1 – 10 of over 2000Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva
Past studies highlight a wide range of labour-related problems resulting in productivity loss in the construction industry of many developing countries. This study aims to…
Abstract
Purpose
Past studies highlight a wide range of labour-related problems resulting in productivity loss in the construction industry of many developing countries. This study aims to quantify the impacts of labour-related factors on the productivity of construction operations in Sri Lankan building projects based on the viewpoint of engineers and construction managers for upgrading management/organisational policies and practices.
Design/methodology/approach
Qualitative and quantitative approaches were used to identify the critical factors. Further, a series of industry consultative discussions were conducted through problem-based communication approaches to analyse the actions required.
Findings
A total of 21 factors were determined as critical, where skills shortage, labourers’ thinking abilities, work experience, knowledge in construction works and discipline were leading in the list. The statistical tests and the experts’ discussion outcomes ensured the validity and reliability of the study findings.
Research limitations/implications
The study outcomes will contribute to finding out better ways for directing labour in the industry practices and revising organisational policies towards achieving higher productivity levels in construction operations. Though the study findings are limited to the Sri Lankan context, some findings may be tested in other developing countries in similar scenarios.
Originality/value
The study findings show why the identified factors are critical, how those influence construction practices and what actions need to be considered for addressing the industry’s productivity-related challenges. These can play a key role in upgrading the construction management practices and organisational policies to the near-future stages.
Details
Keywords
Cathal Ryan, Darragh Faherty, John P. Spillane, Jim G. Bradley, Mohamed Issa and Elma McMahon
To examine the perspective of third-level university students in the context of the value proposition of construction apprenticeships in Ireland.
Abstract
Purpose
To examine the perspective of third-level university students in the context of the value proposition of construction apprenticeships in Ireland.
Design/methodology/approach
The research uses a qualitative method, conducting semi-structured interviews with 20 third-level university students enrolled on a Bachelor of Science (Honours) degree program in Construction Management in Ireland.
Findings
The results highlight six themes. These include that society appears to be directly and/or indirectly steering students towards university. This is driven by what appears to be a prevailing stigma in that apprenticeships are not seen as an achievement by society. Also, apprenticeships are seen as a limited career choice, while also being one which appears to repel female entrants.
Practical implications
If the shortage of new skilled workers entering the construction industry continues, construction organisations will not have the necessary resources to tender for, and subsequently, complete new work.
Social implications
The perception of what could have been seen as potential new apprenticeship entrants, but ultimately chose university, is worth examining further with a view to industry addressing the shortcomings identified. This therefore can provide an opportunity to stem the tide of reducing apprenticeship numbers, while also providing a viable alternative to university for those who wish to pursue alternative routes of entering the sector.
Originality/value
The paper uniquely focuses on the third-level university student's perspectives and what influenced their decision to pursue third-level university education over that of an apprenticeship within the built environment; an area which has yet to be investigated.
Details
Keywords
Eleni Papadonikolaki, Algan Tezel, Ibrahim Yitmen and Per Hilletofth
Rapid advancements in blockchain technology transform various sectors, attracting the attention of industrialists, practitioners, policymakers and academics, and profoundly affect…
Abstract
Purpose
Rapid advancements in blockchain technology transform various sectors, attracting the attention of industrialists, practitioners, policymakers and academics, and profoundly affect construction businesses through smart contracts and crypto-economics. This paper explores the blockchain innovation ecosystem in construction.
Design/methodology/approach
Through a qualitative study of 23 diverse interviewees, the study explores how open or closed the blockchain innovation ecosystem in construction is and who its emerging orchestrators are.
Findings
The data showed that construction aims towards an open innovation blockchain ecosystem, although there are elements of hybridisation and closedness, each system pointing out to different orchestrators.
Practical implications
The study has implications for governments and large companies in construction, showing that open innovation initiatives need to be encouraged by policymakers through rules, regulations and government-sponsored demonstrator projects.
Social implications
The data showed that there is lack of readiness for business model change to support open innovation blockchain ecosystems in construction.
Originality/value
This is the first study applying the open innovation theory in the construction industry and sheds light into the phenomenon of blockchain, suggesting routes for further democratisation of the technology for policymakers and practitioners.
Details
Keywords
Abdulmohsen S. Almohsen, Naif M. Alsanabani, Abdullah M. Alsugair and Khalid S. Al-Gahtani
The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the…
Abstract
Purpose
The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the quality of the owner's estimation for predicting precisely the contract cost at the pre-tendering phase and avoiding future issues that arise through the construction phase.
