Article
Publication date: 2 July 2024

Mahesh Babu Purushothaman, Leo Neil Resurreccion San Pedro and Ali GhaffarianHoseini

This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through…

Abstract

Purpose

This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through early anticipation.

Design/methodology/approach

Forty-seven global literature were examined in detail to identify CODS and its interactions using the systematic literature review (SLR) method that utilised the PRISMA guidelines to ensure the studies reviewed were adequate to safeguard the robustness and comprehensiveness. Three-way analysis, such as Pareto, degree of centrality and loops, was undertaken to identify the critical Level 1,2 and 3 CODS that affect the Construction projects.

Findings

The research findings demonstrate that 65 CODs in eight categories affect construction projects. The CODs act in coherence rather than silos; the CLD displays complex interconnections of 44 factors obtained through the pairwise comparison of the 47 identified literature of the SLR. Through its systematic analysis of interaction loops, this research identified Ten level 1 critical CODs, two second-level critical CODs and 4 Third-level critical CODs. “Contractors' excessive workload/beyond potential/inadequate experience” emerged as the top COD that affects scheduling and project delay.

Research limitations/implications

The study limitations include using only English articles and a restricted number of databases. However, the chosen databases were reputable and underwent thorough peer review processes. This study may have limitations due to the SLR, which means that factors affecting COD and interactions may vary by country, and future research is suggested for validation.

Practical implications

This study identified interactions of construction delays that potentially support scheduling risk management during the early stage of the project and reduce waste to improve sustainability. The theoretical implications of SLR-based research include helping develop a framework that would potentially have all COD in the current scenario and aid future academic and industrial research factor-wise and country-wise in aiding sustainability. This will support and provide construction professionals and academia with knowledge of the COD related to factors and their interactions to be considered in the early assessment and management of future projects and improve sustainability.

Originality/value

Most literature studies the factors or causes of construction delays that affect construction projects. The CODs primarily do not operate in silos but combine with other causes to enhance their influence on delays. Hence, it is of utmost importance to study the interactions of COD to enhance the knowledge in the construction field that would aid in schedule repair and, in turn, on-time project delivery. The study is the first related to COD and their interactions in construction projects in the digital era.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 20 March 2023

Haruna Sa'idu Lawal, Hassan Adaviriku Ahmadu, Muhammad Abdullahi, Muhammad Aliyu Yamusa and Mustapha Abdulrazaq

This study aims to develop a building renovation duration prediction model incorporating both scope and non-scope factors.

Abstract

Purpose

This study aims to develop a building renovation duration prediction model incorporating both scope and non-scope factors.

Design/methodology/approach

The study used a questionnaire to obtain basic information relating to identified project scope factors as well as information relating to the impact of the non-scope factors on the duration of building renovation projects. The study retrieved 121 completed questionnaires from construction firms on tertiary education trust fund (TETFund) building renovation projects. Artificial neural network was then used to develop the model using 90% of the data, while mean absolute percentage error was used to validate the model using the remaining 10% of the data.

Findings

Two artificial neural network models were developed – a multilayer perceptron (MLP) and a radial basis function (RBF) model. The accuracy of the models was 86% and 80%, respectively. The developed models’ predictions were not statistically different from those of actual duration estimates with less than 20% error margin. Also, the study found that MLP models are more accurate than RBF models.

Research limitations/implications

The developed models are only applicable to projects that suit the characteristics and nature of the data used to develop the models. Hence, models can only predict the duration of building renovation projects.

Practical implications

The developed models are expected to serve as a tool for realistic estimation of the duration of building renovation projects and thus, help construction project managers to effectively plan and manage it.

Social implications

The developed models are expected to serve as a tool for realistic estimation of the duration of building renovation projects and thus, help construction project managers to effectively plan and manage it; it also helps clients to effectively benchmark projects duration and contractors to accurately estimate duration at tendering stage.

Originality/value

The study presents models that combine both scope and non-scope factors in predicting the duration of building renovation projects so as to ensure more realistic predictions.

Details

Journal of Financial Management of Property and Construction , vol. 28 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 15 July 2024

Andrew Ebekozien, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Mohamed Ahmed Hafez and Mohamad Shaharudin Samsurijan

Despite advancements in construction digitalisation and alternative building technologies, cost overrun is still a challenge in the construction industry. The inflation rate is…

Abstract

Purpose

Despite advancements in construction digitalisation and alternative building technologies, cost overrun is still a challenge in the construction industry. The inflation rate is increasing, especially in developing countries, and is critical in cost overrun matters. It can deviate construction built-up rate components. This may thwart improving construction-related Sustainable Development Goals (SDGs). Studies concerning the impact of the inflation rate on construction-related SDGs are scarce in developing countries, including Nigeria. The study investigated the impact of inflation on Nigeria’s construction projects and their outcome on SDGs and suggested possible ways to improve achievement of construction-related SDGs and their targets.

