Search results

1 – 10 of 888
Article
Publication date: 14 September 2023

Julia T. Thomas and Mahesh Kumar

The purpose of the paper is set to minimize the total cost of a manufacturing system when an acceptance sampling plan (ASP) is carried out in a fuzzy environment.

Abstract

Purpose

The purpose of the paper is set to minimize the total cost of a manufacturing system when an acceptance sampling plan (ASP) is carried out in a fuzzy environment.

Design/methodology/approach

A fuzzy acceptance sampling plan (FASP) is employed for the inspection of the batch of products and a fuzzy cost optimization problem is formulated.

Findings

The extent of uncertainty determines an interval for the total cost function with upper and lower bounds. The effect of variation in the ambiguity of the proportion of defectives in the probability of acceptance is determined.

Practical implications

The proposed model is specifically designed for production and supply units with ASP for attributes. Still, the proportion of defectives in the inspection process is fuzzy.

Originality/value

Fuzzy probability distribution is used to model an optimal inspection plan for a general supply chain. Economic design of supply chain under fuzzy proportion of defectives is discussed for the first time.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 3
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 1 September 2022

Rinu Sathyan, Parthiban Palanisamy, Suresh G. and Navin M.

The automotive industry appears to overcome much of its obstacles, despite the constant struggle facing COVID-19. The pandemic has resulted in significant improvements in the…

Abstract

Purpose

The automotive industry appears to overcome much of its obstacles, despite the constant struggle facing COVID-19. The pandemic has resulted in significant improvements in the habits and conduct of consumers. There is an increased preference for personal mobility. In this dynamic environment with unexpected changes and high market rivalry, automotive supply chains focus more on executing responsive strategies with minimum costs. This paper aims to identify and model the drivers to the responsiveness of automotive supply chain.

Design/methodology/approach

Seventeen drivers for supply chain responsiveness have been identified from the extensive literature, expert interview. An integrated methodology of fuzzy decision-making trial and evaluation laboratory–interpretive structural modelling (DEMATEL–ISM) is developed to establish the interrelationship between the drivers. The cause–effect relationship between the drivers was obtained through fuzzy DEMATEL technique, and a hierarchical structure of the drivers was developed using the ISM technique.

Findings

The result of the integrated methodology revealed that strategic decision-making of management, accurate forecasting of demand, advanced manufacturing system in the organisation and data integration tools are the critical drivers.

Research limitations/implications

This study has conceptual and analytical limitations. In this study, a limited number of drivers are examined for supply chain responsiveness. Further research may examine the role of other key performance indicators in the broad field of responsiveness in the automotive supply chain or other industry sectors. Future study can uncover the interrelationships and relative relevance of indicators using advanced multi-criteria decision-making methodologies.

Originality/value

The authors proposed an integrated methodology that will be benefitted to the supply chain practitioners and automotive manufacturers to develop management strategies to improve responsiveness. This study further helps to compare the responsiveness of the supply chain between various automotive manufacturers.

Article
Publication date: 9 February 2024

Runze Yu and Li Ma

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has…

138

Abstract

Purpose

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has greatly affected human life. The research aims to establish a risk evaluation index system for MICSC in EPC projects, exploring what risk factors lead to risk incidents and measure the importance and causality of all these risk factors.

Design/methodology/approach

The research applies a combination of quantitative and qualitative analysis methodology to process data sequentially. In the first place, risk factors for MICSC in EPC projects are extracted and identified from literature survey and expert interviews. In the second place, an integration model fuzzy Analytic Hierarchy Process (f-AHP) and fuzzy Decision-making Trial and Evaluation Laboratory (f-DEMATEL) is constructed to comprehensively analyze all these risk factors.

Findings

12 primary risk factors and 36 secondary risk factors comprise the risk evaluation index system for MICSC in EPC projects from 178 literature and 5 professionals. The results indicate that Political Situation (F1), Social Security (F2) and Management Mode (F8) are critical risk factors, where F1 and F2 are cause factors and F8 is an effect factor.

Originality/value

There are three main contributions of this paper. First and foremost, from the perspective of the research content, no other study has been able to assess risk factors for MICSC in EPC projects, while embedding nine phases of the whole project life cycle and six subjects of stakeholders into a risk evaluation index system. Additionally, from the perspective of research method, a combined model incorporating f-AHP and f-DEMATEL is constructed to avoid the one-sidedness of a single model. Last but not least, from the perspective of practical significance, focusing on the critical risk factors, a series of effective measures are formulated to make appropriate management decisions for nodal enterprises of MICSC, which can improve their risk management capabilities.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 23 February 2024

Maria Angela Butturi, Francesco Lolli and Rita Gamberini

This study presents the development of a supply chain (SC) observatory, which is a benchmarking solution to support companies within the same industry in understanding their…

Abstract

Purpose

This study presents the development of a supply chain (SC) observatory, which is a benchmarking solution to support companies within the same industry in understanding their positioning in terms of SC performance.

