Article
Publication date: 8 December 2020

Seyed Ashkan Zarghami and Jantanee Dumrak

The methods presently used for project stakeholder analysis have typically followed two distinct patterns: (1) a project-centric approach that places a project at the center, and…

1489

Abstract

Purpose

The methods presently used for project stakeholder analysis have typically followed two distinct patterns: (1) a project-centric approach that places a project at the center, and subsequently, concentrates on dyadic relationships between the project and its stakeholders; (2) a network theory-based approach that emphasizes on the interconnections within the network of project stakeholders. The main contention of this study is built upon the premise that neither the sole analysis of dyadic relationships between a project and its stakeholders nor the stand-alone use of the network theory methods is adequate for reliable analysis of stakeholders.

Design/methodology/approach

This article proposes a model that bases the salience of stakeholders on their relationships with the project as well as on their interdependencies in the project. In doing so, this work explores the potential of a Fuzzy Inference System (FIS) to provide a comprehensive picture of stakeholder analysis. Using a real-world biodiversity project, this paper analyses the project stakeholders based on their possession of various attributes as well as the extent to which each individual stakeholder influences the entire connected network of all stakeholders.

Findings

A salient feature of the proposed FIS model is its ability to provide a high capacity for analyzing the results. The model is able to generate the input–output relationship surface view for stakeholder analysis. Further, unlike the traditional project stakeholder analysis methods that are linear, the proposed model is strongly nonlinear. This implies that change in the input variables of the fuzzy-based model is not expected to lead to a proportional change in the model output.

Practical implications

Two practical implications can be drawn from the presented stakeholder analysis model. First, confronted with mounting pressure to understand the stakeholder environment and to effectively manage stakeholders, project managers need to establish a sound stakeholder management strategy. The stakeholder analysis model developed herein casts a wider net for the critical ranking of stakeholders in a project, thereby providing a more accurate prioritization of the stakeholders. Second, while stakeholders independently require managerial attention, understanding the effect of competing and cooperative stakeholder interactions are unarguably of great importance. The presented model prompts the project managers to recognize not only the influence of key stakeholders on the project but also the interactions of multiple stakeholders within the stakeholder network.

Originality/value

The proposed stakeholder analysis model possesses several desirable features. First, it is not constrained to capturing only stakeholder attributes discussed in the example project provided in this study. The model is flexible and adaptable to all business and management contexts. Second, the stakeholder mapping in the model is not a function of a sole attribute but rather a cumulative effect of multiple stakeholder attributes. In fact, the power of the suggested model lies in its ability to incorporate the three aspects of stakeholder theory into a single model. Third, the presented model builds a quantitative and qualitative picture of the stakeholder salience. The suggested FIS model is capable of processing both qualitative perception of stakeholder attributes and quantitative analysis of the network of stakeholder interactions. This allows for a more comprehensive and synergistic utilization of model inputs.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 July 2022

Xin Xia and Pengcheng Xiang

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among…

Abstract

Purpose

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among stakeholders, public skepticism, and opposition. However, most existing studies have not focused on the dynamic analysis of integrating social risks in these stages. This study developed a dynamic analysis approach to explore the dynamics of critical social risk factors and related stakeholders of megaprojects and built the managerial maps for various stakeholders.

Design/methodology/approach

Based on the social analysis network (SNA), a dynamic network analysis approach for understanding the dynamics of social risk and related stakeholders has been developed by literature and case analysis. The approach comprises the following steps: (1) generating social risk–stakeholder networks in different stages; (2) analysis of the critical stakeholders and social risk factors; (3) dynamic analysis of social risk factors; and (4) developing social risk management maps for various stakeholders. To verify the feasibility and effectiveness of the approach, 40 megaprojects from China were analyzed.

Findings

According to the results, the local government is a critical stakeholder during all stages, inadequate information promotion (IIP) and imperfect communication and coordination mechanism (ICCM) are key social risk sources throughout the megaproject life cycle. Furthermore, the management maps for government organizations, project implementation groups, and external stakeholders were constructed.

