Open Access
Article
Publication date: 21 July 2023

Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…

1074

Abstract

Purpose

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.

Design/methodology/approach

Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.

Findings

The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.

Practical implications

The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.

Originality/value

The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1075

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 30 August 2022

Petteri Annunen, Juho Tella, Sini Pekki and Harri Haapasalo

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the…

1859

Abstract

Purpose

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the elements for creating the maintenance capability and the process to be used in construction life cycle projects for buildings.

Design/methodology/approach

An inductive and qualitative research method was used to construct the proposed process based on the literature and 18 interviews in two large construction companies.

Findings

The results indicate that the maintenance phase is usually overlooked during the design and construction phases, and capabilities are not systematically built. In particular, processes are lacking in data management, causing severe problems in maintenance.

Originality/value

This study presents a process including key requirements and activities for creating maintenance capability in conjunction with the design and construction phases, which is novel to the literature. The validated process can be adapted based on the needs of the construction company.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 29 October 2021

Petteri Annunen, Erno Mustonen, Janne Harkonen and Harri Haapasalo

This study aims to focus on creating sales capability as part of new product development (NPD). The aim is to define generic requirements for building sales capability as a part…

2904

Abstract

Purpose

This study aims to focus on creating sales capability as part of new product development (NPD). The aim is to define generic requirements for building sales capability as a part of NPD and to propose a necessary process by defining key activities for sales readiness.

Design/methodology/approach

An inductive and qualitative research method was used to construct a sales capability creation process based on a current state analysis in seven companies.

Findings

The results indicate that the status of companies’ sales-related planning varies during the NPD, and the related activities are not systematically managed. Considering sales early is necessary to enable a smooth and cost-efficient start of sales, and to avoid unnecessary delays and problems in other functions. At the same time, the companies recognise the need for improvement.

Originality/value

This paper presents a potential process including systematic activities for creating sales capability in conjunction with product development, which is novel to the literature. The proposed process is applicable in aligning industrial company needs.

Details

Journal of Business & Industrial Marketing, vol. 36 no. 13
Type: Research Article
ISSN: 0885-8624

Keywords

Open Access
Article
Publication date: 31 May 2022

Laura Saukko, Kirsi Aaltonen and Harri Haapasalo

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

2138

Abstract

Purpose

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

Design/methodology/approach

A theoretical construct of, referred in this study as integration capability framework is elaborated following a systematic literature review. Thereafter, an integration capability self-assessment model, based on maturity thinking, is derived from the theoretical framework. The self-assessment model is further developed and tested for validity within five inter-organizational project networks in cooperation with industry practitioners, representing construction, industrial engineering, and mining sectors.

Findings

The results show that inter-organizational projects can use the developed model in self-assessing the maturity levels of various integration mechanisms, thus the state of integration capability at any point in time during inter-organizational projects.

Originality/value

This study is an attempt to identify how the integration capability dimensions can be self-assessed in inter-organizational projects, through the maturity levels of various integration mechanisms. The results offer insights for both academics and project management practitioners.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 12 May 2022

Kari-Pekka Tampio, Harri Haapasalo and Farooq Ali

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the…

9123

Abstract

Purpose

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the authors aim to identify the implications that stakeholder management has on value creation in a hospital project.

Design/methodology/approach

The research method is qualitative. Empirical data were collected in three cycles: project internal documentation, thematic interviews and survey. The literature related to hospital projects, stakeholder analysis and management, stakeholder salience and landscape is summarised, informing the qualitative design of the study.

Findings

The authors noted the importance of project-specific stakeholder identification, salience analysis and landscape description. The regulatory, formal and contractual stakeholders give an over-simplistic picture on stakeholder map. The operative stakeholder map and landscape describe the complexity, uncertainty, dynamism and institutional context inducing the challenges for the stakeholder management. There is an evident potential of utilising the stakeholder landscape and its elements in the resulting collaborative value creation in hospital projects. Multiple and changing stakeholders with differing expectations are an important opportunity to improve the value creation process.

Originality/value

Stakeholder management has recently attracted much attention in the industrial project setting. This research attempts to identify the operative stakeholder landscape in a large hospital project, not to mention its impact on value creation. This study offers a framework that can help academics and project management practitioners tackle the challenges amongst project stakeholders.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 27 January 2023

Farooq Ali and Harri Haapasalo

This article aims to address the confusion related to the meanings of interorganisational cooperation, control, coordination and collaboration in collaborative projects by…

3567

Abstract

Purpose

This article aims to address the confusion related to the meanings of interorganisational cooperation, control, coordination and collaboration in collaborative projects by developing a conceptual framework. From this, the authors aim to describe the links among these concepts in terms of development levels of stakeholder relationships. In addition, the authors aim to identify challenges and preconditions in relation to developing relationships at different levels.

Design/methodology/approach

The authors have adopted the directed approach of qualitative content analysis method to validate and extend the conceptual framework of this study. The context of this study is a large hospital construction project located in northern Finland.

