Search results

1 – 10 of 133
Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 25 November 2022

Zhijia You

The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a…

Abstract

Purpose

The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a systematic perspective. The purpose of this paper is to fill this gap.

Design/methodology/approach

This research adopts a deductive research approach.

Findings

This research proposes a reference architecture and related business scenario framework for intelligent construction based on the existing theory and industrial practice.

Originality/value

The main contribution of this research is to provide a useful reference to the Chinese government and industry for formulating digital transformation strategies, as well as suggests meaningful future research directions in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 November 2022

Alan J. McNamara, Sara Shirowzhan and Samad M.E. Sepasgozar

This paper aims to identify the relevant contributing constructs of readiness for the implementation of intelligent contracts (iContracts) in the construction industry. This study…

Abstract

Purpose

This paper aims to identify the relevant contributing constructs of readiness for the implementation of intelligent contracts (iContracts) in the construction industry. This study investigates the relationship between the personality dimensions of technology readiness index (TRI) and the system specific factors of technology acceptance model (TAM) within the context of iContracts.

Design/methodology/approach

Drawing insights from the extant literature and the author's previous qualitative investigations into iContract readiness constructs, a quantitative approach is used to operationalise the constructs by offering relevant statements to be measured and validated through a multiple-item scale against the users intent to accept the future iContract technology.

Findings

This study confirms and validates the relationship of the proposed iContract readiness index (iCRI) statements against the established TAM factors by offering 18 new constructs influencing technology readiness of the iContract technology. This study proves 9 of the 12 hypotheses highlighting key factors to be addressed for the successful development of the iContract technology.

Practical implications

This paper contributes to the body of knowledge by proposing a novel iCRI that informs an iContract technology readiness acceptance model (iCTRAM) for a trending technology. The iCTRAM can guide developers in producing an appropriate iContract solution and assess the readiness of users and organisations for the successful adoption of the iContract concept.

Originality/value

This study offers a unique theoretical framework, in an embryonic field, for predicting the success of iContract implementation within construction organisations. This study combines the established studies of TRI and TAM in producing a predictive iContract readiness assessment tool.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 April 2024

Elaine Pinto Varela Alberte and Gabriel de Oliveira Novelli

This paper aims to analyze practices, processes and outcomes related to construction supply chain management (CSCM) in Brazil to identify opportunities and direct actions and…

Abstract

Purpose

This paper aims to analyze practices, processes and outcomes related to construction supply chain management (CSCM) in Brazil to identify opportunities and direct actions and strategies to improve the Brazilian sector through blockchain technology (BT).

Design/methodology/approach

The study collected empirical data through semi-structured interviews with consumers and distributors to identify how the CSCM functions today. The interviews were structured and analyzed around the following topics: processes, digitalization, quality and weakness of the activities performed. The opportunities for using BT in CSCM were identified by crossing these results with evidence in the bibliography.

Findings

The study identified deficiencies, gaps and good practices applied to information management in the sector. Also, it analyzed the features, drivers and barriers of BT from a practical perspective. The findings suggested that BT is feasible and promising, reducing costs and enhancing process transparency. The need to overcome cultural and economic barriers is a challenging task.

Originality/value

This study brings a new perspective on using BT in CSCM, relating it to the demands and particularities of the construction sector in Brazil. The study identifies a limited panorama of chronic CSCM concerns, given BT’s infinite opportunities. And it motivates a gradual transition toward installing a new technological culture based on BT that focuses on priority care for the sector’s chronic deficiencies. The results can guide practical actions for the successful insertion of BT in the CSCM, laying the foundations for significant future research.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 March 2022

Innocent Chigozie Osuizugbo, Kevin Chuks Okolie and Olalekan Shamsideen Oshodi

Improving buildability of building designs with the aid of buildability assessment is essential because of the effect of designs on construction. Despite the plethora of research…

Abstract

Purpose

Improving buildability of building designs with the aid of buildability assessment is essential because of the effect of designs on construction. Despite the plethora of research into buildability reported over the years, a review of the literature shown a dearth of research into the factors supporting the implementation of buildability assessment. Because buildability assessment has been confirmed to be highly beneficial to construction business, this study aims to investigate the factors supporting the implementation of buildability assessment as a tool for buildability improvement using Nigeria as a representative case.