Design/methodology/approach

A case study is used to demonstrate the set-up of the observatory. Twelve experts on automatic equipment for the wrapping and packaging industry were asked to select a set of performance criteria taken from the literature and evaluate their importance for the chosen industry using multi-criteria decision-making (MCDM) techniques. To handle the high number of criteria without requiring a high amount of time-consuming effort from decision-makers (DMs), five subjective, parsimonious methods for criteria weighting are applied and compared.

Findings

A benchmarking methodology is presented and discussed, aimed at DMs in the considered industry. Ten companies were ranked with regard to SC performance. The ranking solution of the companies was on average robust since the general structure of the ranking was very similar for all five weighting methodologies, though simplified-analytic hierarchy process (AHP) was the method with the greatest ability to discriminate between the criteria of importance and was considered faster to carry out and more quickly understood by the decision-makers.

Originality/value

Developing an SC observatory usually requires managing a large number of alternatives and criteria. The developed methodology uses parsimonious weighting methods, providing DMs with an easy-to-use and time-saving tool. A future research step will be to complete the methodology by defining the minimum variation required for one or more criteria to reach a specific position in the ranking through the implementation of a post-fact analysis.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 17 April 2024

Zul-Atfi Ismail

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance…

Abstract

Purpose

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.

Findings

This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.

Originality/value

The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.

Details

Facilities , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 2 January 2024

Wenlong Cheng and Wenjun Meng

This study aims to solve the problem of job scheduling and multi automated guided vehicle (AGV) cooperation in intelligent manufacturing workshops.

Abstract

Purpose

This study aims to solve the problem of job scheduling and multi automated guided vehicle (AGV) cooperation in intelligent manufacturing workshops.

Design/methodology/approach

In this study, an algorithm for job scheduling and cooperative work of multiple AGVs is designed. In the first part, with the goal of minimizing the total processing time and the total power consumption, the niche multi-objective evolutionary algorithm is used to determine the processing task arrangement on different machines. In the second part, AGV is called to transport workpieces, and an improved ant colony algorithm is used to generate the initial path of AGV. In the third part, to avoid path conflicts between running AGVs, the authors propose a simple priority-based waiting strategy to avoid collisions.

Findings

The experiment shows that the solution can effectively deal with job scheduling and multiple AGV operation problems in the workshop.

Originality/value

In this paper, a collaborative work algorithm is proposed, which combines the job scheduling and AGV running problem to make the research results adapt to the real job environment in the workshop.

Details

Robotic Intelligence and Automation, vol. 44 no. 1
Type: Research Article
ISSN: 2754-6969

Keywords

Article
Publication date: 12 March 2024

Hui Zhao, Simeng Wang and Chen Lu

With the continuous development of the wind power industry, wind power plant (WPP) has become the focus of resource development within the industry. Site selection, as the initial…

Abstract

Purpose

With the continuous development of the wind power industry, wind power plant (WPP) has become the focus of resource development within the industry. Site selection, as the initial stage of WPP development, is directly related to the feasibility of construction and the future revenue of WPP. Therefore, the purpose of this paper is to study the siting of WPP and establish a framework for siting decision-making.

Design/methodology/approach

Firstly, a site selection evaluation index system is constructed from four aspects of economy, geography, environment and society using the literature review method and the Delphi method, and the weights of each index are comprehensively determined by combining the Decision-making Trial and Evaluation Laboratory (DEMATEL) and the entropy weight method (EW). Then, prospect theory and the multi-criteria compromise solution ranking method (VIKOR) are introduced to rank the potential options and determine the best site.

Findings

China is used as a case study, and the robustness and reliability of the methodology are demonstrated through sensitivity analysis, comparative analysis and ablation experiment analysis. This paper aims to provide a useful reference for WPP siting research.