Findings

The findings of this study suggest that collaboration is a multilevel process of active engagement of multiple stakeholders. These stakeholders must have a high degree of shared understanding in terms of cooperation, control and coordination to achieve the mutually desired outcomes. This study also identifies the challenges that project stakeholders could face in developing collaborative relationships and propose preconditions for the same.

Practical implications

This study provides a better understanding for project managers to manage interorganisational collaborative construction projects successfully. The outcome of this research would be beneficial to project management team to deliver dispute-free construction projects.

Originality/value

Existing practical research on the development of relationships at different levels in collaborative construction projects is limited. This study offers a framework for the same which is validated in a real-life project.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 15 May 2023

Kai Hänninen, Jouni Juntunen and Harri Haapasalo

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive…

16146

Abstract

Purpose

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive performance and vital to the long-term success of any organisation and company.

Design/methodology/approach

Using finite mixture structural equation modelling (FMSEM), the authors have classified innovation logic into latent classes. The method analyses and recognises classes for companies that have similar logic in innovation activities based on the collected data.

Findings

Through FMSEM analysis, the authors have identified three latent classes that explain the innovation logic in the Finnish construction companies – LC1: the internal innovators; LC2: the non-innovation-oriented introverts; and LC3: the innovation-oriented extroverts. These three latent classes clearly capture the perceptions within the industry as well as the different characteristics and variables.

Research limitations/implications

The presented latent classes explain innovation logic but is limited to analysing Finnish companies. Also, the research is quantitative by nature and does not increase the understanding in the same manner as qualitative research might capture on more specific aspects.

Practical implications

This paper presents starting points for construction industry companies to intensify innovation activities. It may also indicate more fundamental changes for the structure of construction industry organisations, especially by enabling innovation friendly culture.

Originality/value

This study describes innovation logic in Finnish construction companies through three models (LC1–LC3) by using quantitative data analysed with the FMSEM method. The fundamental innovation challenges in the Finnish construction companies are clarified via the identified latent classes.

Open Access
Article
Publication date: 6 June 2022

Taha Karasu, Kirsi Aaltonen and Harri Haapasalo

Integrated project delivery (IPD) and building information modeling (BIM) have been discussed as prominent collaborative concepts in recent architecture, engineering and…

4013

Abstract

Purpose

Integrated project delivery (IPD) and building information modeling (BIM) have been discussed as prominent collaborative concepts in recent architecture, engineering and construction (AEC) literature, thus recommended for more advanced value creation. However, they have been studied predominantly as discrete even though they are typically highly interrelated. This study aims to enhance collaboration in AEC projects by tracing recent trends in IPD and BIM literature by making sense of trends and by exploring how their interplay has been discussed and conceptualized.

Design/methodology/approach

This systematic literature review draws on Scopus and Web of Science as the primary databases. In total, 120 academic papers and review articles were sourced. Yet, the final sample includes 71 sources from the past decade (2011–2020), focusing on both IPD and BIM.

Findings

This study identifies 11 interrelated and overlapping themes that are indicative of trends in the recent IPD and BIM literature. This research found that among the identified themes, the clusters of sustainability, transformation and increasing the competence level of staff in the AEC industry, in addition to the concept of quality, require more extensive research in the context of IPD and BIM. Additionally, this study identifies four different approaches to the interplay of IPD and BIM, indicating an absence of scholarly consistency.

Originality/value

Based on the systematic analysis of the recent literature, this study indicates that IPD and BIM have several joint fundamental cornerstones. It is evident that both concepts support the implementation of each other. The success of implementing either one is strongly related to the other. Additionally, we have not found earlier systematic literature reviews that examine the interplay between IPD and BIM in the recent AEC literature.

Open Access
Article
Publication date: 22 February 2022

Solmaz Mansoori, Janne Harkonen and Harri Haapasalo

This study aims to facilitate consistency of information in building information modelling (BIM) and address the current BIM gaps through the perspectives of the productization…

2294

Abstract

Purpose

This study aims to facilitate consistency of information in building information modelling (BIM) and address the current BIM gaps through the perspectives of the productization concept and product structure (PS).

Design/methodology/approach

The study follows a conceptual research approach in conjunction with a single case study. First, the previous studies on BIM implementation, productization and PS are reviewed. Further, a case study is used to analyse the current state of productization in the construction sector and develop a functional PS for construction.

Findings

A Part-Phase-Elements Matrix is proposed as a construction-specific PS to facilitate consistency in information and to enhance BIM. The proposed matrix provides new avenues to facilitate consistent information exchange through the interconnection between conceptual PS and standard building objects library, and encourage collaborative communication between stakeholders.

Originality/value

This study explores the core of the productization concept and PS as means to facilitate consistency of information and thus address the current gaps in BIM. This as building projects progressively move towards systematic modular and prefabricated construction where the flow of reliable information about product and construction offerings becomes increasingly important.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords