Quantitative analysis of the impact of craft worker availability on construction project safety performance

Hossein Karimi (Department of Civil Engineering , University of Kentucky, Lexington, Kentucky, USA)
Timothy R.B. Taylor (Department of Civil Engineering , University of Kentucky, Lexington, Kentucky, USA)
Paul M. Goodrum (Department of Civil, Environmental, and Architectural Engineering, University of Colorado at Boulder, Boulder, Colorado, USA)
Cidambi Srinivasan (Department of Statistics, University of Kentucky, Lexington, Kentucky, USA)

Construction Innovation

ISSN: 1471-4175

Article publication date: 11 July 2016

1210

Abstract

Purpose

This paper aims to quantify the impact of craft worker shortage on construction project safety performance.

Design/methodology/approach

A database of 50 North American construction projects completed between 2001 and 2014 was compiled by taking information from a research project survey and the Construction Industry Institute Benchmarking and Metrics Database. The t-test and Mann-Whitney test were used to determine whether there was a significant difference in construction project safety performance on projects with craft worker recruiting difficulty. Poisson regression analysis was then used to examine the relationship between craft worker recruiting difficulty and Occupational Safety and Health Administration Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects.

Findings

The result showed that the TRIR distribution of a group of projects that reported craft worker recruiting difficulty tended to be higher than the TRIR distribution of a group of projects with no craft worker recruiting difficulty (p-value = 0.004). Moreover, the average TRIR of the projects that reported craft worker recruiting difficulty was more than two times the average TRIR of projects that experienced no craft recruiting difficulty (p-value = 0.035). Furthermore, the Poisson regression analysis demonstrated that there was a positive exponential relationship between craft worker recruiting difficulty and TRIR in construction projects (p-value = 0.004).

Research limitations/implications

The projects used to construct the database are heavily weighted towards industrial construction.

Practical implications

There have been significant long-term gains in construction safety within the USA. However, if recent craft shortages continue, the quantitative analyses presented herein indicate a strong possibility that more safety incidents will occur unless the shortages are reversed. Innovative construction means and methods should be developed and adopted to work in a safe manner with a less qualified workforce.

Originality/value

The Poisson regression model is the first model that quantifiably links project craft worker availability to construction project safety performance.

Keywords

Acknowledgements

The authors would like to thank the CII for its support of this research. In addition, the writers thank the members of CII research team 318 for their substantial contributions to this research. The views and opinions expressed herein are of the authors and do not necessarily represent the views and opinions of the CII or the industry team members of RT-318.

Citation

Karimi, H., Taylor, T.R.B., Goodrum, P.M. and Srinivasan, C. (2016), "Quantitative analysis of the impact of craft worker availability on construction project safety performance", Construction Innovation, Vol. 16 No. 3, pp. 307-322. https://doi.org/10.1108/CI-10-2015-0050