Design/methodology/approach
This paper integrated artificial neural networks (ANN), deep neural networks (DNN) and time series (TS) techniques to estimate the ratio of a low bid to the OEC (R) for different size contracts and three types of contracts (building, electric and mechanic) accurately based on 94 contracts from King Saud University. The ANN and DNN models were evaluated using mean absolute percentage error (MAPE), mean sum square error (MSSE) and root mean sums square error (RMSSE).
Findings
The main finding is that the ANN provides high accuracy with MAPE, MSSE and RMSSE a 2.94%, 0.0015 and 0.039, respectively. The DNN's precision was high, with an RMSSE of 0.15 on average.
Practical implications
The owner and consultant are expected to use the study's findings to create more accuracy of the owner's estimate and decrease the difference between the owner's estimate and the lowest submitted offer for better decision-making.
Originality/value
This study fills the knowledge gap by developing an ANN model to handle missing TS data and forecasting the difference between a low bid and an OEC at the pre-tendering phase.
Oluseun Olubajo, Will Hughes and Libby Schweber
The purpose of the study is to explore the dominant ideas in research on the management of time in construction. The focus of research has been to improve techniques for…
Abstract
Purpose
The purpose of the study is to explore the dominant ideas in research on the management of time in construction. The focus of research has been to improve techniques for optimising the timing and sequence of activities.
Design/Methodology/Approach
A critical review of research on construction time management, challenging the typical focus. We examine the assumptions different authors make, underline the limitations of the dominant research approaches and examine the prospects for developing a new approach to researching these issues.
Findings
The dominant approach in literature focuses on unique activity traits in construction planning and measurable patterns between time-related variables. This assumes that time in construction can be managed by changing the way activities are calculated. These approaches have not been correlated with improvement in performance. Social practice theory may help to explain how programmes figure as one of many objects used during construction.
Research Limitations/Implications
The focus is on reviewing indicative literature from key journals in construction management. The implication is that research is needed about how such documents are used in practice, which goes further than optimising plans in theory.
Practical Implications
Future research could focus on understanding the context of construction planning practice and shift the debate from a focus on optimisation to practice.
Originality/Value
An interpretivist approach with a focus on how tools such as planning documents are used on site. Social practice theory may provide a clearer explanation of the place of construction planning within the practice of construction management. This could provide solutions that deal effectively with stakeholder expectations around timely completion of construction projects.
Details
Keywords
Ornella Tanga Tambwe, Clinton Ohis Aigbavboa and Opeoluwa Akinradewo
Data represents a critical resource that enables construction companies’ success; thus, its management is very important. The purpose of this study is to assess the benefits of…
Abstract
Purpose
Data represents a critical resource that enables construction companies’ success; thus, its management is very important. The purpose of this study is to assess the benefits of construction data risks management (DRM) in the construction industry (CI).
Design/methodology/approach
This study adopted a quantitative method and collected data from various South African construction professionals with the aid of an e-questionnaire. These professionals involve electrical engineers, quantity surveyors, architects and mechanical, as well as civil engineers involved under a firm, or organisation within the province of Gauteng, South Africa. Standard deviation, mean item score, non-parametric Kruskal–Wallis H test and exploratory factor analysis were used to analyse the retrieved data.
Findings
The findings revealed that DRM enhances project and company data availability, promotes confidentiality and enhances integrity, which are the primary benefits of DRM that enable the success of project delivery.
Research limitations/implications
The research was carried out only in the province of Gauteng due to COVID-19 travel limitations.
Practical implications
The construction companies will have their data permanently in their possession and no interruption will be seen due to data unavailability, which, in turn, will allow long-term and overall pleasant project outcomes.
Originality/value
This study seeks to address the benefits of DRM in the CI to give additional knowledge on risk management within the built environment to promote success in every project.
Details
Keywords
Oluseyi Julius Adebowale and Justus Ngala Agumba
Labour productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades. Although several scholarly research projects…
Abstract
Purpose
Labour productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades. Although several scholarly research projects have been conducted to salvage the prevalent low labour productivity in construction, contractors in the construction industry have continued to grapple with the devastating impact of low productivity. The purpose of this study is to determine key areas of focus necessary to promote productivity growth in construction.
Design/methodology/approach
Bibliometric and scientometric assessments were conducted to map the existing construction labour productivity (CLP) studies and establish key focus areas in the research domain. The keywords “Construction Productivity” OR “Construction Labour Productivity” OR “Construction Labor Productivity” OR “Construction Worker Productivity”.
Findings
Emerging trends in the CLP research field are reported. The study also determined the most productive authors and collaboration among authors, most productive journals, most active regions and publications with the highest impact in CLP research.
