Search results
1 – 10 of 86
The purpose of this study is to define and develop a new technological development path for latecomer firms in developing countries.
Abstract
Purpose
The purpose of this study is to define and develop a new technological development path for latecomer firms in developing countries.
Design/methodology/approach
An analytical framework for development based on the technological capability (TC) dimensions is developed and examined in the drilling sector. Since the process of TC accumulation is dynamic, the case study approach is the best method for an exploratory theory-building study. Through a comparative case study of two Iranian drilling contractors, a new path for the technological development of latecomer oil service companies is proposed.
Findings
The study of two cases indicates that despite having similar scope and levels of TC, one of them demonstrated superior technical performance. To address this difference, the concept of operational efficiency is introduced which is considered the outcome of increasing the depth of TC.
Practical implications
Although upgrading the level of technological and innovation capability is an important path for technological development, latecomers that suffer from various disadvantages can perform their routine activities with superior performance and develop through their basic operational/production capabilities. Also, specialized indicators designed for assessing the level and depth of TC in the drilling industry have important insights for evaluating the technological and competitive position of oil service companies.
Originality/value
To the best of the author’s knowledge, this study takes the first step in defining and elaborating on the concept of depth of TC as a development path for latecomers. It also introduced a novel approach to the global operational/production efficiency frontier as a target for their catch-up.
Details
Keywords
Zehui Bu, Jicai Liu and Xiaoxue Zhang
Subway systems are highly susceptible to external disturbances from emergencies, triggering a series of consequences such as the paralysis of the internal network transportation…
Abstract
Purpose
Subway systems are highly susceptible to external disturbances from emergencies, triggering a series of consequences such as the paralysis of the internal network transportation functions, causing significant economic and safety losses to cities. Therefore, it is necessary to analyze the factors affecting the resilience of the subway system to reduce the impact of disaster incidents.
Design/methodology/approach
Using the interval type-2 fuzzy linguistic term set and the K-medoids clustering algorithm, this paper improves the Decision-Making Trial and Evaluation Laboratory (DEMATEL) method to construct a subway resilience factor analysis model for emergencies. Through comparative analysis, this study confirms the superior performance of the proposed approach in enhancing the precision of the DEMATEL method.
Findings
The results indicate that the operation and management level of emergency command organizations is the key resilience factors of subway operations in China. Furthermore, based on real case analyses, the corresponding suggestions and measures are put forward to improve the overall operation resilience level of the subway.
Originality/value
This paper identifies four emergency scenarios and 15 resilience factors affecting subway operations through literature review and expert consultation. The improved fuzzy DEMATEL method is applied to explore the levels of influence and causal mechanisms among the resilience factors of the subway system under the four emergency scenarios.
Details
Keywords
Diya Yan, Xianbo Zhao, Pushpitha Kalutara and Zhou Jiang
Construction workers’ safety compliance is attracting considerable critical attention as it plays a decisive role in improving safety on construction sites. This study applied the…
Abstract
Purpose
Construction workers’ safety compliance is attracting considerable critical attention as it plays a decisive role in improving safety on construction sites. This study applied the concept of differentiating safety compliance into deep compliance (DC) and surface compliance (SC) and relied on trait activation theory to investigate the effects of situational awareness (SA) and emotional intelligence (EI) on safety compliance.
Design/methodology/approach
Cross-sectional survey data were collected from 239 construction workers in Australia, and these responses were statistically analyzed using the partial least squares structural equation modeling (PLS-SEM) to validate the proposed model.
Findings
Results revealed that both EI and SA positively impacted DC and negatively impacted SC. Moreover, SA partially mediated the link between EI and two types of safety compliance (DC and SC). The outcomes showed that construction workers’ ability in regulating their emotions could influence their perception of environmental cues and the effectiveness of safety compliance behavior.
Originality/value
This study sheds light on investigating the antecedents of DC and SC from the perspective of trait activation theory. The findings also have practical implications, stating that construction site managers or safety professionals should consider providing training on construction workers’ EI and SA to enhance their willingness to expend conscious efforts in complying with safety rules and procedures, which can lead to improved safety outcomes.
