Search results

1 – 10 of 228
Article
Publication date: 27 January 2022

Marjan Sadeghi, Jonathan Weston Elliott and Mohammed Hashem Mehany

Successful implementation of a building information modeling (BIM) for building operation and maintenance (O&M) requires purposeful, early-design identification of…

Abstract

Purpose

Successful implementation of a building information modeling (BIM) for building operation and maintenance (O&M) requires purposeful, early-design identification of end-user-specific model exchange requirements. This paper aims to provide a semantic data-rich classification system for model objects to convey facilities management (FM) requirements in BIM guidelines in support of efficient FM-BIM data workflows.

Design/methodology/approach

A modularized, repeatable and technical solution for semantic requirements of BIM exchange objects was developed through ontology-based data mapping of the industry foundation classes. The proposed solution further contextualizes syntax per the buildingSMART Data Dictionary schema and provides an implementation agreement to address the quality issues of discipline BIMs and establish consistent modeling and naming conventions to facilitate automated BIM data workflow.

Findings

The level of semantics (LOS) development framework and the results of LOS implementation focusing on a building mechanical system case project are presented and discussed to showcase the increased efficiency resulting from its implementation throughout the BIM data management workflows.

Originality/value

This study represents a pioneering effort to create and implement the LOS schema as a modularized solution in support of automatic BIM data creation, adjustment, verification and transition across the design, construction and O&M workflows of a large owner organization in the Midwest USA.

Article
Publication date: 6 October 2021

Kofi Asabere Bediako Asare, Rui Liu and Chimay J. Anumba

This paper aims to present a review of research developments relating to the application of building information modeling (BIM) to facilities management (FM). It sheds light on…

Abstract

Purpose

This paper aims to present a review of research developments relating to the application of building information modeling (BIM) to facilities management (FM). It sheds light on major technical and organizational issues with the view of identifying how existing BIM for FM knowledge applies to large capital projects.

Design/methodology/approach

The study adopted a literature search approach to retrieve relevant articles which were subjected to keyword analysis to enable categorization of extant BIM for FM research into appropriate sub-domains. A qualitative analysis of 94 BIM for FM-related literature was carried out in addition to a review of 9 capital project-related articles, leading to the establishment of research trends, gaps and future directions.

Findings

The review found that research in the BIM-FM integration field is predominantly technology and process-oriented, with less attention paid to people or organizational aspects. Therefore, there is a need for expanding the knowledge base in this direction. Several future research directions were identified to lay the foundations for research on BIM application to FM in large capital projects and other application areas for interested researchers. These future directions were categorized under the identified sub-domains of the field and mapped onto two generic activities, i.e. technical integration and business integration, involved in technology adoption by organizations.

Originality/value

The main contribution of this study is the categorization of existing research on BIM for FM, leading to the identification of research gaps concerning the initiation and implementation of BIM for FM in large capital projects. As a secondary benefit, this study has validated some sub-domains of the BIM for the FM research field identified in previous review papers using an empirical approach. This validation of defined sub-domains is useful for an emerging research field as it provides a common understanding of trends and specific application areas.

Article
Publication date: 7 February 2019

Manish K. Dixit, Varusha Venkatraj, Mohammadreza Ostadalimakhmalbaf, Fatemeh Pariafsai and Sarel Lavy

The purpose of this study is to investigate factors that impede the integration of facilities management (FM) into building information modeling (BIM) technology. The use of BIM

6087

Abstract

Purpose

The purpose of this study is to investigate factors that impede the integration of facilities management (FM) into building information modeling (BIM) technology. The use of BIM technology in the commercial construction industry has grown enormously in recent years. Its application to FM, however, is still limited. The literature highlights issues that hinder BIMFM integration, which are studied and discussed in detail in this paper.

Design/methodology/approach

A review of literature is conducted to identify and categorize key issues hampering the application of BIM to FM. This paper has also designed a questionnaire based on a literature review and surveyed FM professionals at two industry events. Using the collected responses, these issues are analyzed and discussed using non-parametric statistical analyses.

Findings

A total of 16 issues are identified through the literature review of 54 studies under the four categories of BIM-execution and information-management, technological, cost-based and legal and contractual issues. The results of the survey of FM professionals (with 57 complete responses) reveal that the single most important issue is the lack of FM involvement in project phases when BIM is evolving.

