutions for facilitating this exchange. The purpose of this paper is to term the informal information as ad hoc information and explores if components of ad hoc information exchanges can be actively managed.

Design/methodology/approach

An MDM-based framework integrating product, process and people dependencies is proposed and a prototype platform to implement this framework is developed. The demonstration on the usage of this platform to identify information paths during collaboration and hence manage ad hoc information exchanges is presented through an example problem.

Findings

Based on the effectiveness of the prototype platform in identifying information paths for design queries, it is concluded that the proposed framework is useful for actively managing some components of ad hoc information exchange.

Originality/value

This research enables the design manager/participants to make a more informed decision on requesting and releasing design information.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 January 2022

Marjan Sadeghi, Jonathan Weston Elliott and Mohammed Hashem Mehany

Successful implementation of a building information modeling (BIM) for building operation and maintenance (O&M) requires purposeful, early-design identification of…

Abstract

Purpose

Successful implementation of a building information modeling (BIM) for building operation and maintenance (O&M) requires purposeful, early-design identification of end-user-specific model exchange requirements. This paper aims to provide a semantic data-rich classification system for model objects to convey facilities management (FM) requirements in BIM guidelines in support of efficient FM-BIM data workflows.

Design/methodology/approach

A modularized, repeatable and technical solution for semantic requirements of BIM exchange objects was developed through ontology-based data mapping of the industry foundation classes. The proposed solution further contextualizes syntax per the buildingSMART Data Dictionary schema and provides an implementation agreement to address the quality issues of discipline BIMs and establish consistent modeling and naming conventions to facilitate automated BIM data workflow.

Findings

The level of semantics (LOS) development framework and the results of LOS implementation focusing on a building mechanical system case project are presented and discussed to showcase the increased efficiency resulting from its implementation throughout the BIM data management workflows.

Originality/value

This study represents a pioneering effort to create and implement the LOS schema as a modularized solution in support of automatic BIM data creation, adjustment, verification and transition across the design, construction and O&M workflows of a large owner organization in the Midwest USA.

Article
Publication date: 25 January 2021

Pouyan Esmaeilzadeh, Spurthy Dharanikota and Tala Mirzaei

Patient-centric exchanges, a major type of Health Information Exchange (HIE), empower patients to aggregate and manage their health information. This exchange model helps patients…

Abstract

Purpose

Patient-centric exchanges, a major type of Health Information Exchange (HIE), empower patients to aggregate and manage their health information. This exchange model helps patients access, modify and share their medical information with multiple healthcare organizations. Although existing studies examine patient engagement, more research is required to investigate patients' attitudes and willingness to play an active role in patient-centered information exchange. The study's main objective is to develop a model based on the belief-attitude-intention paradigm to empirically examine the effects of patients' attitudes toward engagement in care on their willingness to participate in patient-centric HIE.

Design/methodology/approach

The authors conducted an online survey study to identify the antecedents and consequences of patients' attitudes toward engagement in care. To empirically test the research model, the authors collected data from a national sample (n = 357) of individuals in the United States. The data were analyzed using structural equation modeling (SEM).

Findings

The proposed model categorizes the antecedents to patients' attitudes toward engagement in patient-related and healthcare system factors. The results show that patient-related factors (perceived health literacy and perceived coping ability) and health system factors (perceived experience with the healthcare organization and perceived patient-provider interaction) significantly shape patient attitude toward care management engagement. The results indicate that patients' attitudes toward engaging in their healthcare significantly contribute to their willingness to participate in medical information sharing through patient-centric HIE initiatives. Moreover, the authors’ findings also demonstrate that the link between patient engagement and willingness to participate in HIE is stronger for individuals who perceive lower levels of privacy and security concerns.

Originality/value

The authors validate the proposed model explaining patients' perceptions about their characteristics and the healthcare system significantly influence their attitude toward engaging in their care. This study also suggests that patients' favorable attitude toward engagement can bring patient-centric HIE efforts onto a path to success. The authors’ research attempts to shed light on the importance of patients' roles in adopting patient-centric HIE initiatives. Theoretical and practical contributions of this study are noticeable since they could result in a deeper understanding of the concept of patient engagement and how it may affect healthcare services in an evolving digital world. The authors’ findings can help healthcare organizations provide public citizen-centric services by introducing user-oriented approaches in healthcare delivery systems.

Article
Publication date: 20 April 2022

Ahmad Mohammad Ahmad, Sergio Rodriguez Trejo, Mian Atif Hafeez, Nashwan Dawood, Mohamad Kassem and Khalid Kamal Naji

Energy analysis (EA) within a building information modelling (BIM) enables consistent data integration in central repositories and eases information exchange, reducing rework…

Abstract

Purpose

Energy analysis (EA) within a building information modelling (BIM) enables consistent data integration in central repositories and eases information exchange, reducing rework. However, data loss during information exchange from different BIM uses or disciplines is frequent. Therefore, a holistic approach for different BIM uses enables a coherent life cycle information flow. The life cycle information flow drives the reduction of data loss and model rework and enhances the seamless reuse of information. The latter requires a specification of the EA key performance indicators (KPIs) and integrating those in the process.

Design/methodology/approach

The paper presents a set of KPIs extracted from the developed EA process maps and interviews with expert stakeholders. These KPIs stem from the literature review and link to the benefits of EA through industry expert review. The study includes (1) development and validation of EA process maps adjusted to requirements from different stakeholders. (2) KPIs aligned with the EA process map, (3) identification of the drivers that can facilitate life cycle information exchange and (4) opportunities and obstacles for EA within BIM-enabled projects.