Originality/value

This research has three contributions. First, a dynamic analysis approach of stakeholder-associated social risks in megaprojects is developed, which enriches the social risk management theory of megaprojects and provides inspiration for future research focus. Second, the social risk–stakeholder networks and critical social risks in different stages are confirmed to provide a more valid and accurate picture of social risk management in megaprojects. Third, the social risk managerial maps for different stakeholders built in this research will be beneficial for governments, project implementation groups, and external stakeholders to optimize management strategies.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 November 2021

Farzana Asad Mir and Davar Rezania

This paper aims to unpack the relationship between the interactive use of project control systems (PCS) and project performance by examining the role of stakeholder analysis

Abstract

Purpose

This paper aims to unpack the relationship between the interactive use of project control systems (PCS) and project performance by examining the role of stakeholder analysis effectiveness in enacting this relationship. A conceptual framework was developed based on the stakeholder theory and the levers of control framework.

Design/methodology/approach

Partial least square-structural equation modelling analysis was conducted on the cross-sectional questionnaire data collected from 109 information technology (IT) projects.

Findings

The interactive use of PCS enables project managers to effectively deal with the stakeholders-related uncertainty, and stakeholder analysis effectiveness partially mediates the positive relationship between the interactive use of PCS and IT project performance.

Originality/value

This study extends the project control literature by explaining the positive relationship between the interactive use of PCS and project performance. The findings contribute to the stakeholder analysis literature by operationalizing the stakeholder analysis effectiveness construct and identifying it as a new mediator between the interactive use of PCS and project performance.

Details

Journal of Accounting & Organizational Change, vol. 18 no. 5
Type: Research Article
ISSN: 1832-5912

Keywords

Article
Publication date: 10 October 2016

Arun Abraham Elias

This paper aims to illustrate the usefulness of stakeholder analysis for managing Lean Six Sigma (LSS) projects effectively.

3363

Abstract

Purpose

This paper aims to illustrate the usefulness of stakeholder analysis for managing Lean Six Sigma (LSS) projects effectively.

Design/methodology/approach

This research is based on an LSS case study that was initiated in a New Zealand public sector organisation.

Findings

A ten-step stakeholder analysis framework was applied to a public sector organisation in New Zealand. This analysis identified the stakeholders and their stakes, analysed the efficiency of their stakeholder management processes and evaluated the effectiveness of transactions between the stakeholders and the LSS project management. It also captured the changing salience of stakeholders during an LSS project.

Practical implications

The stakeholder analysis framework illustrated in this paper provides a practical toolset for managers involved in LSS projects.

Originality/value

Although some LSS experts have conducted a preliminary stakeholder analysis, the LSS literature lacks concrete examples of a thorough stakeholder analysis. This study tries to address this research gap by illustrating a stakeholder analysis framework for a New Zealand-based LSS project.

Details

International Journal of Lean Six Sigma, vol. 7 no. 4
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 30 October 2019

Anna Wojewnik-Filipkowska, Anna Dziadkiewicz, Wioleta Dryl, Tomasz Dryl and Robert Bęben

Public involvement is essential in the creation of effective local strategies for the development of a sustainable built environment, yet there has been little research on…

2819

Abstract

Purpose

Public involvement is essential in the creation of effective local strategies for the development of a sustainable built environment, yet there has been little research on stakeholder motivation and engagement in the creation of infrastructure-project value, in the entire life cycle of a given project, while different markets show that overlooking stakeholders can negatively affect the success of an infrastructure project. The purpose of this paper is to fill the theory-practice gap that has been discerned, and thus study how early public involvement determines the success of an infrastructure project, which is identified with its value creation (effectiveness, sustainability and utility).

Design/methodology/approach

This research entails a combination of methods. A case study analysis allowed observation of the role the stakeholders play and of how the relationships, perspectives, expectations and risks, along with other soft issues, continue to affect projects. The case study required comprehensive examination of project documentation and conduction of interviews. To collect data, focused group interviews and semi-structured interviews were used, supported with direct questionnaire surveys.