Details
Keywords
Junlong Peng and Qi Zhang
The replenishment of construction materials heavily relies on the functioning of heavy machinery, which often leads to confusion and negotiations among construction work groups…
Abstract
Purpose
The replenishment of construction materials heavily relies on the functioning of heavy machinery, which often leads to confusion and negotiations among construction work groups regarding the allocation rights of these materials. When multiple groups require the same construction materials, they often struggle to determine whether the delivered materials are intended for their own use or if they have encroached upon supplies designated for others. Such uncertainties and negotiations frequently result in delays in construction progress and have the potential to escalate into conflicts. To minimize misunderstandings among work groups and mitigate the risk of severe safety consequences, it is crucial to understand the decision-making processes involved in the interaction between work groups.
Design/methodology/approach
This paper adopts a game theory approach to examine the interactions among work groups from a safety perspective. Quantum response equilibrium (QRE), as a specialized form of game with incomplete information, is assumed to govern the behavior of work groups in this study. By conducting a questionnaire survey, interactive scenarios were simulated. A resource overlap scenario for high-altitude construction is established, with the key factors being the importance of construction materials, the time required to supplement materials, whether managers are present and the climate within the groups. The model parameters were estimated using the expectation–maximization algorithm. Additionally, individual traits and safety awareness are surveyed in the questionnaire, further explaining the results of the game.
Findings
The findings indicate that the likelihood of conflicts between work groups under resource overlap can be quantified. The radical behavior of construction work groups exhibits a positive correlation with the importance of construction materials and the time required for material replenishment. Furthermore, the presence of a safety climate and the oversight of management personnel play a significant role in maintaining the composure of construction work groups. The expanded results of the questionnaire demonstrate that there is considerable room for improvement in workers' safety awareness, and management approaches can be further enhanced to prevent unsafe behaviors from occurring.
Originality/value
A novel game theory model was developed to evaluate the behavior of construction groups in situations of resource overlap. This model offers practical suggestions to improve safety performance and efficiency in construction projects.
Details
Keywords
Zhiyu Dong, Ruize Qin, Ping Zou, Xin Yao, Peng Cui, Fan Zhang and Yizhou Yang
The occupational health risk associated with the production of prefabricated concrete components is often overlooked. This paper will use a damage assessment and cyclic mitigation…
Abstract
Purpose
The occupational health risk associated with the production of prefabricated concrete components is often overlooked. This paper will use a damage assessment and cyclic mitigation (DACM) model to provide individualized exposure risk assessment and corresponding mitigation management measures for workers who are being exposed.
Design/methodology/approach
The DACM model is proposed based on the concept of life cycle assessment (LCA). The model uses Monte-Carlo simulation for uncertainty risk assessment, followed by quantitative damage assessment using disability-adjusted life year (DALY). Lastly, sensitivity analysis is used to identify the parameters with the greatest impact on health risks.
Findings
The results show that the dust concentration is centered around the mean, and the fitting results are close to normal distribution, so the mean value can be used to carry out the calculation of risk. However, calculations using the DACM model revealed that there are still some work areas at risk. DALY damage is most severe in concrete production area. Meanwhile, the inhalation rate (IR), exposure duration (ED), exposure frequency (EF) and average exposure time (AT) showed greater impacts based on the sensitivity analysis.
Originality/value
Based on the comparison, the DACM model can determine that the potential occupational health risk of prefabricated concrete component (PC) factory and the risk is less than that of on-site construction. It synthesizes field research and simulation to form the entire assessment process into a case-base system with the depth of the cycle, which allows the model to be continuously adjusted to reduce the occupational health damage caused by production pollution exposure.
Details
Keywords
Xiaobo Shi, Yan Liu, Kunkun Ma, Zixin Gu, Yaning Qiao, Guodong Ni, Chibuzor Ojum, Alex Opoku and Yong Liu
The purpose is to identify and evaluate the safety risk factors in the coal mine construction process.
Abstract
Purpose
The purpose is to identify and evaluate the safety risk factors in the coal mine construction process.
Design/methodology/approach
The text mining technique was applied in the stage of safety risk factor identification. The association rules method was used to obtain associations with safety risk factors. Decision-Making Trial and Evaluation Laboratory (DEMATEL) and Interpretative Structural Modeling (ISM) were utilized to evaluate safety risk factors.
Findings
The results show that 18 safety risk factors are divided into 6 levels. There are 12 risk transmission paths in total. Meanwhile, unsafe behavior and equipment malfunction failure are the direct causes of accidents, and inadequate management system is the basic factor that determines the safety risk status.
Research limitations/implications
Due to the limitation of the computational matrix workload, this article only categorizes numerous lexical items into 18 factors. Then, the workshop relied on a limited number of experts; thus, the findings may be potentially biased. Next, the accident report lacks a universal standard for compilation, and the use of text mining technique may be further optimized. Finally, since the data are all from China, subsequent cross-country studies should be considered.
Social implications
The results can help China coal mine project managers to have a clear understanding of safety risks, efficiently carry out risk hazard identification work and take timely measures to cut off the path of transmission with risks identified in this study. This helps reduce the economic losses of coal mining enterprises, thus improving the safety standards of the entire coal mining industry and the national standards for coal mine safety policy formulation.
Originality/value
Coal mine construction projects are characterized by complexity and difficulties in construction. Current research on the identification and assessment of safety risk factors in coal mine construction is insufficient. This study combines objective and systematic research approaches. The findings contribute to the safety risk management of China coal mine construction projects by providing a basis for the development of safety measures.
Details
Keywords
Allison Traylor, Julie Dinh, Chelsea LeNoble, Jensine Paoletti, Marissa Shuffler, Donald Wiper and Eduardo Salas
Teams across a wide range of contexts must look beyond task performance to consider the affective, cognitive and behavioral health of their members. Despite much interest in team…
Abstract
Purpose
Teams across a wide range of contexts must look beyond task performance to consider the affective, cognitive and behavioral health of their members. Despite much interest in team health in practice, consideration of team health has remained scant from a research perspective. The purpose of this paper is to address these issues by advancing a definition and model of team health.
Design/methodology/approach
The authors review relevant literature on team stress, processes and emergent states to propose a definition and model of team health.
Findings
The authors advance a definition of team health, or the holistic, dynamic compilation of states that emerge and interact as a team resource to buffer stress. Further, the authors argue that team health improves outcomes at both the individual and team level by improving team members’ well-being and enhancing team effectiveness, respectively. In addition, the authors propose a framework integrating the job demands-resources model with the input-mediator-output-input model of teamwork to illustrate the behavioral drivers that promote team health, which buffers teams stress to maintain members’ well-being and team effectiveness.
Originality/value
This work answers calls from multidisciplinary industries for work that considers team health, providing implications for future research in this area.
Details
Keywords
Sonali Khatua, Manoranjan Dash and Padma Charan Mishra
Ores and minerals are extracted from the earth’s crust depending on the type of deposit. Iron ore mines come under massive deposit patterns and have their own mine development and…
Abstract
Purpose
Ores and minerals are extracted from the earth’s crust depending on the type of deposit. Iron ore mines come under massive deposit patterns and have their own mine development and life cycles. This study aims to depict the development and life cycle of large open-pit iron ore mines and the intertwined organizational design of the departments/sections operated within the industry.
Design/methodology/approach
Primary data were collected on the site by participant observation, in-depth interviews of the field staff and executives, and field notes. Secondary data were collected from the literature review to compare and cite similar or previous studies on each mining activity. Finally, interactions were conducted with academic experts and top field executives to validate the findings. An organizational ethnography methodology was employed to study and analyse four large-scale iron ore mines of India’s largest iron-producing state, Odisha, from January to April 2023.
Findings
Six stages were observed for development and life cycle, and the operations have been depicted in a schematic diagram for ease of understanding. The intertwined functioning of organizational set-up is also discovered.
