Search results
1 – 10 of over 10000Mostafa Abbaszadeh, AliReza Bagheri Salec and Shurooq Kamel Abd Al-Khafaji
The space fractional PDEs (SFPDEs) play an important role in the fractional calculus field. Proposing a high-order, stable and flexible numerical procedure for solving SFPDEs is…
Abstract
Purpose
The space fractional PDEs (SFPDEs) play an important role in the fractional calculus field. Proposing a high-order, stable and flexible numerical procedure for solving SFPDEs is the main aim of most researchers. This paper devotes to developing a novel spectral algorithm to solve the FitzHugh–Nagumo models with space fractional derivatives.
Design/methodology/approach
The fractional derivative is defined based upon the Riesz derivative. First, a second-order finite difference formulation is used to approximate the time derivative. Then, the Jacobi spectral collocation method is employed to discrete the spatial variables. On the other hand, authors assume that the approximate solution is a linear combination of special polynomials which are obtained from the Jacobi polynomials, and also there exists Riesz fractional derivative based on the Jacobi polynomials. Also, a reduced order plan, such as proper orthogonal decomposition (POD) method, has been utilized.
Findings
A fast high-order numerical method to decrease the elapsed CPU time has been constructed for solving systems of space fractional PDEs.
Originality/value
The spectral collocation method is combined with the POD idea to solve the system of space-fractional PDEs. The numerical results are acceptable and efficient for the main mathematical model.
Details
Keywords
Eddie W.L. Cheng, H. Li, D.P. Fang and F. Xie
This paper aims at presenting the analysis of the views of construction participants in China’s construction industry on three major site safety issues. First, data from three…
Abstract
This paper aims at presenting the analysis of the views of construction participants in China’s construction industry on three major site safety issues. First, data from three distinctive roles (project managers, safety officers, and foremen) on site safety knowledge were analysed. Results indicate that they have low levels of safety knowledge. This is consistent with the existing literature, implying that safety training and education is a major issue around the world. In addition, the views of project managers and safety officers are further elicited on the second issue (that is, factors affecting site safety) and the third issue (that is, methods for improving project safety management). Results indicate that both parties have quite consistent views. The six most important factors are “lack of attention to safety protection by workers”, “lack of attention to safety management by main contractors/project managers”, “insufficient safety training”, “inadequate safety level”, “tiredness of workers”, and “poor quality of construction materials and equipments”. The five most promising methods are “increase in safety investment in terms of manpower, capital and finance”, “improvement in safety operations”, “no alcohol at work”, “increase in safety training and education for workers”, and “increase in safety inspection”. Discussions are given in this paper.
Details
Keywords
Guodong Ni, Qi Zhang, Yaqi Fang, Ziyao Zhang, Yaning Qiao, Wenshun Wang and Yongliang Deng
The purpose of this paper is to explore the correction mechanism of resilient safety culture on new generation of construction workers (NGCWs)' unsafe behavior and test the…
Abstract
Purpose
The purpose of this paper is to explore the correction mechanism of resilient safety culture on new generation of construction workers (NGCWs)' unsafe behavior and test the multiple mediation effects of job crafting and perceived work meaningfulness based on the context of Chinese construction industry in order to find a new way to effectively correct the NGCWs' unsafe behavior.
Design/methodology/approach
A theoretical model of correction mechanism was established based on literature research and theoretical deduction. An empirical study was employed based on confirmatory factor analysis and regression analysis with a sample of 404 NGCWs in China.
Findings
The results indicated that resilient safety culture can effectively correct NGCWs' unsafe behavior through job crafting and perceived work meaningfulness. Job crafting and perceived work meaningfulness can play independent and serial mediating roles between resilient safety culture and unsafe behavior.
Research limitations/implications
Research results only represent a short-term law about the correction mechanism of NGCWs' unsafe behavior based on a questionnaire study from China's construction industry. It is necessary to continue to implement a longitudinal study to test it in a relatively long period in future research. The findings also need to be verified based on the young construction workers in other countries.
Practical implications
This study provides a theoretical basis and feasible management reference for construction enterprises in China to correct NGCWs' unsafe behavior from the perspective of resilient safety culture. Furthermore, the construction of resilient safety culture in construction enterprises can help NGCWs better carry out job crafting and perceive the meaning of work.
Originality/value
This paper clarifies the correction mechanism of resilient safety culture on unsafe behavior of NGCWs, and further tests the independent mediating roles and a serial mediating role of job crafting and perceived work meaningfulness between resilient safety culture and unsafe behavior, which fills the research gap about the influence mechanism of resilient safety culture on young construction workers' unsafe behavior and enriches the theoretical system of unsafe behavior correction of construction workers.
Details
Keywords
Mehdi Dehghan, Mostafa Abbaszadeh, Amirreza Khodadadian and Clemens Heitzinger
The current paper aims to develop a reduced order discontinuous Galerkin method for solving the generalized Swift–Hohenberg equation with application in biological science and…
Abstract
Purpose
The current paper aims to develop a reduced order discontinuous Galerkin method for solving the generalized Swift–Hohenberg equation with application in biological science and mechanical engineering. The generalized Swift–Hohenberg equation is a fourth-order PDE; thus, this paper uses the local discontinuous Galerkin (LDG) method for it.
Design/methodology/approach
At first, the spatial direction has been discretized by the LDG technique, as this process results in a nonlinear system of equations based on the time variable. Thus, to achieve more accurate outcomes, this paper uses an exponential time differencing scheme for solving the obtained system of ordinary differential equations. Finally, to decrease the used CPU time, this study combines the proper orthogonal decomposition approach with the LDG method and obtains a reduced order LDG method. The circular and rectangular computational domains have been selected to solve the generalized Swift–Hohenberg equation. Furthermore, the energy stability for the semi-discrete LDG scheme has been discussed.
Findings
The results show that the new numerical procedure has not only suitable and acceptable accuracy but also less computational cost compared to the local DG without the proper orthogonal decomposition (POD) approach.
Originality/value
The local DG technique is an efficient numerical procedure for solving models in the fluid flow. The current paper combines the POD approach and the local LDG technique to solve the generalized Swift–Hohenberg equation with application in the fluid mechanics. In the new technique, the computational cost and the used CPU time of the local DG have been reduced.
Details
Keywords
Ana Minguez and F. Javier Sese
The purpose of this study is to investigate whether a U-shaped relationship exists between the length of time a donor has been a regular member in a nonprofit organization and the…
Abstract
Purpose
The purpose of this study is to investigate whether a U-shaped relationship exists between the length of time a donor has been a regular member in a nonprofit organization and the amount donated over time. In addition, this research analyzes whether this relationship is moderated by donation frequency.
Design/methodology/approach
Using a database of 6,137 members from a collaborating nonprofit organization, a longitudinal study is conducted over an eight-year period (2013–2020). A set of ordinary least square (OLS) regression analyses are carried out to empirically test the proposed hypotheses.
Findings
This study finds a nonlinear, U-shaped relationship between donation amount and relationship length. This effect can be explained through the dynamic evolution of two dimensions of commitment: affective (decreasing over time) and normative (increasing over time). The results also reveal that these effects, however, become flatter for members who engage in more frequent donations.
Originality/value
The results provide novel insights revealing the nonlinear nature of the relationship between the length of time a donor has been a member of a nonprofit organization and the amount donated, and underscores the moderating role of donation frequency, which makes the U-shaped relationship flatter, thus increasing the amounts donated. Despite their relevance in the service ecosystem, nonprofits have been under-represented in prior work. This study offers important practical insights into the effective management of the regular donor portfolio.
Details
Keywords
Xiaoyan Jiang, Haoyu Sun, Kun Lu, Sainan Lyu and Martin Skitmore
In China, external supervision on construction safety mainly comes from the government and supervision engineers (SEs). However, the construction safety supervisory mechanism…
Abstract
Purpose
In China, external supervision on construction safety mainly comes from the government and supervision engineers (SEs). However, the construction safety supervisory mechanism (CSSM) contains some dilemmas affecting the improvement of safety performance, such as the declining impact of SEs, the increasing rent-seeking behaviors of contractor and excessive government interference. This study aims to depict and analyze the CSSM in China from an evolutionary game view. The objectives are to understand the supervision strategy and evolutionary behaviors of different stakeholders, propose suggestions for improving safety performance and help the key safety supervision stakeholders, especially the government, formulate a suitable safety supervision strategy.
Design/methodology/approach
This research uses tripartite dynamic evolutionary game theory to study the CSSM in China and solve the stable equilibrium solution using system dynamics.