Findings

This paper depicts a viable alternative for EA process maps and KPIs in a BIM-enabled AEC design industry. The findings of this paper showcase the need for an EA within BIM with these KPIs integrated for a more effective process conforming to the current Open BIM Alliance guidance and contributing towards sustainable life cycle information flow.

Research limitations/implications

The limitation of the research is the challenge of generalising the developed EA process maps; however, it can be adjusted to fit defined organisational use. The findings deduced from the developed EA process map only show KPIs to have the ability to facilitate adequate information flow during EA.

Practical implications

The AEC industry will benefit from the findings of this primary research as the industry will be able to contrast its process maps and KPIs to those developed in the paper.

Social implications

This paper benefits the societal values in EA for the built environment in the design stages. The subsequent life cycle information flow will help achieve a consistent information set and decarbonised built environment.

Originality/value

The paper offers a practical overview of process maps and KPIs to embed EA into BIM, reducing the information loss and rework needed in the practice of this integration. The applicability of the solution is contrasted by consultation with experts and literature.

Details

Smart and Sustainable Built Environment, vol. 12 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 12 June 2020

Le Cong Thuan

The purpose of this paper is to examine the mediating role of task-efficacy and information exchange in linking the relationship between developmental feedback and employee…

Abstract

Purpose

The purpose of this paper is to examine the mediating role of task-efficacy and information exchange in linking the relationship between developmental feedback and employee creativity. In addition, this current paper tests the moderating role of innovative climate in reinforcing the effects of task-efficacy and information exchange on employee creativity.

Design/methodology/approach

This current research used a time-lagged questionnaire survey to reduce the potential problem of common method variance. The sample size of this study was 305 employees from information technology companies in southern Vietnam. This research undertook a hierarchical regression analysis to test the hypotheses.

Findings

The results found that task-efficacy and information exchange fully meditated the relationship between developmental feedback and employee creativity. Furthermore, innovative climate positively moderated the effects of task-efficacy and information exchange on employees’ creative performance.

Originality/value

This current paper is one of the first studies to examine task-efficacy as a motivational mechanism and information exchange as a cognitive mechanism for understanding the relationship between developmental feedback and employee creativity. This paper is also one of the first attempts to investigate whether innovative climate reinforces the effects of task-efficacy and information exchange on employee creativity.

Details

International Journal of Organizational Analysis, vol. 29 no. 2
Type: Research Article
ISSN: 1934-8835

Keywords

Article
Publication date: 26 June 2019

Marjan Sadeghi, Jonathan Weston Elliott, Nick Porro and Kelly Strong

This paper aims to represent the results of a case study to establish a building information model (BIM)-enabled workflow to capture and retrieve facility information to deliver…

1633

Abstract

Purpose

This paper aims to represent the results of a case study to establish a building information model (BIM)-enabled workflow to capture and retrieve facility information to deliver integrated handover deliverables.

Design/methodology/approach

The Building Handover Information Model (BHIM) framework proposed herein is contextualized given the Construction Operation Information Exchange (COBie) and the level of development schema. The process uses Autodesk Revit as the primary BIM-authoring tool and Dynamo as an add-in for extending Revit’s parametric functionality, BHIM validation, information retrieval and documentation in generating operation and maintenance (O&M) deliverables in the end-user requested format.

Findings

Given the criticality of semantics for model elements in the BHIM and for appropriate interoperability in BIM collaboration, each discipline should establish model development and exchange protocols that define the elements, geometrical and non-geometrical information requirements and acceptable software applications early in the design phase. In this case study, five information categories (location, specifications, warranty, maintenance instructions and Construction Specifications Institute MasterFormat division) were identified as critical for model elements in the BHIM for handover purposes.

Originality/value

Design- and construction-purposed BIM is a standard platform in collaborative architecture, engineering and construction practice, and the models are available for many recently constructed facilities. However, interoperability issues drastically restrict implementation of these models in building information handover and O&M. This study provides essential input regarding BIM exchange protocols and collaborative BIM libraries for handover purposes in collaborative BIM development.

Details

Journal of Facilities Management , vol. 17 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Book part
Publication date: 26 August 2019

Nai-Wen Chi

This study proposes a multilevel framework to test the mechanisms and boundary conditions of the relationships between positive group affective tone (PGAT) and individual/team…

Abstract

Purpose

This study proposes a multilevel framework to test the mechanisms and boundary conditions of the relationships between positive group affective tone (PGAT) and individual/team creativity.

Design/Methodology/Approach

Data are collected from 122 research and development (R&D) teams (including 305 members and 122 team leaders). Hierarchical linear modeling analyses and hierarchical regression analyses are performed to test hypotheses.

Findings

The results show that PGAT facilitates individual creativity via enhanced work engagement, and increases team creativity via team information exchange. Supporting the substituting perspective, we found that the positive indirect effects of PGAT on individual/team creativity were attenuated when supervisory support is high.

Research Limitations/Implications

Although all variables were collected at the same time and the individual-level variables were collected from the same source, our findings highlight the mechanisms explaining the beneficial effects of PGAT on individual/team creativity, and how supervisory support can substitute for such effects.

Practical Implications

In order to make the individuals and teams more creative, the organizations need to promote PGAT via the selection of appropriated leader and members or team social events. Moreover, supervisors support is particularly salient in enhancing team creativity when PGAT is low.

Originality/Value

This study is the one of the first study to test the motivational/social mechanisms linking the relationship between PGAT and individual/team creativity, and the competing theoretical perspectives regarding how supervisory support can moderate the PGAT–creativity linkage.

1 – 10 of over 105000