Search results

1 – 10 of over 3000
Open Access
Article
Publication date: 7 December 2023

Yuxia Yan, Na Wang and Yun Cao

Coastal zone ecological restoration project is of great significance to alleviate marine ecological degradation. Evaluating the effect of coastal ecological restoration projects…

Abstract

Purpose

Coastal zone ecological restoration project is of great significance to alleviate marine ecological degradation. Evaluating the effect of coastal ecological restoration projects and identifying the obstacle factors affecting their restoration level can provide an empirical basis for future Marine ecological restoration projects.

Design/methodology/approach

However, due to the initial stage of coastal zone ecological restoration projects, the actual monitoring data of coastal zone ecological restoration is relatively lacking. Based on the CRITIC-TOPSIS (combination of CRITIC method and TOPSIS method) method, combined with the subjective perception of the public and the actual data of the restoration project, this paper proposes an evaluation method of the coastal zone ecological restoration effect to obtain the specific implementation effect of the coastal zone ecological restoration project. The main obstacle factors affecting the evaluation of coastal ecological restoration effect are identified by using the obstacle degree model.

Findings

This paper conducted an empirical study on the restoration of sandy shoreline and coastal wetland in Qinhuangdao city. Based on the data of restoration projects and the subjective perception of ecological restoration by the public in Qinhuangdao city, the research results showed that the coastal zone ecological restoration effect of Qinhuangdao city was general. The quality of the restoration project and the public perception have an important influence on the evaluation of the restoration effect. Improving the quality of the restoration project, strengthening the public's participation in ecological restoration and allowing the public to better participate in the ecological restoration of the coastal zone can improve the effect of ecological restoration of the coastal zone in an all-round way.

Originality/value

The research results of this paper have a guiding role in the ecological restoration of coastal cities in the future, and also have a demonstration and reference role for the assessment of the effect of ecological restoration of coastal zones.

Details

Marine Economics and Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2516-158X

Keywords

Article
Publication date: 2 January 2024

Emma Mihocic, Koorosh Gharehbaghi, Per Hilletofth, Kong Fah Tee and Matt Myers

In successfully meeting city and metropolitan growth, sustainable development is compulsory. Sustainability is a must-focus for any project, particularly for large and mega rail…

Abstract

Purpose

In successfully meeting city and metropolitan growth, sustainable development is compulsory. Sustainability is a must-focus for any project, particularly for large and mega rail infrastructure. This paper aims to investigate to what degree social, environmental and economic factors influence the government when planning sustainable rail infrastructure projects. To respond to such a matter, this paper focuses on two Australian mega-rail projects: the South West Rail Link (SWRL) and the Mernda Rail Extension (MRE).

Design/methodology/approach

As the basis of an experimental evaluation framework strengths, weaknesses, opportunities and threats (SWOT) and factor analysis were used. These two methods were specifically selected as comparative tools for SWRL and SWRL projects, to measure their overall sustainability effect.

Findings

Using factor analysis, in the MRE, the factors of network capacity, accessibility, employment and urban planning were seen frequently throughout the case study. However, politics and economic growth had lower frequencies throughout this case study. This difference between the high-weighted factors is likely a key element that determined the SWRL to be more sustainable than the MRE. The SWOT analysis showed the strengths the MRE had over the SWRL such as resource use and waste management, and natural habitat preservation. These two analyses have shown that overall, calculating the sustainability levels of a project can be subjective, based on the conditions surrounding various analysis techniques.

Originality/value

This paper first introduces SWRL and MRE projects followed by a discussion about their overall sustainable development. Both projects go beyond the traditional megaprojects' goal of improving economic growth by developing and enhancing infrastructure. Globally, for such projects, sustainability measures are now considered alongside the goal of economic growth. Second, SWOT and factor analysis are undertaken to further evaluate the complexity of such projects. This includes their overall sustainable development vision alignment with environmental, economic and social factors.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 12 May 2023

Hongliang Yu, Zhen Peng, Zirui He and Chun Huang

The purpose of this paper is to establish a maturity evaluation model for the application of construction steel structure welding robotics suitable for the actual situation and…

113

Abstract

Purpose

The purpose of this paper is to establish a maturity evaluation model for the application of construction steel structure welding robotics suitable for the actual situation and specific characteristics of engineering projects in China and then to assess the maturity level of the technology in the application of domestic engineering projects more scientifically.