Research limitations/implications
Documents published in the Scopus database were considered for analysis because of the wider coverage of the database. Journal and conference articles written in English language represent the inclusion criteria, while articles in press, review, book chapters, editorial, erratum, note, short survey and data paper were excluded from analysis. The study is also limited to documents published from 2012 to 2021.
Practical implications
The study brought to the awareness of the industry practitioners and other construction stakeholders, the key knowledge areas that are critical to promoting productivity growth in construction.
Originality/value
Except bibliometric analysis, previous research studies have used different approaches to investigate productivity in construction. The study presented future research directions through the emerging knowledge areas identified in the study.
Details
Keywords
Abderisak Adam and Göran Lindahl
The purpose of this paper is to examine the Company Dynamic Response Map (CDRM) risk management model that uses the dynamic capabilities concept. The study examines risks…
Abstract
Purpose
The purpose of this paper is to examine the Company Dynamic Response Map (CDRM) risk management model that uses the dynamic capabilities concept. The study examines risks associated with strategic decision-making in construction projects and evaluates proposed methods that connect the dynamic capabilities of project-based organisations with risk management.
Design/Methodology/Approach
This preliminary study examines risks associated with strategic decision-making in construction projects and evaluates a proposed model that connects the dynamic capabilities of project-based organisations with risk management. Specifically, the CDRM model is evaluated, a risk management model developed by Arena et al. (2013) to better respond to risks and opportunities based on the concept of dynamic capabilities.
Findings
We argue that although the CDRM presents a promising development in that it uses dynamic capabilities prospectively in a risk management model to produce tangible results, there are, nonetheless, impediments to the CDRM being used by construction clients. The primary impediment relates to the issue of categorisation, the difficulty in assigning a specific identified risk to a particular category of dynamic capabilities.
Research Limitations/Implications
A conceptual argument is made and not an empirical one.
Practical Implications
The CDRM model was developed to be used in practice and this paper evaluates that model.
Originality/Value
Contributes to both the dynamic capabilities literature as well as risk management literature. The paper ends with a discussion on the possible merits of the CDRM, and an evaluation on potential impediments to its use by construction clients.
Details
Keywords
This paper aims to provide top-level design and basic platform for intelligent application in China high-speed railway.
Abstract
Purpose
This paper aims to provide top-level design and basic platform for intelligent application in China high-speed railway.
Design/methodology/approach
Based on the analysis for the future development trends of world railway, combined with the actual development needs in China high-speed railway, The definition and scientific connotation of intelligent high-speed railway (IHSR) are given at first, and then the system architecture of IHSR are outlined, including 1 basic platform, 3 business sectors, 10 business fields, and 18 innovative applications. At last, a basic platform with cloud edge integration for IHSR is designed.
Findings
The rationality, feasibility and implementability of the system architecture of IHSR have been verified on and applied to the Beijing–Zhangjiakou high-speed railway, providing important support for the construction and operation of the world’s first IHSR.
Originality/value
This paper systematically gives the definition and connotation of the IHSR and put forward the system architecture of IHSR for first time. It will play the most important role in the design, construction and operation of IHSR.
Details
Keywords
Kaleem Ullah, Irene Lill and Emlyn Witt
Building Information Modeling (BIM) is a revolutionary innovation in the construction industry to virtually design and mange projects throughout the building lifecycle. Although…
Abstract
Purpose
Building Information Modeling (BIM) is a revolutionary innovation in the construction industry to virtually design and mange projects throughout the building lifecycle. Although Estonia is one of the foremost countries in the Information and Communications Technology (ICT) sector, BIM adoption in the Estonian construction industry is still lagging behind other countries. This paper is part of doctoral research that aims to determine the barriers to BIM adoption and develop a framework for effective implementation of BIM in the Estonian construction industry. The purpose of this paper is to examine the status of BIM adoption, BIM benefits and common barriers to BIM adoption in the construction industry worldwide.
Design/Methodology/Approach
The methodology used in this study is a literature review of journal articles, conference proceedings and published reports from various sources.
Findings
This study showed BIM benefits through building lifecycle phases and explored the BIM adoption rate in the construction industry of various countries. Eighteen barriers to BIM adoption were also identified.
Research Limitations/Implications
The study presented is limited to a literature review – some related literature may have been missed.
Practical Implications
The main practical significance of this study is that the findings can be used to inform a further survey to model the barriers to BIM adoption in the Estonian construction industry.
Originality/Value
This study offers information on BIM adoption in the construction industry and will form the basis of further research.