Findings
This study has revealed the game relationship of construction safety supervision mechanisms in China and solved the stable equilibrium solution. The results prove that a supervision engineer (SE) plays a crucial role in the CSSM, and “supervision engineer useless” is an unreasonable assertion. For government supervision agency (GSA), excessive inspection and free-market regulation are neither wise strategies. GSA can reduce the inspection frequency when general contractors (GCs) input high safety investments and SEs implement responsible supervision. But keeping proper government supervision to avoid GC's unlawful behaviors and SE's rent-seeking is indispensable. In addition, excessive governmental supervision will weaken SE's role, so the government should transfer some supervision powers to SE.
Originality/value
This study focuses on the dynamic evolution process between GSA, GC and SE. This method is different from most research that neglected the dynamic characteristic of system and game solution stability. The research methods not only contribute to construction safety supervision policy-making in China but also help to improve supervision efficiency in other countries and other fields.
Details
Keywords
Yee Sye Lee, Ali Rashidi, Amin Talei, Mehrdad Arashpour and Farzad Pour Rahimian
In recent years, deep learning and extended reality (XR) technologies have gained popularity in the built environment, especially in construction engineering and management. A…
Abstract
Purpose
In recent years, deep learning and extended reality (XR) technologies have gained popularity in the built environment, especially in construction engineering and management. A significant amount of research efforts has been thus dedicated to the automation of construction-related activities and visualization of the construction process. The purpose of this study is to investigate potential research opportunities in the integration of deep learning and XR technologies in construction engineering and management.
Design/methodology/approach
This study presents a literature review of 164 research articles published in Scopus from 2006 to 2021, based on strict data acquisition criteria. A mixed review method, consisting of a scientometric analysis and systematic review, is conducted in this study to identify research gaps and propose future research directions.
Findings
The proposed research directions can be categorized into four areas, including realism of training simulations; integration of visual and audio-based classification; automated hazard detection in head-mounted displays (HMDs); and context awareness in HMDs.
Originality/value
This study contributes to the body of knowledge by identifying the necessity of integrating deep learning and XR technologies in facilitating the construction engineering and management process.
Details
Keywords
Martin Evans, Peter Farrell, Emad Elbeltagi and Helen Dion
Built environment organisations face global challenges between business units, especially since the coronavirus pandemic (COVID-19) has profoundly disrupted the construction…
Abstract
Purpose
Built environment organisations face global challenges between business units, especially since the coronavirus pandemic (COVID-19) has profoundly disrupted the construction industry worldwide, including the management of construction megaprojects (CMPs). This research aims to develop a competency framework, for global integrated delivery (GID) transformative initiatives and future of work (FOW) global initiatives, to manage integration between lean construction (LC) practices and integrated project delivery (IPD) on CMPs in contemporary multinational engineering organisations.
Design/methodology/approach
“Mixed research methods” involves a two-stage quantitative and qualitative research approach. In the context of CMPs, stage one consisted of a qualitative research methodology comprising a literature review to examine competencies, COVID-19 impacts, responses and key drivers (KDs) to integrate LeanIPD&GID; stage one outcomes propose a conceptualisation of LeanIPD&GID, a competency framework and future of work (FOW) global initiatives. Stage two involved an empirical questionnaire survey for a set of 30 KDs arranged into five-factor clusters (FCs), 226 respondents from 23 countries with an extensive cosmopolitan experience; analysis adopted structural equation modelling (SEM), descriptive and inferential statistics, percentage scoring analysis, principal component analysis (PCA) and eigenvalues.
Findings
In the context of CMPs, stage one outcomes delivered a conceptualisation of LeanIPD&GID, a proposed competency framework and FOW global initiatives. Stage two concluded that the most significant KDs are “collaboration in design, construction works and engineering management,” “coordination and planning of construction work,” “senior organisational management support,” “boosting implementation of LC, and integrating project delivery” and “earlier and precise 3D visualisation of designs”. building information modelling (BIM) adoption in the MENA region is higher than LC; the second is still taking its first steps, while IPD has little implementation. LeanBIM is slightly integrated, while LeanIPD integration is almost not present.
Originality/value
The research findings, conceptualised LeanIPD&GID principles, a proposed competency framework and FOW global initiatives, provided future research streams and directions; the study has provided a competency framework and FOW global initiatives for effective practical strategies for enhancing integration of LeanIPD&GID transformative initiatives on CMPs and will allow project key stakeholders to place emphasis on boosting LeanIPD&GID KDs.