Design/methodology/approach

The researchers employed a qualitative research design. This is because of the study’s unexplored dimension. The researchers engaged 35 participants across major cities in Nigeria via semi-structured virtual and face-to-face interviews. The research utilised a thematic method for collated data and accomplished saturation.

Findings

Findings reveal that the impact of inflation on construction projects, if not checked, could hinder achieving construction-related SDGs in Nigeria. This is because of the past three years of hyperinflation that cut across major construction components. It shows that the upward inflation rate threatens achieving construction-related SDGs and proffered measures to mitigate inflation and, by extension, enhance achieving construction-related SDGs. This includes a downward review of the Monetary Policy Rate, control of exchange rate volatility and addressing insecurity to restore FDIs and FPIs confidence.

Originality/value

Besides suggesting possible solutions to mitigate hyperinflation on construction components to improve achieving construction-related SDGs, findings will stipulate government policymakers put measures in place through favourable fiscal and monetary policy implementation and encourage moving from a consumption to a production nation.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 August 2024

Zhenzong Zhou, Chen Wei, Geoffrey Qiping Shen, Jin Xue, Yongyue Liu, Yaowu Wang and Qingpeng Man

This study explores citizens’ acceptance of prefabricated housing (PH) from the perspective of socio-demographic and psychological factors, aiming to reveal the formation of PH…

Abstract

Purpose

This study explores citizens’ acceptance of prefabricated housing (PH) from the perspective of socio-demographic and psychological factors, aiming to reveal the formation of PH acceptance and realize a sustainable development of PH.

Design/methodology/approach

This study proposed hypotheses drawing on procedural justice theory and uncertainty management theory. A survey of 245 respondents was conducted, and the collected data was analyzed in a stepwise multiple regression model. Then, the psychological influencing mechanism was demonstrated using a mediation model.

Findings

Results of the data analysis manifested that citizens’ acceptance of PH was influenced by socio-demographic and psychological factors, where psychological factors had more significant effects on acceptance than socio-demographic factors. The psychological mechanism was examined by verifying the mediating role of uncertainty between procedural justice and the acceptance of PH. Furthermore, a scientific strategy for developing PH was proposed based on this empirical study.

Originality/value

This study extends the knowledge of procedural justice theory by investigating people’s acceptance in the PH context. This study is also one of the first studies to unveil the psychological mechanism toward a high-cost product with invisible technological innovation. This study contributes to the literature by introducing uncertainty management theory to a controversial issue, examining and expanding its application in a complicated context. Moreover, results highlight the positive influence of fair processes on controversial issues.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 December 2022

Abdulwahed Fazeli, Saeed Banihashemi, Aso Hajirasouli and Saeed Reza Mohandes

This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction…

Abstract

Purpose

This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction managers and practitioners to estimate the time of compound elements in building projects using the resource specification technique.

Design/methodology/approach

A 4D BIM estimation process was first developed by applying the resource specification and geometric information from the BIM model. A suite of OA including particle swarm optimization, ant colony, differential evolution and genetic algorithm were developed and compared in order to facilitate and automate the estimation process. The developed processes and porotypes were linked and integrated.

Findings

The OA-based automated 4D BIM estimation prototype was developed and validated through a real-life construction project. Different OAs were applied and compared, and the genetic algorithm was found as the best performing one. The prototype was successfully linked with BIM timeliner application. By using this approach, the start and finish dates of all object-based activities are developed, and the project completion time is automatically estimated.

Originality/value

Unlike conventional construction estimation methods which need various tools and are error prone and time-consuming, the developed method bypasses the existing time estimation tools and provides the integrated and automated process with BIM and machine learning algorithms. Furthermore, this approach integrates 4D BIM applications into construction design procedures, connected with OA automation.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 September 2023

Vincent Kwame Osei-Appiah, Ernest Kissi, Victor Acheamfour Karikari, Prosper Ayeng, Eugene Danquah-Smith and Michael Adesi

Works procurement performance is critical to successful project delivery. However, early supplier involvement (ESI) has been touted in other industries to impact procurement…

Abstract

Purpose

Works procurement performance is critical to successful project delivery. However, early supplier involvement (ESI) has been touted in other industries to impact procurement performance positively. Works procurement has been attracting significant attention from major players due to poor performance characterized by poor performance, budget overruns and incompetence. Hence, the purpose of this study was to assess the impact of ESI on public works procurement performance.