Originality/value

The findings of this study could assist the construction industry (e.g. building-material and equipment manufacturers, design professionals, general contractors, construction managers, owners and facility managers) with creating guidelines that would help in BIMFM integration. BIM is a virtual database that contains important design and construction information, which can be used for effective and efficient life cycle management if building data are captured completely and accurately with a facility manager’s involvement.

Article
Publication date: 20 November 2017

Ruwini Edirisinghe, Kerry Anne London, Pushpitha Kalutara and Guillermo Aranda-Mena

Building information modelling (BIM) is increasingly being adopted during construction projects. Design and construction practices are adjusting to the new system. BIM is intended…

4506

Abstract

Purpose

Building information modelling (BIM) is increasingly being adopted during construction projects. Design and construction practices are adjusting to the new system. BIM is intended to support the entire project life-cycle: the design and construction phases, and also facility management (FM). However, BIM-enabled FM remains in its infancy and has not yet reached its full potential. The purpose of this paper is to identify major aspects of BIM in order to derive a fully BIM-enabled FM process.

Design/methodology/approach

In total, 207 papers were classified into main and subordinate research areas for quantitative analysis. These findings were then used to conceptualise a BIM-enabled FM framework grounded by innovation diffusion theory for adoption, and for determining the path of future research.

Findings

Through an extensive literature review, the paper summarises many benefits and challenges. Major aspects of BIM are identified in order to describe a BIM-enabled FM implementation process grounded by innovation diffusion theory. The major research areas of the proposed framework include: planning and guidelines; value realisation; internal leadership and knowledge; procurement; FM; specific application areas; data capture techniques; data integration; knowledge management; and legal and policy impact. Each element is detailed and is supported by literature. Finally, gaps are highlighted for investigation in future research.

Originality/value

This paper systematically classifies and evaluates the existing research, thus contributing to the achievement of the ultimate vision of BIM-enabled FM. The proposed framework informs facility managers, and the BIM-enabled FM implementation process. Further, the holistic survey identifies gaps in the body of knowledge, revealing avenues for future research.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 December 2023

Nahathai Boontae and Mongkol Ussavadilokrit

Effective facility management (FM) can reduce environmental effects on buildings throughout their life cycle. This study aims to investigate the challenges in implementing…

Abstract

Purpose

Effective facility management (FM) can reduce environmental effects on buildings throughout their life cycle. This study aims to investigate the challenges in implementing building information modelling (BIM) for FM in government buildings in Thailand.

Design/methodology/approach

Eight government-building facility experts were interviewed using an in-depth interview method to identify FM challenges. The collected qualitative data were analysed via thematic analysis to ensure data saturation. The final questionnaire was designed with 45 FM problems, classified into management, technical and human resource problems, to collect quantitative data from 54 government FM officers. The data were used to prioritise the severity and frequency of the FM problems using the severity index (SI) and relative importance index (RII).

Findings

Management problems have the highest impact, with an average SI of 0.285, followed by human resource (average SI = 0.266) and technical (average SI = 0.264) problems.

Originality/value

This study identifies the government-building FM problems in Thailand that are critical to the development of a BIM execution plan (BEP) guideline. The findings can facilitate strategy development for government-building operations and management in line with the public procurement and supply administration of Thailand. These findings can serve as a guideline to inform the development of a BIM Roadmap for integration into the national digital roadmap and the Thailand 4.0 policy to mitigate construction-related environmental and climate issues.

Details

Property Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 16 December 2019

Sandra T. Matarneh, Mark Danso-Amoako, Salam Al-Bizri, Mark Gaterell and Rana T. Matarneh

This paper aims to identify a generic set of information requirements for facilities management (FM) systems, which should be included in BIM as-built models for efficient…

1710

Abstract

Purpose

This paper aims to identify a generic set of information requirements for facilities management (FM) systems, which should be included in BIM as-built models for efficient information exchange between BIM and FM systems, and to propose a process to identify, verify and collect the required information for use in FM systems during the project’s lifecycle.

Design/methodology/approach

Both qualitative and quantitative approaches were applied at different stages of the study’s sequential design. The collection and analysis of qualitative data was based on an extensive literature review of similar studies, standards, best practices and case study documentation. This was followed by a questionnaire survey of 191 FM practitioners in the UK. This formed the background of the third stage, which was the development of the information management process to streamline information exchange between building information models and FM systems.

Findings

The study identifies a generic list of information requirements of building information models to support FM systems. In addition, the study presents an information management process that generates a specific database for FM systems using an open data format.

Originality/value

The existing literature focuses on specific building types (educational buildings) or specific information requirements related to particular systems (mechanical systems). The existing standards, guidelines and best practices focus on the information requirements to support the operations and maintenance (O&M) phase in general. This study is different from previous studies because it develops a set of specific information requirements for building information models to support FM systems. FM organisations and owners can use the proposed list of information requirements as a base to generate specific data output for their FM systems’ input, to decrease the redundant activity of manual data entry and focus their efforts on key activities.

Article
Publication date: 9 June 2023

Sidney Newton, Phillippa Carnemolla and Simon Darcy

The provision of an accessible and inclusive built environment is both a common regulatory requirement for architects and facilities managers, and a critical issue of equitable…

Abstract

Purpose

The provision of an accessible and inclusive built environment is both a common regulatory requirement for architects and facilities managers, and a critical issue of equitable access for people with disability. Post Occupancy Evaluation (POE) is key to ensuring appropriate building accessibility is provided and maintained. Improved Building Information Modelling (BIM) integration with Facilities Management (FM) will enable more effective POE over time. This study aims to define and demonstrate the practicability and utility of a particular configuration of emerging BIM and related digital technologies, applied in the field.

Design/methodology/approach

A field study approach is applied to investigate the practicability and utility of the technology configuration and POE procedures. A proposed technology configuration is applied to evaluate 21 accessible bathrooms across three university buildings in Sydney, Australia. First, a checklist of technical functionality for a POE of accessible bathrooms particular to the field study FM context is established. The checklist is based on a review of recent literature, relevant standards, best practice guidelines, expert opinions, and the organisational requirements. Then, a technical and procedural approach to POE and BIM integration with FM is defined and applied in the field. Finally, a quantitative analysis of the results is presented and discussed relative to both the particular and general FM contexts.

Findings

The use of low-cost BIM and related technologies can usefully be applied in the field to promote a more progressive integration of BIM with FM and provide enhanced baseline models for ongoing POE. A rudimentary risk assessment of key accessible bathroom features (in the context of this field study) identified that the Toilet: toilet rolls location is unsatisfactory across all bathrooms surveyed and represents an immediate and high-risk failing. Other high-risk issues highlighted in this study included: Approach: access; Entrance: door fittings and security; and Layout: hazards.

Practical implications

This study offers a blue-print for building practitioners to adopt and progressively integrate low-cost BIM and related technologies with extant FM systems. The study also promotes an improved approach to effective POE practice in general, and to the assessment of accessible bathrooms in particular.

Originality/value

Recent reviews highlight key barriers to BIM integration with FM and significant limitations to current POE practice. Proposals for BIM integration with FM tend to focus on the comprehensive use of BIM. This study demonstrates the practicability and utility of a more progressive approach to BIM adoption and integration with FM in general. The study is also novel in that it shows how low-cost BIM and related technologies can be used as a baseline reference for ongoing POE. Building practitioners can adopt and adapt the technology configuration and approach to support a range of POE applications. This field study has identified immediate and high-risk potential failings of the accessible bathrooms provided on one university campus in Sydney, Australia.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 18 July 2020

Melanie Stride, Carol K.H. Hon, Rui Liu and Bo Xia

Adoption of building information modelling (BIM) in facilities management (FM) provides an information platform to store and exchange asset data. Quantity Surveyors, with cost…

1284

Abstract

Purpose

Adoption of building information modelling (BIM) in facilities management (FM) provides an information platform to store and exchange asset data. Quantity Surveyors, with cost management expertise, are increasingly involved in FM roles in the operation phase. However, no study has been conducted on how BIM may assist Quantity Surveyors when contracted in FM roles. This study aims to identify the potential benefits and challenges of using BIM by Quantity Surveyors in FM roles.

Design/methodology/approach

Interviews were conducted with eight professionals from an international built and natural asset design and management company and its FM business partner in Australia.

Findings

Lack of complete and accurate data was the main issue faced by Quantity Surveyors in FM. The benefits of BIM in FM were digitizing and storing asset information and developing a cost database that would be useful for Quantity Surveyors, whereas challenges included keeping model data up to date, cost, industry resistance to change and contractors' lack of model use.

Originality/value

This study contributes to revealing the niche adoption of BIM by Quantity Surveyors in FM and identifying the issues faced by Quantity Surveyors in FM roles using BIM. It contributes to the knowledge of BIM adoption in post-construction. Findings will be useful to develop strategies for adopting BIM in FM and supporting Quantity Surveyors' roles in FM.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 July 2023

Mohammad A. Hassanain, Abdullah Ehtesham Akbar, Muizz O. Sanni-Anibire and Adel Alshibani

This paper aims to present an assessment of the challenges of using building information modeling (BIM) in the facilities management (FM) practice in Saudi Arabia.

Abstract

Purpose

This paper aims to present an assessment of the challenges of using building information modeling (BIM) in the facilities management (FM) practice in Saudi Arabia.

Design/methodology/approach

A review of the relevant literature was conducted, resulting in identifying 31 potential challenges to BIM utilization in FM, which were grouped into five main categories. These challenges were used to design a five-point Likert scale questionnaire survey to obtain the feedback of experts in the FM domain in Saudi Arabia. The professionals that participated in the survey consisted of facilities managers, maintenance managers and BIM experts. The results obtained were analyzed based on the Effect Index (EI) approach. The questionnaire also contained an open-ended section for more qualitative data.

Findings

The results of the EI revealed that the top most influential challenges include “integration of the building systems design with BIM”, “definition of handover requirements and integration requirements between FM and BIM” and “getting appropriate and accurate information”. The category with the highest EI was the “challenges pertaining to the execution of BIM in FM”.

Practical implications

The paper outlines the critical challenges influencing the utilization of BIM in FM in Saudi Arabia and, as a result, could facilitate the development of implementation plans for BIM utilization. Thus, the study results have practical implications for stakeholders in the building industry.

Originality/value

The study contributes to the building industry through its discussion of the challenges of BIM utilization in FM and thus has the potential to increase the level of awareness of stakeholders in the industry.

Details

Facilities , vol. 41 no. 13/14
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 9 May 2016

Margarida Jerónimo Barbosa, Pieter Pauwels, Victor Ferreira and Luís Mateus

Building information modeling (BIM) is most often used for the construction of new buildings. By using BIM in such projects, collaboration among stakeholders in an architecture…

3479

Abstract

Purpose

Building information modeling (BIM) is most often used for the construction of new buildings. By using BIM in such projects, collaboration among stakeholders in an architecture, engineering and construction project is improved. To even further improve collaboration, there is a move toward the production and usage of BIM standards in various countries. These are typically national documents, including guides, protocols, and mandatory regulations, that introduce guidelines about what information should be exchanged at what time between which partners and in what formats. If a nation or a construction team agrees on these guidelines, improved collaboration can come about on top of the collaboration benefits induced by the mere usage of BIM. This scenario might also be targeted for interventions in existing buildings. The paper aims to discuss these issues.

Design/methodology/approach

In this paper, the authors investigate the general content and usage of existing BIM standards for new constructions, describing specifications about BIM deliverable documents, modeling, and collaboration procedures. The authors suggest to what extent the content in the BIM standards can also be used for interventions in existing buildings. These suggestions rely heavily on literature study, supported by on-site use case experiences.

Findings

From this research, the authors can conclude that the existing standards give a solid basis for BIM collaboration in existing building interventions, but that they need to be extended in order to be of better use in any intervention project in an existing building. This extension should happen at: data modeling level: other kinds of data formats need to be considered, coming from terrestrial laser scanning and automatic digital photogrammetry tools; at data exchange level: exchange requirements should take explicit statements about modeling tolerances and levels of (un)certainty; and at process modeling level: business process models should include information exchange processes from the very start of the building survey (BIM→facility management→BIM or regular audit).

Originality/value

BIM environments are not often used to document existing buildings or interventions in existing buildings. The authors propose to improve the situation by using BIM standards and/or guidelines, and the authors give an initial overview of components that should be included in such a standard and/or guideline.

Details

Structural Survey, vol. 34 no. 2
Type: Research Article
ISSN: 0263-080X

Keywords

1 – 10 of 228