Search results

1 – 10 of over 1000
Article
Publication date: 5 April 2011

Hongping Yuan, Liyin Shen and Jiayuan Wang

The generation of construction and demolition waste in China is a pressing need to be minimized in order to alleviate the environmental burden. The effectiveness of implementing…

4365

Abstract

Purpose

The generation of construction and demolition waste in China is a pressing need to be minimized in order to alleviate the environmental burden. The effectiveness of implementing construction and demolition waste management in this economy, however, is very limited due to various barriers. Therefore, this paper aims to explore the major obstacles to managing construction and demolition waste in China.

Design/methodology/approach

The views from Chinese practitioners were collected via a questionnaire survey. The respondents were invited to rate a total of 16 obstacles that hinder the effective implementation of construction and demolition waste management as gleaned from previous literature and six semi‐structured interviews. The results of the questionnaire were analyzed by ranking analysis and factor analysis.

Findings

The findings show that “lack of a well‐developed waste recycling market”, “insufficient regulation support” andwaste reduction does not receive sufficient attention in construction design” are perceived as the three barriers of most importance. Furthermore, the 16 obstacles could be grouped into five underlying components including: component 1 – weak awareness and inadequate training, component 2 – insufficient support of the authority, component 3 – economic consideration, component 4 – immature market and component 5 – barriers related to site activity.

Practical implications

Based on the findings, industry practitioners' understandings about the barriers to better performing construction and demolition waste management in China can be deepened. Furthermore, the results also provide useful information for developing strategies to improve the performance of construction and demolition waste management in China.

Originality/value

Major obstacles to improving the performance of construction and demolition waste management in China are identified and analyzed in this study.

Details

Facilities, vol. 29 no. 5/6
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 12 April 2022

Hamidreza Vosoughifar, S. Farzadi and SZ. Hosseininejad

Lean management has been used in various constructions around the world for more than a quarter of a century, and it is an important factor in the construction of new projects. In…

Abstract

Purpose

Lean management has been used in various constructions around the world for more than a quarter of a century, and it is an important factor in the construction of new projects. In relation to demolition management, only standards and codes and general principles of demolition of specific buildings were evaluated. The purpose of this study is providing relation between lean management on demolition processes of municipality buildings evaluated.

Design/methodology/approach

This study investigates the lean demolition of demolished and renovated buildings in a metropolitan area that can be extended to all cities. In the first stage, the effective factors in the demolition of the building based on lean management were identified through a valid questionnaire based on the valid Delphi approach. Social, economic and environmental considerations were considered in designing the appropriate questionnaire.

Findings

The modified approach between the fuzzy method and partial least squares was used to evaluate important variables. All of the modified processes were developed in MATLAB by the authors of this paper. The results show that customer-focused degradation parameter has the weakest effect and waste removal variable has the most effect on lean management.

Originality/value

Statistical results show that there is no significant difference between the effect of lean management on variables such as demolition time, quality and type of construction (p < 0.05).

Details

Journal of Facilities Management , vol. 21 no. 5
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 3 May 2023

Ala'a Saleh Alshdiefat, Ahlam Ammar Sharif, Albara' Ibrahim Alharahsheh, Shaban Ismael Albrka, Nils O.E. Olsson, Mohammad Younes and Sofie Bang

The purpose of this study is to explore the multifaceted challenge of managing construction and demolition waste within the context of the Jordan construction industry.

Abstract

Purpose

The purpose of this study is to explore the multifaceted challenge of managing construction and demolition waste within the context of the Jordan construction industry.

Design/methodology/approach

Using data sourced through desk research, interviews and questionnaires, this study examines the principal causes of increased volumes of construction and demolition waste, as well as the obstacles to both developing and implementing better waste management strategies.

Findings

This study identifies multiple causes of issues related to waste management and barriers to developing and implementing solutions and concludes by recommending a holistic approach to this multifaceted problem. A lack of adequate construction waste management infrastructure, regarding both physical facilities and regulations, was highlighted as the key challenge.

Social implications

The accumulation of waste that results from construction and demolition activity, and activities characterized by unsustainable utilization of raw materials and inefficiency are a global issue. The challenge of effectively managing construction waste is importantly tied to factors including the availability of the necessary infrastructure; economic conditions; and the scarcity of skilled laborers, among others.

Originality/value

This study focuses on the Jordan construction industry, which is so far not very well researched. By building upon previous studies, this study supports further research to illuminate the causes of waste and the barriers to better management, an issue that is not only a pillar of progress at the country level but also key for a sustainable development in general.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 22 October 2020

Angelo De Luca, Linda Chen and Koorosh Gharehbaghi

Due to the high demand of concrete, significant volume of natural resources is required, including virgin aggregates. Many studies have shown that the production of concrete has…

Abstract

Purpose

Due to the high demand of concrete, significant volume of natural resources is required, including virgin aggregates. Many studies have shown that the production of concrete has one of the highest CO2 levels. Although efforts are in place to recycle, enormous effects on landfill and the wider environment remain. Research has suggested the importance of reusing construction and demolition waste such as aggregate for use in recycled concrete. However, robust construction and demolition waste reduction strategies are required. There have been numerous researches on the use of recycled concrete and its management in the construction industry. This paper further consolidates this position.