Originality/value

In this paper, DEMATEL and EW are used to determine the weights of indicators, which overcome the disadvantage of single assignment. Prospect theory and VIKOR are combined to construct a decision model, which also considers the attitude of the decision-maker and the compromise solution of the decision result. For the first time, this framework is applied to WPP siting research.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Abstract

Details

The Integrated Application of Effective Approaches in Supply Chain Networks
Type: Book
ISBN: 978-1-83549-631-2

Article
Publication date: 9 December 2022

Ying Zhou, Yu Wang, Chenshuang Li, Lieyun Ding and Cong Wang

This study aimed to propose a performance-oriented approach of automatically generative design and optimization of hospital building layouts in consideration of public health…

601

Abstract

Purpose

This study aimed to propose a performance-oriented approach of automatically generative design and optimization of hospital building layouts in consideration of public health emergency, which intended to conduct reasonable layout design of hospital building to meet different performance requirements for both high efficiency during normal periods and low risk in the pandemic.

Design/methodology/approach

The research design follows a sequential mixed methodology. First, key points and parameters of hospital building layout design (HBLD) are analyzed. Then, to meet the requirements of high efficiency and low risk, adjacent preference score and infection risk coefficient are constructed as constraints. On this basis, automatic generative design is conducted to generate building layout schemes. Finally, multi-objective deviation analysis is carried out to obtain the optimal scheme of hospital building layouts.

Findings

Automatic generative design of building layouts that integrates adjacent preferences and infection risks enables hospitals to achieve rapid transitions between normal (high efficiency) and pandemic (low risk) periods, which can effectively respond to public health emergencies. The proposed approach has been verified in an actual project, which can help systematically explore the solution for better decision-making.

Research limitations/implications

The form of building layouts is limited to rectangles, and future work can explore conducting irregular layouts into optimization for the framework of generative design.

Originality/value

The contribution of this paper is the developed approach that can quickly and effectively generate more hospital layout alternatives satisfying high operational efficiency and low infection risk by formulating space design rules, which is of great significance in response to public health emergency.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 February 2024

Swarup Mukherjee, Anupam De and Supriyo Roy

Identifying and prioritizing supply chain risk is significant from any product’s quality and reliability perspective. Under an input-process-output workflow, conventional risk…

Abstract

Purpose

Identifying and prioritizing supply chain risk is significant from any product’s quality and reliability perspective. Under an input-process-output workflow, conventional risk prioritization uses a risk priority number (RPN) aligned to the risk analysis. Imprecise information coupled with a lack of dealing with hesitancy margins enlarges the scope, leading to improper assessment of risks. This significantly affects monitoring quality and performance. Against the backdrop, a methodology that identifies and prioritizes the operational supply chain risk factors signifies better risk assessment.

Design/methodology/approach

The study proposes a multi-criteria model for risk prioritization involving multiple decision-makers (DMs). The methodology offers a robust, hybrid system based on the Intuitionistic Fuzzy (IF) Set merged with the “Technique for Order Performance by Similarity to Ideal Solution.” The nature of the model is robust. The same is shown by applying fuzzy concepts under multi-criteria decision-making (MCDM) to prioritize the identified business risks for better assessment.

Findings

The proposed IF Technique for Order Preference by Similarity to the Ideal Solution (TOPSIS) for risk prioritization model can improve the decisions within organizations that make up the chains, thus guaranteeing a “better quality in risk management.” Establishing an efficient representation of uncertain information related to traditional failure mode and effects analysis (FMEA) treatment involving multiple DMs means identifying potential risks in advance and providing better supply chain control.

Research limitations/implications

In a company’s supply chain, blockchain allows data storage and transparent transmission of flows with traceability, privacy, security and transparency (Roy et al., 2022). They asserted that blockchain technology has great potential for traceability. Since risk assessment in supply chain operations can be treated as a traceability problem, further research is needed to use blockchain technologies. Lastly, issues like risk will be better assessed if predicted well; further research demands the suitability of applying predictive analysis on risk.

Practical implications

The study proposes a hybrid framework based on the generic risk assessment and MCDM methodologies under a fuzzy environment system. By this, the authors try to address the supply chain risk assessment and mitigation framework better than the conventional one. To the best of their knowledge, no study is found in existing literature attempting to explore the efficacy of the proposed hybrid approach over the traditional RPN system in prime sectors like steel (with production planning data). The validation experiment indicates the effectiveness of the results obtained from the proposed IF TOPSIS Approach to Risk Prioritization methodology is more practical and resembles the actual scenario compared to those obtained using the traditional RPN system (Kim et al., 2018; Kumar et al., 2018).

Originality/value

This study provides mathematical models to simulate the supply chain risk assessment, thus helping the manufacturer rank the risk level. In the end, the authors apply this model in a big-sized organization to validate its accuracy. The authors validate the proposed approach to an integrated steel plant impacting the production planning process. The model’s outcome substantially adds value to the current risk assessment and prioritization, significantly affecting better risk management quality.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

1 – 10 of 888