Originality/value
The paper will benefit entrepreneurs, mining and geology students, new recruits, and professionals in allied services linked to large iron ore mines. It offers valuable insights for knowledge enhancement, operational manual preparation and further research endeavours.
Details
Keywords
Shamim Mohammad, Shivaraj Huchhanavar, Hifzur Rahman and Tariq Sultan Pasha
The extant literature underlines the inadequacies of legal and policy frameworks addressing the safety and health concerns of sandstone mineworkers in India. Notably, Rajasthan, a…
Abstract
Purpose
The extant literature underlines the inadequacies of legal and policy frameworks addressing the safety and health concerns of sandstone mineworkers in India. Notably, Rajasthan, a state renowned for its extractive industries, mirrors these concerns. Against this backdrop, this paper aims to critically evaluate the relevant legal and policy landscape, with an emphasis on the recent central statute: the Occupational Safety, Health and Working Conditions Code of 2020 (OSHWCC). Given that the Code subsumes the key legislation pertaining to the safety and health of mineworkers, an in-depth critical analysis is essential to forge suitable policy interventions to address continued gross violations of human rights.
Design/methodology/approach
The critical analysis of legal and policy frameworks on silicosis in sandstone mineworkers is based on a comprehensive reading of existing literature. The literature includes relevant laws, case law, reports of the Rajasthan State Human Rights Commission and National Human Rights Commission, publicly available data and key scholarly contributions in the field.
Findings
Although the OSHWCC has made some changes to the existing regulatory architecture of mines in India, it has failed to safeguard the safety and health of mineworkers. Notably, the vast majority of mines in India – constituting approximately 90%, which are informal, seasonal and small-scale – remain beyond the jurisdiction of this Code. In Rajasthan, there are specific policies on silicosis, but these policies are poorly implemented. There is a serious shortage of doctors to diagnose silicosis cases, leading to under-diagnosis. The compensation for silicosis victims is insufficient; the distribution mechanism is complex and often delayed.
Research limitations/implications
The central and many state governments have not established the regulatory institutions envisaged under the OSHWCC 2020; therefore, the working of the regulatory institutions could not be critically examined.
Originality/value
The paper critically evaluates laws and policies pertaining to silicosis in sandstone mineworkers, with a special emphasis on the state of Rajasthan. It offers a comprehensive critique of the OSHWCC of 2020, which has not received much attention from previous studies.
Details
Keywords
Xiaobo Shi, Yaning Qiao, Xinyu Zhao, Yan Liu, Chenchen Liu, Ruopeng Huang and Yuanlong Cui
Modern subway transportation systems need to satisfy increasing safety demands to rapidly evacuate passengers under hazardous emergency circumstances, such as fires, accidents or…
Abstract
Purpose
Modern subway transportation systems need to satisfy increasing safety demands to rapidly evacuate passengers under hazardous emergency circumstances, such as fires, accidents or terrorist attacks, to reduce passenger injuries or life losses. The emergency evacuation capacity (EEC) of a subway station needs to be revised timely, in case passenger demand increases or the evacuation route changes in the future. However, traditional ways of estimating EEC, e.g. fire drills are time- and resource-consuming and are difficult to revise from time to time. The purpose of this study is to establish an intuitive modelling approach to increase the EEC of subway stations in a stepwised manner.
Design/methodology/approach
This study develops an approach to combine agent-based evacuation modelling and building information modelling (BIM) technology to estimate the total evacuation time of a subway station.
Findings
Evacuation time can be saved (33% in the studied case) from iterative improvements including stopping escalators running against the evacuation flow and modifying the geometry around escalator exits. Such iterative improvements rely on integrating agent-based modelling and BIM.
Originality/value
The agent-based model can provide a more realistic simulation of intelligent individual movements under emergency circumstances and provides precise feedback on locations of evacuation bottlenecks. This study also examined the effectiveness of two rounds of stepwise improvements in terms of operation or design to increase the EEC of the station.
Details