Design/methodology/approach

The research follows a qualitative and quantitative analysis method. In the first stage, the structure of the maturity model is constructed and the evaluation index system is designed by using the ideas of the capability maturity model and WSR methodology for reference. In the second stage, the design of the evaluation process and the selection of evaluation methods (analytic hierarchy process method, multi-level gray comprehensive evaluation method). In the third stage, the data are collected and organized (preparation of questionnaires, distribution of questionnaires, questionnaire collection). In the fourth stage, the established maturity evaluation model is used to analyze the data.

Findings

The evaluation model established by using multi-level gray theory can effectively transform various complex indicators into an intuitive maturity level or score status. The conclusion shows that the application maturity of building steel structure welding robot technology in this project is at the development level as a whole. The maturity levels of “WuLi – ShiLi – RenLi” are respectively: development level, development level, between starting level and development level. Comparison of maturity evaluation values of five important factors (from high to low): environmental factors, technical factors, management factors, benefit factors, personnel and group factors.

Originality/value

In this paper, based on the existing research related to construction steel structure welding robot technology, a quantitative and holistic evaluation of the application of construction steel structure welding robot technology in domestic engineering projects is conducted for the first time from a project perspective by designing a maturity evaluation index system and establishing a maturity evaluation model. This research will help the project team to evaluate the application level (maturity) of the welding robot in the actual project, identify the shortcomings and defects of the application of this technology, then improve the weak links pertinently, and finally realize the gradual improvement of the overall application level of welding robot technology for building steel structure.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 May 2023

Minggong Zhang, Xiaolong Xue, Ting Luo, Mengmeng Li and Xiaoling Tang

This study aims to establish an evaluation method for cross-regional major infrastructure project (CRMIP) supportability. The focus is to identify evaluation indicators from a…

Abstract

Purpose

This study aims to establish an evaluation method for cross-regional major infrastructure project (CRMIP) supportability. The focus is to identify evaluation indicators from a complexity perspective and develop an evaluation model using qualitative and quantitative methods. Case studies are carried out to verify the reliability of the evaluation model, thereby providing theoretical and practical guidance for CRMIP operations and maintenance (O&M).

Design/methodology/approach

Guided by the idea of complexity management, the evaluation indicators of CRMIP supportability are determined through literature analysis, actual O&M experience and expert interviews. A combination of qualitative and quantitative methods, consisting of sequential relationship analysis, entropy weighting, game theory and cloud model, is developed to determine the indicator weights. Finally, the evaluation model is used to evaluate the supportability of the Hong Kong–Zhuhai–Macao Bridge (HZMB), which tests the rationality of the model and reveals its supportability level.

Findings

The results demonstrate that CRMIPs' supportability is influenced by 6 guideline-level and 18 indicator-level indicators, and the priority of the influencing factors includes “organization,” “technology,” “system,” “human resources,” “material system,” and “funding.” As for specific indicators, “organizational objectives,” “organizational structure and synergy mechanism,” and “technical systems and procedures” are critical to CRMIPs' O&M supportability. The results also indicate that the supportability level of the HZMB falls between good and excellent.

Originality/value

Under the guidance of complexity management thinking, this study proposes a supportability evaluation framework based on the combined weights of game theory and the cloud model. This study provides a valuable reference and scientific judgment for the health and safety of CRMIPs' O&M.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 March 2024

Ibrahim Yahaya Wuni

Sustainable construction re-engineers the conventional project lifecycle to integrate sustainability solutions. The additional sustainability requirements introduce new layers of…

Abstract

Purpose

Sustainable construction re-engineers the conventional project lifecycle to integrate sustainability solutions. The additional sustainability requirements introduce new layers of complexity, challenges and risks that if unaddressed, can derail the gains in sustainable construction projects. This study developed a multidimensional risk assessment model for sustainable construction projects in the United Arab Emirates (UAE).

Design/methodology/approach

The research activities a comprised comprehensive literature review to shortlist relevant risks, an analysis of the probability – impact rating of the shortlisted risks – and the development of a risk assessment model for SC projects in the UAE. The model is developed based on the multicriteria framework and mathematical formulation of the fuzzy synthetic evaluation approach.

Findings

The developed model quantified the overall risk level in sustainable construction projects to be 3.71 on a 5-point Likert scale, indicating that investment in SC projects in the UAE is risky and should be carefully managed. The developed model further revealed that each of the risk groups, comprising management (3.82), technical (3.78), stakeholder (3.68), regulatory (3.66), material (3.53) and economic risks (3.502), presents a significant threat to realizing outcomes typical of SC projects.