Design/methodology/approach

This paper exhibits the barriers and benefits of using recycled aggregates for construction industry. This is achieved via reviewing the current construction and demolition waste reduction strategies used mainly in three countries: the UK, Australia and Japan. These countries were selected since they seemingly have similar construction industry and environment. Subsequently, evolving barriers and benefits of using recycled aggregates for construction industry are also reviewed and discussed. And to support such focus, robust construction and demolition waste reduction strategies will be advocated.

Findings

The findings are summarized as follows. The recycling construction and demolition waste could have a positive net benefit compared to the procurement and production of virgin aggregate materials with the same properties. This is not only financially beneficial but also environmentally viable, as fewer resources would be required to produce the same aggregate material. There are effective ways to achieve a high recycle rate target, as demonstrated by Japan. The implementation of a similar recycling process could be implemented globally to achieve a more effective recycle rate through the help of governments at all levels. By creating awareness about the financial and environmental benefits of using recycled aggregate products, large recycling companies can be also enticed to follow suit.

Practical implications

The findings from this paper can ultimately support the construction industry to further consolidate and advocate the use of recycled aggregates.

Originality/value

To achieve the research aim, this paper reviews some of the main sustainability factors of recycled aggregates (including coarse and fine aggregates) and provides comparison to virgin aggregates.

Details

International Journal of Building Pathology and Adaptation, vol. 39 no. 4
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 2 April 2019

Ruchini Senarath Jayasinghe, Raufdeen Rameezdeen and Nicholas Chileshe

The purpose of this paper is to explore the synergies between post-end-of-life of building (PEoLB) concepts and operations to achieve sustainability.

1014

Abstract

Purpose

The purpose of this paper is to explore the synergies between post-end-of-life of building (PEoLB) concepts and operations to achieve sustainability.

Design/methodology/approach

A systematic literature review (SLR) was conducted using 65 articles published between 2006 and 2017, and it has been subjected to descriptive and thematic analysis.

Findings

The descriptive analysis revealed that the majority of the articles were about (60 per cent) PEoLB operations, followed by (23 per cent) PEoLB concepts. Only 17 per cent of the articles have dealt with PEoLB-related strategic approaches. The thematic analysis elaborated on the literature development; interrelationships between PEoLB concepts and operations; impediments of introducing sustainability on these operations, remedial measures and information-based strategic approaches to achieve sustainability. Based on the findings, a conceptual framework for sustainable PEoLB operations is proposed. Furthermore, four areas of potential future research are discussed.

Research limitations/implications

This study presents a future research agenda including best practices to plan PEoLB operations and the development of optimisation models, risk management and information-based strategic approaches.

Practical implications

The proposed conceptual research framework triggers and nurtures potential pathways to introduce sustainable PEoLB operations under sound information flow. This could create a basis for future empirical studies in filling the identified gaps in literature. The framework could also assist practitioners in mitigating risks associated with transportation, storing and contamination of salvaged materials through enhanced information flow. In addition, the framework provides some managerial guidance to organisations seeking ways of establishing sustainability during reverse logistics (RL) operations.

Originality/value

This paper presents an SLR of an emerging area of research that encapsulates closed-loop supply chain through sustainable RL operations. The study highlights the interrelationships between PEoLB concepts and operations. It develops a robust approach to effectively manage the PEoLB operations underpinned by a sound information flow to facilitate sustainability.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 August 2023

Peng Nie, Kalani C. Dahanayake and Nipuni Sumanarathna

This paper aims to explore UAE's transition towards circular economy (CE) through construction and demolition waste (CDW) management in the pre-construction stage. The extent of…

Abstract

Purpose

This paper aims to explore UAE's transition towards circular economy (CE) through construction and demolition waste (CDW) management in the pre-construction stage. The extent of circularity is assessed by five key aspects of CE, such as policies and strategic frameworks, design for waste prevention, design for disassembly or deconstruction, use of prefabricated elements and CDW management plans.

Design/methodology/approach

Multiple case studies were conducted in the context of the Dubai construction industry (UAE). Three significant and unique construction projects were selected as the cases. Semi-structured interviews were carried out to collect data, and the thematic analysis technique and NVIVO 12 software were used for data analysis.

Findings

Findings reveal several positive initiatives towards CE in the UAE context; yet it is identified that the transition is still at the initial stage. Selected case studies, the best-case scenarios of UAE (i.e. influential cases), demonstrated adequate measures in relation to four key CE aspects out of five. For instance, (a) policies and strategic frameworks such as lean standards, green building standards and standards developed by the local authorities, (b) design for waste prevention (e.g. adherence to the 3R principle, and construction planning with BIM), (c) use of prefabricated elements and application of innovative construction technologies (e.g. 3DPC, DfMA) and (d) CDW management planning such as 3R principle were evident. However, the selected cases hardly showcase designing for disassembly or deconstruction.