Findings

The study provides evidence that early public engagement can contribute to infrastructure-project value (effectiveness, sustainability and utility). Practically speaking, the stakeholder analysis performed allowed proposal of a general stakeholder analysis framework for infrastructure projects. It can be implemented at each investment phase of the project life cycle, since stakeholders and their motivation may develop and/or change over time, which necessitates development of proper managerial strategies. The findings highlight the opportunities and the challenges faced by stakeholder management.

Research limitations/implications

The limitation of this study derives from the fact that the sample size was small, which was necessary for an in-depth qualitative research and application of the case study method. The observations were made on a selected case study, within a limited period of time, thus the context of the analysis as well as the stakeholder perception was subject to possible change. The research limitations concern the provisional nature of the information obtained, the cross-sectional nature of the analysis itself, and, finally, the inability to predict all future events. Ultimately, stakeholder mapping was performed for the operational phase of the investment exclusively, while the analysis was limited to identification and classification of the stakeholders, including their relationship with the project.

Practical implications

The research conclusions provide useful input for future research on development of effective strategies for management of the shareholders that are related to a given infrastructure project, in order to achieve project success. Simultaneously, from a property perspective, the research has contributed to a better understanding of the importance of infrastructure, on the part of real estate stakeholders.

Social implications

Application of the approach proposed in the study may contribute to early development and implementation of appropriate trust-building processes. The building of relationships between stakeholders enables checks and balances, promotes short- and long-term project benefits, and increases the value of a project.

Originality/value

The novelty of the research consists in the connection, as part of infrastructure projects, of the theory of consumption values and the concept of an investment cycle with the framework of stakeholder analysis.

Details

Journal of Property Investment & Finance, vol. 39 no. 3
Type: Research Article
ISSN: 1463-578X

Keywords

Book part
Publication date: 7 October 2015

Md Nuruzzaman

The objective of this study is to investigate how country risk, different political actions from the government and bureaucratic behavior influence the activities in industry…

Abstract

The objective of this study is to investigate how country risk, different political actions from the government and bureaucratic behavior influence the activities in industry supply chains (SCs) in emerging markets. The main objective of this study is to investigate the influence of these external stakeholders’ elements to the demand-side and supply-side drivers and barriers for improving competitiveness of Ready-Made Garment (RMG) industry in the way of analyzing supply chain. Considering the phenomenon of recent change in the RMG business environment and the competitiveness issues this study uses the principles of stakeholder and resource dependence theory and aims to find out some factors which influence to make an efficient supply chain for improving competitiveness. The RMG industry of Bangladesh is the case application of this study. Following a positivist paradigm, this study adopts a two phase sequential mixed-method research design consisting of qualitative and quantitative approaches. A tentative research model is developed first based on extensive literature review. Qualitative field study is then carried out to fine tune the initial research model. Findings from the qualitative method are also used to develop measures and instruments for the next phase of quantitative method. A survey is carried out with sample of top and middle level executives of different garment companies of Dhaka city in Bangladesh and the collected quantitative data are analyzed by partial least square-based structural equation modeling. The findings support eight hypotheses. From the analysis the external stakeholders’ elements like bureaucratic behavior and country risk have significant influence to the barriers. From the internal stakeholders’ point of view the manufacturers’ and buyers’ drivers have significant influence on the competitiveness. Therefore, stakeholders need to take proper action to reduce the barriers and increase the drivers, as the drivers have positive influence to improve competitiveness.

This study has both theoretical and practical contributions. This study represents an important contribution to the theory by integrating two theoretical perceptions to identify factors of the RMG industry’s SC that affect the competitiveness of the RMG industry. This research study contributes to the understanding of both external and internal stakeholders of national and international perspectives in the RMG (textile and clothing) business. It combines the insights of stakeholder and resource dependence theories along with the concept of the SC in improving effectiveness. In a practical sense, this study certainly contributes to the Bangladeshi RMG industry. In accordance with the desire of the RMG manufacturers, the research has shown that some influential constructs of the RMG industry’s SC affect the competitiveness of the RMG industry. The outcome of the study is useful for various stakeholders of the Bangladeshi RMG industry sector ranging from the government to various private organizations. The applications of this study are extendable through further adaptation in other industries and various geographic contexts.