Design/methodology/approach

Based on a thorough review of the literature for a pilot survey, the main questionnaires were administered to 103 public procurement officers. To assess the impact of ESI on public works procurement performance, three constructs that served as factors for implementing ESI and five that measure works procurement performance were validated using partial least square structural equation modelling (PLS-SEM).

Findings

The outcome of this study shows a significant positive impact of ESI on works procurement performance. This included communication, trust and supplier capabilities. The study further showed that even though cost, schedule, quality, health and safety are essential, sustainability measures are also crucial for work procurement.

Research limitations/implications

The results of this study could help firms make better decisions regarding public works procurement by encouraging ESI. This will likely significantly impact the successful project delivery and preservation of sustainability and efficiency objectives.

Originality/value

The application of PLS-SEM analysis in this study provides insights into how ESI can impact the procurement of public works in Ghana.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 13 October 2022

Arka Ghosh, Jemal Abawajy and Morshed Chowdhury

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the…

Abstract

Purpose

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the effective utilisation of emergent digital technologies and a need for a managerial shift for its smooth adoption.

Design/methodology/approach

A total of 3,046 peer-reviewed journal review articles covering Internet of Things (IoT), blockchain, building information modelling (BIM) and digital technologies within the construction sector were reviewed using scientometric mapping and weighted mind-map analysis techniques.

Findings

Prominent research clusters identified were: practice-factor-strategy, system, sustainability, BIM and construction worker safety. Leading countries, authors, institutions and their collaborative networks were identified with the UK, the USA, China and Australia leading this field of research. A conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Originality/value

The study traces the origins of the initial application of Industry 4.0 concepts in the construction field and reviews available literature from 1983 to 2021. It raises awareness of the latest developments and potential landscape realignment of the construction industry through digital technologies conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 23 February 2024

Xinnan Liu, Jiani Meng, Jiayi Wang and Yingbo Ji

This study adopts the perspective of dynamic capabilities to investigate influencing factors and proposes improvement strategies of supply chain resilience of prefabricated…

Abstract

Purpose

This study adopts the perspective of dynamic capabilities to investigate influencing factors and proposes improvement strategies of supply chain resilience of prefabricated construction.

Design/methodology/approach

The structural equation model (SEM) is used to identify and verify the relationship between factors influencing supply chain resilience of prefabricated construction from the perspective of dynamic capabilities. The system dynamics (SD) model is constructed to dynamically simulate the specific effects of different influencing factors.

Findings

Results indicate that: (1) An evaluation index system for supply chain resilience of prefabricated construction containing five first-level indicators and 36 second-level indicators is constructed; (2) Ability to anticipate, ability to respond, ability to adapt, ability to recover and ability to learn are positively correlated with the supply chain resilience of prefabricated construction and (3) ANT3 (information system), RES1 (quick response), ADA3 (buffer stock) and LEA4 (trust) are the most leading factors influencing supply chain resilience of prefabricated construction over time.

Originality/value

This study fulfills the need for an in-depth exploration of the various influencing factors on supply chain resilience of prefabricated construction from the perspective of dynamic capabilities. Furthermore, this study provides improvement strategies to enhance supply chain resilience of prefabricated construction in China.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 September 2022

Najib AL-Fadhali

Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders…

Abstract

Purpose

Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders on delaying project delivery. This research aims to propose the internal stakeholders' influence as a solution to improving project delivery performance (PDP) in order to boost the value of investment in the construction industry's projects.

Design/methodology/approach

In Yemen, a structured questionnaire was distributed to owners, consultants and contractors, 283 of which were found usable after the data screening. A purposeful sampling technique was used and structural equation modelling (SEM) was adopted for analysis. The structural model was drawn up, based on seven categories of influencing factors: labour, supplier, designer, contractor, consultant, sub-contractor and owner.

Findings

The results of the structural model suggest that of these seven categories, designers, owners, suppliers and subcontractors have a significant p-value and impact on PDP, while the labour and consultant's impact was not substantiated. The findings support the proposal that internal stakeholders' influence contributes directly to construction PDP.

Originality/value

The influence of stakeholders on PDP is important. Nonetheless, few studies have focussed on their effectiveness, especially in developing countries. This paper's contribution is evaluating the cause–effect relationship between stakeholders' influence and construction PDP through analysis of moment structures (AMOS) analysis. The policy implications of the research are to encourage governments in general and construction companies in particular to take responsibility for improving PDP, as slow execution of construction projects leads to increased costs, failure and abandoning projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Abstract

Details

Understanding Intercultural Interaction: An Analysis of Key Concepts, 2nd Edition
Type: Book
ISBN: 978-1-83753-438-8

1 – 10 of over 10000