Details
Keywords
Martin Evans, Peter Farrell, Emad Elbeltagi and Helen Dion
The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International…
Abstract
Purpose
The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International businesses, multinational AEC organisations, technical professionals, project and portfolio management organisations face global connectivity challenges between business units, especially during the outbreak of novel coronavirus pandemic, to manage construction megaprojects (CMPs). That raises the need to manage global connectivity as a main strategic goal of global organisations. This paper aims to investigate barriers to integrating lean construction (LC) practices and integrated project delivery (IPD) on CMPs towards the global integrated delivery (GID) transformative initiatives and develop future of work (FOW) global initiatives in contemporary multinational AEC organisations.
Design/methodology/approach
A two-stage quantitative and qualitative research approach is adopted. The qualitative research methodology consists of a literature review to appraise barriers to integrating LeanIPD&GID on CMPs. Barriers are arranged into six-factor clusters (FCs), with a conceptualisation of LeanIPD&GID, GID strategy placements and FOW global initiatives with multiple validations. This analysis also involved semi-structured interviews and focus group techniques. Stage two consisted of an empirical questionnaire survey that shaped the foundation of analysis and findings of 230 respondents from 23 countries with extensive cosmopolitan experience in the construction of megaprojects. The survey examined a set of 28 barriers to integrating LeanIPD&GID on CMPs resulting from a detailed analysis of extant literature after validation. Descriptive and inferential statistical tests were exploited for data analysis, percentage scoring analysis, principal component analysis (PCA) and eigenvalues were used to elaborate on clustered factors.
Findings
The research conceptualised LeanIPD&GID principles and proposed GID strategy placements for LeanIPD&GID transformative initiatives and FOW global initiatives. It concluded that the most significant barriers to integration of LeanIPD&GID on CMPs are “lack of mandatory building information modelling (BIM) and LC industry standards and regulations by governments”, “lack of involvement and support of governments”, “high costs of BIM software licenses”, “resistance of industry to change from traditional working practices” and “high initial investment in staff training costs of BIM”. PCA revealed the most significant FCs are “education and knowledge-related barriers”, “project objectives-related barriers” and “attitude-related barriers”. Awareness of BIM in the Middle East and North Africa (MENA) region is higher than LC and LC awareness is higher than IPD knowledge. Whilst BIM adoption in the MENA region is higher than LC; the second is still taking its first steps, whilst IPD has little implementation. LeanBIM is slightly integrated, whilst LeanIPD integration is almost not present.
Originality/value
The research findings, conclusion and recommendation and proposed GID strategy placements for LeanIPD&GID transformative initiatives to integrating LeanIPD&GID on CMPs. This will allow project key stakeholders to place emphasis on tackling LeanIPD&GID barriers identified in this research and commence GID strategies. The study has provided effective practical strategies for enhancing the integration of LeanIPD&GID transformative initiatives on CMPs.
Details
Keywords
Hossein Karimi, Timothy R.B. Taylor, Paul M. Goodrum and Cidambi Srinivasan
This paper aims to quantify the impact of craft worker shortage on construction project safety performance.
Abstract
Purpose
This paper aims to quantify the impact of craft worker shortage on construction project safety performance.
Design/methodology/approach
A database of 50 North American construction projects completed between 2001 and 2014 was compiled by taking information from a research project survey and the Construction Industry Institute Benchmarking and Metrics Database. The t-test and Mann-Whitney test were used to determine whether there was a significant difference in construction project safety performance on projects with craft worker recruiting difficulty. Poisson regression analysis was then used to examine the relationship between craft worker recruiting difficulty and Occupational Safety and Health Administration Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects.
Findings
The result showed that the TRIR distribution of a group of projects that reported craft worker recruiting difficulty tended to be higher than the TRIR distribution of a group of projects with no craft worker recruiting difficulty (p-value = 0.004). Moreover, the average TRIR of the projects that reported craft worker recruiting difficulty was more than two times the average TRIR of projects that experienced no craft recruiting difficulty (p-value = 0.035). Furthermore, the Poisson regression analysis demonstrated that there was a positive exponential relationship between craft worker recruiting difficulty and TRIR in construction projects (p-value = 0.004).
Research limitations/implications
The projects used to construct the database are heavily weighted towards industrial construction.
Practical implications
There have been significant long-term gains in construction safety within the USA. However, if recent craft shortages continue, the quantitative analyses presented herein indicate a strong possibility that more safety incidents will occur unless the shortages are reversed. Innovative construction means and methods should be developed and adopted to work in a safe manner with a less qualified workforce.
Originality/value
The Poisson regression model is the first model that quantifiably links project craft worker availability to construction project safety performance.
Details