1 – 10 of 471Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson
This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.
Abstract
Purpose
This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.
Design/methodology/approach
Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.
Findings
How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.
Research limitations/implications
This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.
Originality/value
Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.
Details
Keywords
Nayana Dissanayake, Bo Xia, Martin Skitmore, Bambang Trigunarsyah and Vanessa Menadue
The purpose of this study was to prioritize the appropriate generic contractor selection criteria for Engineering–Procurement–Construction (EPC) projects in the construction…
Abstract
Purpose
The purpose of this study was to prioritize the appropriate generic contractor selection criteria for Engineering–Procurement–Construction (EPC) projects in the construction industry.
Design/methodology/approach
Proceeding from a review of previous studies and validation by a small group of experts, a preliminary set of 16 criteria was first identified. This was followed by three rounds of Delphi surveys: firstly, with 64 experienced participants confirming the relevance of the 16 criteria; secondly, with a reduced subgroup of 47 more experienced participants scoring the importance of each; and finally, providing the opportunity for these 47 to revise their scores in the light of knowing the aggregated results of the previous round.
Findings
The results show the consensus view, of which the most important criteria are ranked as past performance, project understanding, technical attributes, key personnel, health and safety, past experience, time, management, financial, contractual and legal, quality, cost, relationships, environmental and sustainability, organizational and industrial relations, and geographic location.
Originality/value
The findings are useful for both practitioners and academics in making a significant contribution to the body of knowledge of the EPC process. This will assist in providing a better understanding of criteria importance and pave the way to developing an EPC contractor selection model involving the criteria most needed to objectively identify potential contractors and evaluate tenders.
Details
Keywords
Udara Willhelm Abeydeera Lebunu Hewage, Jayantha Wadu Mesthrige and Eric G. Too
This study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.
Abstract
Purpose
This study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.
Design/methodology/approach
The current research study adopted a quantitative research method. Using a purposeful sampling strategy, 100 construction companies engaged in small construction projects in Sri Lanka were selected and a questionnaire was distributed among top managerial employees of these companies. Employees belonging to 47 companies responded to the survey which provided information relating to 812 construction projects. The collected data were analyzed using the RM implementation index (RMII) and other quantitative measures such as mean, median and percentages.
Findings
The research findings indicated that RM incorporation was at a lower degree in small construction projects in Sri Lanka. The findings further indicated that RM incorporation was relatively high in the public construction projects compared to the private construction projects. The main obstacles identified through the survey for RM implementation were: “lack of funding”, “lack of time”, “low profit margin”, “not economical” and “lack of knowledge”.
Research limitations/implications
The study was limited to exploring RM implementation in small construction projects in Sri Lanka. The study was limited to the building construction companies under the 150-million-rupee (approx. below 450,000 USD) financial limit registered with the construction industry development authority in Sri Lanka.
Originality/value
RM in small construction projects in developing countries is a relatively less explored domain. Sri Lankan construction industry is another relatively less explored domain in terms of new management technique implementation such as RM and value management. The quantitative approach used for the study revealed that RM implementation is at a lower degree in the small construction projects. Moreover, several obstacles pertaining to RM implementation were recognized through this study. These findings will be useful for the construction stakeholders to overcome the recognized barriers and effectively use RM in their respective construction projects.
Details
Keywords
Lichini Nikesha Weerasinghe, Akila Pramodh Rathnasinghe, Himal Suranga Jayasena, Niraj Thurairajah and Menaha Thayaparan
Building information modelling (BIM) claims to be spearheading the modern technological revolution in the global construction industry. While scholars have emphasised the…
Abstract
Purpose
Building information modelling (BIM) claims to be spearheading the modern technological revolution in the global construction industry. While scholars have emphasised the cruciality of BIM, associated costs have been identified as one of the major barriers to successful BIM implementation, as is the case in Sri Lanka. Besides, lean principles (LPs) are known for increasing efficiency, quality and eliminating waste, thereby reducing overall costs. Hence, this research aims at addressing the BIM implementation barrier associated with costs by applying suitable LP, enhancing overall value by minimising value-insignificant activities.
Design/methodology/approach
The study adopted a qualitative research approach. 10 experts with expertise in both BIM and LP were targeted for the primary data collection through semi-structured interviews. The collected data were analysed using manual content analysis.
Findings
Research findings discovered the cost centres that can be applied to the LPs and the effective LPs that can be applied with the cost centres of BIM implementation. The theoretical implication of the study is to provide insights into a potential application of LP for BIM cost centres, whereas practical consequences include the identification of LP's potential to minimise BIM cost centres, ergo, achieving a successful BIM implementation.
Originality/value
This study will be the first of its kind in the Sri Lankan construction industry, intending to apply LP with BIM implementation cost centres to achieve a successful implementation. This research also has paved the way forward for further research on the application of both the BIM and LP concepts for similar construction industries in developing countries across the world and in addressing other BIM implementation barriers.
Details
Keywords
Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among…
Abstract
Purpose
Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among stakeholders, public skepticism, and opposition. However, most existing studies have not focused on the dynamic analysis of integrating social risks in these stages. This study developed a dynamic analysis approach to explore the dynamics of critical social risk factors and related stakeholders of megaprojects and built the managerial maps for various stakeholders.
Design/methodology/approach
Based on the social analysis network (SNA), a dynamic network analysis approach for understanding the dynamics of social risk and related stakeholders has been developed by literature and case analysis. The approach comprises the following steps: (1) generating social risk–stakeholder networks in different stages; (2) analysis of the critical stakeholders and social risk factors; (3) dynamic analysis of social risk factors; and (4) developing social risk management maps for various stakeholders. To verify the feasibility and effectiveness of the approach, 40 megaprojects from China were analyzed.