Details

Sustaining Competitive Advantage Via Business Intelligence, Knowledge Management, and System Dynamics
Type: Book
ISBN: 978-1-78441-764-2

Keywords

Article
Publication date: 26 July 2011

Erick T. Byrd and Larry Gustke

The purpose of this paper is to investigate the use of decision tree analysis in the identification of stakeholders based on their participation in tourism and political…

2217

Abstract

Purpose

The purpose of this paper is to investigate the use of decision tree analysis in the identification of stakeholders based on their participation in tourism and political activities in a community.

Design/methodology/approach

A survey was sent to tourism stakeholders in two rural counties. Responses were collected and analyzed using the exhaustive chi‐square automatic interaction detection decision tree analysis.

Findings

Based on the results of the decision tree analysis four tourism stakeholder groups were identified based on their participation in tourism and political activities in a community: high participants, high‐moderate participants, low‐moderate participants, and low participants.

Research limitations/implications

Owing to a low response rate, an issue of non‐response bias could exist, but the information from the respondents can give insight on stakeholders in these communities. Also, the specific results of this study can only be applied to eastern North Carolina and are not generalizable to other areas.

Practical implications

Results from this study demonstrate the use of decision tree analysis in identifying community stakeholders. Using decision tree analysis tourism planners can identify stakeholder groups that will participate in tourism and political activities. With this knowledge, tourism planners can identify which stakeholder groups will be the most influential and vocal in a community with regard to tourism development.

Originality/value

Decision tree analysis is a tool for partitioning a data set based on the relationships between a set of independent variables and a dependent variable. The research reported here tests the application of decision tree analysis, an analytical technique that is not traditionally used to segment stakeholders in tourism.

Details

Journal of Place Management and Development, vol. 4 no. 2
Type: Research Article
ISSN: 1753-8335

Keywords

Article
Publication date: 6 April 2021

Bao Ngoc Nguyen, Kerry London and Peng Zhang

This paper aims to report a comprehensive analysis of literature on stakeholder relationships towards identifying patterns of relationships within the off-site construction…

Abstract

Purpose

This paper aims to report a comprehensive analysis of literature on stakeholder relationships towards identifying patterns of relationships within the off-site construction context.

Design/methodology/approach

Key scholarly databases were accessed and after a filtering process, 74 relevant papers were retrieved for analysis. The papers were analysed using qualitative content analysis and scientometric techniques through the application of software Leximancer and VOSviewer.

Findings

Research synthesis methods used in the present study generate compatible results. Through text mining analysis, the key themes identified in the off-site construction stakeholder relationships literature included “collaboration”, “building information modelling”, “social network analysis”, supply chain. As a finding by scientometric analysis, collaboration, BIM, supply chain management, housing and social network analysis were the most frequently entered keywords context of off-site construction. Regarding authorship pattern, the whole network of collaboration was fragmented into multiple isolated clusters, implying that the authors had tendency to cooperate in small groups.

Practical implications

The paper can bring together an important area of research not previously studied in detail. It will primarily assist academics in the first instance; however, the research leads to important findings that will ultimately assist policymakers and practitioners better understand factors affecting stakeholder relationships and in particular network thinking and collaborative mind-sets.

Originality/value

The review contributes a needed systematic and theoretical foundation for future stakeholder relationship studies and practices in off-site construction sector. It provides the basis for future studies and is a seminal analysis of stakeholder management and off-site construction. The scientometric methodology offers scholars a different approach to analysing and visualising literature reviews.

Article
Publication date: 24 October 2019

Felix Beske, Ellen Haustein and Peter C. Lorson

This paper aims to assess the disclosure on materiality analysis in sustainability and integrated reports through the lenses of legitimacy and stakeholder theory. The following…

5194

Abstract

Purpose

This paper aims to assess the disclosure on materiality analysis in sustainability and integrated reports through the lenses of legitimacy and stakeholder theory. The following three research questions are addressed: to what extent do companies report on their materiality analysis, what are the methods used for the analysis of the stakeholders and their topics/aspects and is there a higher disclosure of information of materiality assessment because of G4.