Design/methodology/approach

Survey research method was adopted for the study. Questionnaires were administered to a purposively selected group of architects, engineers, builders and quantity surveyors involved in construction project delivery within client, consulting and contracting organisations in Nigeria. A total of 368 questionnaires were distributed among the sampled participants, out of which, a total of 219 representing 60% were sufficiently filled and returned. Data collected were analysed using inferential and descriptive statistics.

Findings

The results revealed owner’s commitment, clients’ awareness of the benefits of conducting buildability assessment on building design, unity amongst different professionals in the construction industry, designers consider buildability important, adequate coordination amongst different design disciplines, adequate channel for co-ordination and communication between designers and constructors at the design stage and adequate support from the government as the top most seven factors supporting buildability assessment implementation in construction sector of Nigeria. Secondly, the results from the research revealed that there is no statistically significant difference in factors supporting buildability assessment implementation in construction between clients and consulting and contracting construction organisations in Nigeria.

Originality/value

The findings provide in-depth insight of the factors supporting the implementation of buildability assessment in construction that can help principal stakeholders in construction to facilitate development of strategies required in supporting the adoption and implementation of buildability assessment tool for buildability improvement.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 23 January 2024

Luís Jacques de Sousa, João Poças Martins, Luís Sanhudo and João Santos Baptista

This study aims to review recent advances towards the implementation of ANN and NLP applications during the budgeting phase of the construction process. During this phase…

Abstract

Purpose

This study aims to review recent advances towards the implementation of ANN and NLP applications during the budgeting phase of the construction process. During this phase, construction companies must assess the scope of each task and map the client’s expectations to an internal database of tasks, resources and costs. Quantity surveyors carry out this assessment manually with little to no computer aid, within very austere time constraints, even though these results determine the company’s bid quality and are contractually binding.

Design/methodology/approach

This paper seeks to compile applications of machine learning (ML) and natural language processing in the architectural engineering and construction sector to find which methodologies can assist this assessment. The paper carries out a systematic literature review, following the preferred reporting items for systematic reviews and meta-analyses guidelines, to survey the main scientific contributions within the topic of text classification (TC) for budgeting in construction.

Findings

This work concludes that it is necessary to develop data sets that represent the variety of tasks in construction, achieve higher accuracy algorithms, widen the scope of their application and reduce the need for expert validation of the results. Although full automation is not within reach in the short term, TC algorithms can provide helpful support tools.

Originality/value

Given the increasing interest in ML for construction and recent developments, the findings disclosed in this paper contribute to the body of knowledge, provide a more automated perspective on budgeting in construction and break ground for further implementation of text-based ML in budgeting for construction.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 6 July 2022

Klara Granheimer, Tina Karrbom Gustavsson and Per Erik Eriksson

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the…

Abstract

Purpose

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the uncertainties. Despite that, studies on the public procurement of engineering services are scarce. Although scholars have shown that uncertainty may affect the choice of control modes, the level of uncertainty that characterises services is not addressed by the two task characteristics: knowledge of the transformation process and output measurability. The purpose is to investigate organisational control in public procurement of engineering services.

Design/methodology/approach

The existing control model was adjusted in this study by conceptually adding uncertainty as a third aspect to the two task characteristics. A single case study of the Swedish Transport Administration was used. The empirical data, comprising 14 interviews with managers from the client and engineering consulting companies, were analysed using flexible pattern matching and visual mapping approaches and then illustrated using the model.