Findings
According to the results, the local government is a critical stakeholder during all stages, inadequate information promotion (IIP) and imperfect communication and coordination mechanism (ICCM) are key social risk sources throughout the megaproject life cycle. Furthermore, the management maps for government organizations, project implementation groups, and external stakeholders were constructed.
Originality/value
This research has three contributions. First, a dynamic analysis approach of stakeholder-associated social risks in megaprojects is developed, which enriches the social risk management theory of megaprojects and provides inspiration for future research focus. Second, the social risk–stakeholder networks and critical social risks in different stages are confirmed to provide a more valid and accurate picture of social risk management in megaprojects. Third, the social risk managerial maps for different stakeholders built in this research will be beneficial for governments, project implementation groups, and external stakeholders to optimize management strategies.
Details
Keywords
Alice Stewardson, David J. Edwards, Eric Asamoah, Clinton Ohis Aigbavboa, Joseph H.K. Lai and Hatem El-Gohary
The UK government has elaborated the effect of late payment on the economy, with its impact on the construction sector being particularly pronounced. This paper aims to evaluate…
Abstract
Purpose
The UK government has elaborated the effect of late payment on the economy, with its impact on the construction sector being particularly pronounced. This paper aims to evaluate the late payment epidemic that persists within the construction industry, specifically analysing the effectiveness of government-led voluntary payment initiatives.
Design/methodology/approach
A mixed philosophical lens is adopted that incorporates both pragmatism and post-positivism to examine the late payment phenomena. Couched within deductive reasoning and a case study strategy, a questionnaire survey was conducted to elicit responses from one-hundred construction professionals. Elucidating upon respondents’ perceptions of the UK’s late payment epidemic, a comparative analysis was undertaken of upstream (main contractor) and downstream (subcontractors/suppliers) contractors through Cronbach’s alpha, descriptive statistics, independence chi-square test, Kruskal–Wallis test and Mann–Whitney U test.
Findings
Emergent findings reveal that in practice, the monitoring and enforcement of government-led voluntary payment initiatives has been unprosperous with numerous contractors being forced to adopt indefensibly poor and punitive payment practices. Survey responses and extant literature substantiate and underscore the industry’s need to strengthen voluntary government-led payment initiatives. To create a responsible payment culture, any future code created should be mandatory and enforceable as a self-regulating approach has failed dismally. The work concludes with practical additional measures that could be introduced to create a responsible payment culture and promote ethical trading within the UK construction industry.
Originality/value
This paper constitutes a novel vignette of, and reflection upon, contemporary practice in this area of construction finance and serves to emphasise that very little has changes in the sector despite numerous UK government led reports and interventions.
Details
Keywords
Mohammad Mayouf and Ciaran Gilligan
In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered…
Abstract
Purpose
In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project.
Design/methodology/approach
An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor.
Findings
The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects.
Originality/value
The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.
Details
Keywords
Justice Williams, Frank Fugar, Emmanuel Adinyira and Kofi Agyekum
Effective safety communication facilitates the sharing of relevant knowledge that helps to improve safety behaviours, such as superior hazard identification and compliance. This…
Abstract
Purpose
Effective safety communication facilitates the sharing of relevant knowledge that helps to improve safety behaviours, such as superior hazard identification and compliance. This study aims to explore channels by which construction companies can effectively communicate health and safety (H&S) among communities of their operations.
Design/methodology/approach
Based on a quantitative research approach, this study addressed the knowledge gap through a cross-sectional survey of 250 contractors (comprising 155 building and 95 road contractors) involved in various projects in the Ghanaian construction industry. These contractors were selected by using a stratified simple random sampling technique. Data obtained from the survey was analysed through descriptive (i.e. frequencies, mean and standard deviation) and inferential (i.e. exploratory factor analysis) statistical analyses.
Findings
The findings from the mean scores revealed that all the 12 communication channels identified in the literature, confirmed through piloting and examined by the respondents, were important channels through which construction companies can effectively communicate H&S amongst communities of their operations. The exploratory factor analysis revealed a clustering of the 12 channels of communication into 5 components: “safety demonstration in the community”; “social media”; “mass media”; “community engagement”; and “opinion leaders”.
Research limitations/implications
This study offers construction project managers the means of managing one of the major stakeholders of a construction project (the community). It provides an actionable opportunity that can be leveraged strategically to integrate community members into projects to promote synergy and local content inclusion while gaining a peaceful atmosphere to achieve their project goals.
Practical implications
Practically, this study provides construction project managers with a means of managing one of the major stakeholders of a construction project (the community) and also demonstrates the integration of community members into projects to promote synergy and local content inclusion. This would give construction organisations a peaceful atmosphere to accomplish their project objectives.
Social implications
The social implication of this study is that the study offers society a means of creating safer Ghanaian communities by offering them the knowledge of identifying hazards and avoiding risky behaviours, creating a good safety atmosphere in these communities.
Originality/value
This study presents construction organisations with a unique opportunity to transfer and share novel external knowledge within a different social system (the community). It contributes to the state-of-the-art knowledge in H&S communication by providing channels through which H&S can be communicated in a developing country such as Ghana.
Details
Keywords
Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan
In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…
Abstract
Purpose
In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.
Design/methodology/approach
A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.
Findings
The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.
Research limitations/implications
The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.
Practical implications
This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.
Originality/value
The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.
Details
Keywords
Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp
Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…
Abstract
Purpose
Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.
Design/methodology/approach
This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.
Findings
The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.
Research limitations/implications
The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.
Practical implications
This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.
Originality/value
This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.