Design/methodology/approach

The paper uses an archival research approach and deploys content analysis. Thus, a binary disclosure index was developed that indicates whether materiality related information are mentioned and explained in detail. The sample contains 132 reports from 33 companies of the German 110 HDAX stock market index between 2014 and 2017.

Findings

The paper reveals that materiality analysis is a growing phenomenon. Nevertheless, companies disclose only a small amount of related information and fail to explain the methods for the stakeholder and topics/aspects identification. Thus, the underlying processes to define the report content remains unclear. Through the lenses of legitimacy theory, the study indicates that materiality analysis can strategically be misused to define report content without considering the interests of legitimized stakeholder groups and thus, does not improve the reports to those groups.

Practical implications

Managers are urged to regard the importance of reporting about ongoing materiality assessments, as otherwise, concerns about the overall reliability of the information presented may arise.

Social implications

Poor reporting about materiality assessments might lead to potential conflicts with stakeholders that do see their important topics not sufficiently reflected in the sustainability or integrated report.

Originality/value

This study contributes to the literature regarding materiality in sustainability and integrated reporting and uses the assumptions of disclosure theories to evaluate the disclosure of a specific disclosure item.

Details

Sustainability Accounting, Management and Policy Journal, vol. 11 no. 1
Type: Research Article
ISSN: 2040-8021

Keywords

Article
Publication date: 12 October 2018

Ka Yan Mok, Geoffrey Qiping Shen and Rebecca Yang

In response to the world’s rising awareness on sustainability, industry players and policymakers are devoting great efforts to bolster green building developments. Every green…

1465

Abstract

Purpose

In response to the world’s rising awareness on sustainability, industry players and policymakers are devoting great efforts to bolster green building developments. Every green building project (GBP) involves numerous stakeholders and potentially incompatible concerns. Despite the associated environmental, economic and social benefits, GBP developments have often confronted managerial barriers which are actually emerged from stakeholders – the actual key determinants of a project. Holistically analyzing the complexity of stakeholders in GBPs is, therefore, crucial to improving GBP management and achieving greater sustainability for all involved. The purpose of this paper is to analyze stakeholder complexity in large GBPs using a holistic framework which integrates both empirical and rationalistic analytical perspectives.

Design/methodology/approach

The complexity of stakeholders in GBPs can be considered from three aspects – identifying stakeholders, assessing stakeholder interactions and analyzing stakeholder concerns. The proposed stakeholder analysis framework uses both empirical methods (e.g. interviews and surveys) and rationalistic methods (e.g. chain referral sampling and social network analysis) to analyze GBP stakeholder complexity. Case study of a lab-enabled commercial GBP in Hong Kong was undertaken to illustrate the framework.

Findings

The framework enables a holistic, objective and effective stakeholder analysis; leading GBP leaders toward a complete understanding of project stakeholder complexity. The case study findings bring managerial insights to GBP leaders on the general SNA-related stakeholder dynamics and the important stakeholder concerns, of large Hong Kong GBPs. The findings diagnose general connectivity structures of GBP stakeholders, identify influential and peripheral actors in GBP information exchange, and suggest clues to improve their dynamics. In addition, ten key stakeholder concerns were identified, including comprehensive governmental standards and procedures, clear sustainability goals at the outset, effective stakeholder engagement, adequate design flexibility, and a “can-do” attitude of contractors and consultants – which are all vital for successful GBP development. The underlying reasons of these concerns and recommendations to addressing them were also discussed.

Originality/value

Many existing GBP stakeholder studies appear to use a single analytical perspective to assess project stakeholder complexity, but this may not gain a full understanding. The holistic stakeholder analysis framework used herein combines empiricism and rationalism. It helps to bring GBP leaders and implementers toward a more informed project decision making, a more thorough understanding of stakeholder complexity, as well as a more effective engagement of stakeholders.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 11
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 89000