Originality/value

This study developed a multidimensional risk assessment model capable of objectively quantifying the overall risk level and provides decision support to project teams to improve risk management in sustainable construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 April 2024

Mihaela Brindusa Tudose, Flavian Clipa and Raluca Irina Clipa

This study proposes an analysis of the performance of companies that have assumed the responsibility of facilitating the digitalization of economic activities. Because of their…

Abstract

Purpose

This study proposes an analysis of the performance of companies that have assumed the responsibility of facilitating the digitalization of economic activities. Because of their potential to accelerate digitization, these companies have been financially supported. The monitoring of the performances recorded by these companies, including the evaluation of the impact of different determining factors, meets both the needs of the financiers (concerned with the evaluation of the efficiency of the use of nonreimbursable financing) and the needs of continuous improvement of the activities of the companies in the field.

Design/methodology/approach

The study assesses performance dynamics and the impact of its determinants. The model allows achieving a simplified vision of performance and its determinants, supporting decision-makers in the management process. The construction of an estimation model based on the multiple regression method was considered. Robustness tests were performed on the results, using parametric and nonparametric tests.

Findings

The results of the analysis at the level of the extended sample indicated that, during the analyzed period, the economic and commercial performances decreased, and significant influences in this respect include the financing structure, sales dynamics and volume of receivables. The analysis at the level of the restricted sample confirmed these interdependencies and provided additional evidence of the impact of other determinants.

Research limitations/implications

The study contributes both to performance research and to the assessment of the prospects for accelerating digitalization in support of economic activities. Since the empirical research was carried out on a sample of Romanian companies that provide services in information technology, which accessed nonreimbursable financing, the representativeness of the results is limited to this sector. For the analyzed sample, the study provides support for improving performance.

Practical implications

The results of the study prove to be useful from a microeconomic and macroeconomic perspective as well, as they provide evidence on the performance of companies that have implemented information and communication technology (ICT) projects and on the efficiency of the use of non-reimbursable funding dedicated to business support.

Originality/value

The study fills the literature gap regarding the performance of companies that have developed ICT projects and received grant funding for the implementation of these projects. The literature review indicated that there are few studies conducted on these companies, which did not include Romanian companies.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Open Access
Article
Publication date: 13 March 2024

Lina Gharaibeh, Kristina Eriksson and Björn Lantz

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to…

Abstract

Purpose

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to investigate BIM feasibility and evaluate investment worth to elucidate and develop the current understanding of BIM merit. The aim of the study is to propose a research agenda towards a more holistic perspective of BIM use incorporating quantifying investment return.

Design/methodology/approach

An in-depth examination of research patterns has been conducted to identify challenges in the assessment of the investment value and return on investment (ROI) for BIM in the construction industry. A total of 75 research articles were considered for the final literature review. An evaluation of the literature is conducted using a combination of bibliometric analysis and systematic reviews.

Findings

This study, which analysed 75 articles, unveils key findings in quantifying BIM benefits, primarily through ROI calculation. Two major research gaps are identified: the absence of a standardized BIM ROI method and insufficient exploration of intangible benefits. Research focus varies across phases, emphasizing design and construction integration and exploring post-construction phases. The study categorizes quantifiable factors, including productivity, changes and rework reduction, requests for information reduction, schedule efficiency, safety, environmental sustainability and operations and facility management. These findings offer vital insights for researchers and practitioners, enhancing understanding of ’BIM’s financial benefits and signalling areas for further exploration in construction.

Originality/value

The ’study’s outcomes offer the latest insights for researchers and practitioners to create effective approaches for quantifying ’BIM’s financial benefits. Additionally, the proposed research agenda aims to improve the current limited understanding of BIM feasibility and investment worth evaluation. Results of the study could assist practitioners in overcoming limitations associated with BIM investment and economic evaluations in the construction industry.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 18 May 2023

Yousong Wang, Enqin Gong, Yangbing Zhang, Yao Yao and Xiaowei Zhou

The need for infrastructure is growing as urbanization picks up speed, and the infrastructure REITs financing model has been crucial in reviving the vast infrastructure stock…

Abstract

Purpose

The need for infrastructure is growing as urbanization picks up speed, and the infrastructure REITs financing model has been crucial in reviving the vast infrastructure stock, alleviating the pressure on government funds and diversifying investment entities. This study aims to propose a framework to better assess the risks of infrastructure REITs, which can serve for the researchers and the policy makers to propose risk mitigation strategies and policy recommendations more purposively to facilitate successful implementation and long-term development of infrastructure REITs.