Findings

The public client did not base its choice of control modes on uncertainty, but rather on the other two task characteristics. Consequently, the service providers argued that the chosen control modes reduced their creativity, increased their financial risks and caused unclear responsibilities. This study therefore shows that uncertainty is an important factor to consider in the choice of control modes, both from a theoretical perspective and from the service providers' point of view. The developed model may therefore be useful for researchers as well as practitioners.

Originality/value

This study is the first attempt to add uncertainty as a task characteristic when choosing control modes. The results contribute to the scarce control literature regarding the procurement of engineering services for construction projects and the procurement of other services with high uncertainty.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 26 March 2024

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Noor Alyani Nor Azazi and Okechukwu Dominic Saviour Duru

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle…

Abstract

Purpose

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle in the 21st century. Revit has been identified as a frequently used tool for delivering BIM in the built environment. Studies about BIM technology via Revit are scarce in training middle-level workforce higher education institutions. Thus, this study aims to investigate the relevance of BIM technology and offer measures to promote digitalisation in Nigeria’s built environment polytechnic undergraduates via Revit.

Design/methodology/approach

Given the unexplored nature of training the middle-level workforce in Nigeria, 37 semi-structured virtual interviews were conducted across Nigeria, and saturation was achieved. The participants were knowledgeable about construction-related BIM. The researchers used a thematic analysis for the collected data and honed them with secondary sources.

Findings

Improved visualisation of design, effective and efficient work productivity, automatic design and quantification, improved database management and collaboration and data storage in the centrally coordinated model, among others, emerged as BIM’s benefits. BIM technology via Revit is challenging, especially in Nigeria’s polytechnic education curriculum. The 24 perceived issues were grouped into government/regulatory agencies-related, polytechnic management-related and polytechnic undergraduate students-related hindrances in Nigeria’s built environment.

Research limitations/implications

This study is limited to BIM implications for Nigeria’s built environment polytechnic undergraduates.

Originality/value

This study contributes to the literature paucity in attempting to uncover perceived issues hindering the implementation of BIM technology via Revit in training Nigeria’s built environment polytechnic undergraduates via a qualitative approach.

Article
Publication date: 26 April 2024

Mawloud Titah and Mohammed Abdelghani Bouchaala

This paper aims to establish an efficient maintenance management system tailored for healthcare facilities, recognizing the crucial role of medical equipment in providing timely…

Abstract

Purpose

This paper aims to establish an efficient maintenance management system tailored for healthcare facilities, recognizing the crucial role of medical equipment in providing timely and precise patient care.

Design/methodology/approach

The system is designed to function both as an information portal and a decision-support system. A knowledge-based approach is adopted centered on Semantic Web Technologies (SWTs), leveraging a customized ontology model for healthcare facilities’ knowledge capitalization. Semantic Web Rule Language (SWRL) is integrated to address decision-support aspects, including equipment criticality assessment, maintenance strategies selection and contracting policies assignment. Additionally, Semantic Query-enhanced Web Rule Language (SQWRL) is incorporated to streamline the retrieval of decision-support outcomes and other useful information from the system’s knowledge base. A real-life case study conducted at the University Hospital Center of Oran (Algeria) illustrates the applicability and effectiveness of the proposed approach.

Findings

Case study results reveal that 40% of processed equipment is highly critical, 40% is of medium criticality, and 20% is of negligible criticality. The system demonstrates significant efficacy in determining optimal maintenance strategies and contracting policies for the equipment, leveraging combined knowledge and data-driven inference. Overall, SWTs showcases substantial potential in addressing maintenance management challenges within healthcare facilities.

Originality/value

An innovative model for healthcare equipment maintenance management is introduced, incorporating ontology, SWRL and SQWRL, and providing efficient data integration, coordinated workflows and data-driven context-aware decisions, while maintaining optimal flexibility and cross-departmental interoperability, which gives it substantial potential for further development.

Details

Journal of Quality in Maintenance Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1355-2511

Keywords

1 – 10 of 133