Design/methodology/approach

The infrastructure REITs risk evaluation index system is established through literature review and factor analysis, and the optimal comprehensive weight of the index is calculated using the combination weight. Then, a risk evaluation cloud model of infrastructure REITs is constructed, and experts quantify the qualitative language of infrastructure REITs risks. This paper verifies the feasibility and effectiveness of the model by taking a basic REITs project in China as an example. This paper takes infrastructure REITs project in China as an example, to verify the feasibility and effectiveness of the cloud evaluation method.

Findings

The research outcome shows that infrastructure REITs risks manifest in the risk of policy and legal, underlying asset, market, operational and credit. The main influencing factors in terms of their weights are tax policy risk, operation and management risk, liquidity risk, termination risk and default risk. The financing project is at a higher risk, and the probability of risk is 64.2%.

Originality/value

This research contributes to the existing body of knowledge by supplementing a set of scientific and practical risk evaluation methods to assess the potential risks of infrastructure REITs project, which contributes the infrastructure financing risk management system. Identify key risk factors for infrastructure REITs with underlying assets, which contributes to infrastructure REITs project management. This research can help relevant stakeholders to control risks throughout the infrastructure investment and financing life cycle, provide them with reference for investment and financing decision-making and promote more sustainable and healthy development of infrastructure REITs in developing countries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 February 2024

Runze Yu and Li Ma

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has…

138

Abstract

Purpose

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has greatly affected human life. The research aims to establish a risk evaluation index system for MICSC in EPC projects, exploring what risk factors lead to risk incidents and measure the importance and causality of all these risk factors.

Design/methodology/approach

The research applies a combination of quantitative and qualitative analysis methodology to process data sequentially. In the first place, risk factors for MICSC in EPC projects are extracted and identified from literature survey and expert interviews. In the second place, an integration model fuzzy Analytic Hierarchy Process (f-AHP) and fuzzy Decision-making Trial and Evaluation Laboratory (f-DEMATEL) is constructed to comprehensively analyze all these risk factors.

Findings

12 primary risk factors and 36 secondary risk factors comprise the risk evaluation index system for MICSC in EPC projects from 178 literature and 5 professionals. The results indicate that Political Situation (F1), Social Security (F2) and Management Mode (F8) are critical risk factors, where F1 and F2 are cause factors and F8 is an effect factor.

Originality/value

There are three main contributions of this paper. First and foremost, from the perspective of the research content, no other study has been able to assess risk factors for MICSC in EPC projects, while embedding nine phases of the whole project life cycle and six subjects of stakeholders into a risk evaluation index system. Additionally, from the perspective of research method, a combined model incorporating f-AHP and f-DEMATEL is constructed to avoid the one-sidedness of a single model. Last but not least, from the perspective of practical significance, focusing on the critical risk factors, a series of effective measures are formulated to make appropriate management decisions for nodal enterprises of MICSC, which can improve their risk management capabilities.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 November 2023

Visar Hoxha, Hasan Dinçer and Serhat Yuksel

This study aims to investigate the strategic priorities of green building projects and analyze energy consumption alternatives in green residence projects using two innovative…

Abstract

Purpose

This study aims to investigate the strategic priorities of green building projects and analyze energy consumption alternatives in green residence projects using two innovative methods.

Design/methodology/approach

This study uses two methods, decision-making trial and evaluation laboratory (DEMATEL) to measure strategic priorities and golden-cut quantum spherical fuzzy technique for order preference by similarity to the ideal solution (TOPSIS) to analyze energy consumption alternatives.

Findings

The study reveals that sustainability and atmosphere are the most significant factors in determining the priorities of green residence projects, whereas innovation has a limited impact on addressing environmental challenges in the building sector. The ranking of energy use alternatives shows that sustainability issues and atmosphere quality of space heating and cooking are the top priorities, whereas other factors like white goods, water heating, lighting and space cooling are ranked lower.

Originality/value

This paper offers a significant contribution to the understanding of green buildings by introducing innovative methodological approaches. Theoretically, it uses the DEMATEL to enhance traditional analytical frameworks, marking a novel effort in understanding green residence projects. In addition, the golden-cut quantum spherical fuzzy TOPSIS method is introduced, offering a comprehensive decision-making framework for green projects, considering factors like energy consumption and economic feasibility. This combination of methodologies provides a holistic evaluation, emphasizing sustainability in green building construction. This study reveals untapped potential for environmental sustainability and energy efficiency, enriching the existing knowledge base.

Details

International Journal of Energy Sector Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1750-6220

Keywords

1 – 10 of over 3000