Research limitations/implications

The existing CDW practices are mostly conventional, as most constructions in UAE are procured through conventional building materials and methods. Therefore, there is a necessity of encouraging CE principles in CDW management. Even though the transition towards CE was evident in four key CE aspects out of five, the UAE construction industry has yet to adopt more effective CE-based CDW management practices to accelerate the circularity. Hence, it is necessary to enforce standard waste management guidelines, including the 3R principle, to standardise CDW management in UAE and encourage construction practitioners to adhere to CE principles.

Originality/value

The findings of this study provide valuable insights for decision-making processes around CDW management towards a CE. This paper contributes to the literature by bridging the CE concept with CDW management in the pre-construction stage. The study provides insights for industry practitioners for planning CE in terms of policies and strategic frameworks, CDW management planning, construction planning and application of innovative construction technologies.

Details

Smart and Sustainable Built Environment, vol. 13 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 8 April 2024

Hasith Chathuranga Victar and Anuradha Samarajeewa Waidyasekara

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address…

Abstract

Purpose

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address these issues, this study explores the application of Circular Economy (CE) strategies in minimising waste generation and optimising resource utilisation in Sri Lankan construction industry. The research focuses on the construction and building renovation and use and operate stages of the building project life cycle, recognising their significance in waste generation and resource consumption.

Design/methodology/approach

The research employed a qualitative approach, utilising the Delphi technique through three rounds of expert interviews. Seventeen experts were involved in the first round, followed by fifteen in the second round, and twelve in the final round. The collected data was analysed using manual content analysis methods.

Findings

The research findings revealed fifteen C&D WM issues in the construction and building renovation stage in Sri Lanka, along with suitable strategies to overcome each of them. Similarly, eight C&D WM issues were identified for the use and operate stage of the building, and corresponding strategies were provided to address each issue. By adopting CE strategies such as modular design and material reuse, construction projects can optimise the project's timeline, cost, and quality factors. These strategies enable efficient resource allocation, reduce waste generation, and contribute to the overall sustainability of the project. The impact of CE strategies on mitigating these issues within the project management iron triangle was also discussed.

Originality/value

This paper entails delving into how construction, building renovation, and operation stages of a building's life cycle intersect with CE strategies, which profoundly influence operational efficiency and long-term sustainability. By incorporating principles such as energy efficiency, water conservation, and circular product design, the paper illuminates how these strategies facilitate decreased energy usage, enhanced resource management, and diminished waste production throughout the building's lifespan.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 November 2017

Bahareh Nikmehr, M. Reza Hosseini, Raufdeen Rameezdeen, Nicholas Chileshe, Parviz Ghoddousi and Mehrdad Arashpour

Factors influencing management of construction and demolition (C&D) waste within the Iranian context have yet to be investigated. The purpose of this paper is to define and

1444

Abstract

Purpose

Factors influencing management of construction and demolition (C&D) waste within the Iranian context have yet to be investigated. The purpose of this paper is to define and address this knowledge gap, through development of a model to map the associations among the primary factors affecting C&D waste at project, industry and national levels.

Design/methodology/approach

A conceptual model is developed based on synthesising the findings of available studies on factors affecting C&D waste with a focus on developing countries. For collecting data, the study drew upon a questionnaire survey of 103 Iranian construction practitioners. The strength and significance of associations among these factors to modify and validate the model were assessed using the structural equation modelling-partial least squares approach.

Findings

Major factors affecting C&D waste management and their level of importance were identified at project, industry and national levels. Results clearly showed that the government should review regulations pertaining to C&D waste management and make sure they are implemented properly. The “polluter pays principle” is a useful guide in devising effective policies and regulations for the Iranian context.

Originality/value

This study contributes to the field through presenting the first major study on C&D waste management in Iran. The study provides a picture of C&D waste management status quo in Iran and encapsulates the factors affecting C&D waste management in the Iranian context at different levels within an integrated model. The findings have practical implications for policy makers and construction practitioners in Iran, similar developing economies and foreign firms planning to operate in Iran.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 July 2019

Yoichiro Kunieda, Ricardo Codinhoto and Stephen Emmitt

The purpose of this paper is to develop a novel tool to support decision making for enhanced demolition process efficiency and material waste sortability through computerised 4D…

Abstract

Purpose

The purpose of this paper is to develop a novel tool to support decision making for enhanced demolition process efficiency and material waste sortability through computerised 4D motion workflow simulation.

Design/methodology/approach

A time-lapse evaluation model was developed to classify and estimate the impact of building demolition processes and material waste recovery. The dynamic assessment of demolition, collision and mechanical impact was measured through computerised 4D motion game and physics engines. Waste recovery and treatment complemented the simulation algorithm. The simulation of the information workflow was tested through case study using two demolition strategies.

Findings

The simulation successfully estimated the efficiency and efficacy of the different demolition strategies. Thus, simulation results can potentially support better decision making related to the definition of demolition strategies associated with recycling and re-use targets.

Research limitations/implications

The simulation was limited to a simple machine-led demolition strategy. Further research is required to understand the impact of complex machine mechanic movements and processes on complex building fabrics.

Originality/value

Modelling and evaluating the demolition process and its impact on material waste recovery with a time dimension is novel. The comparative analysis of quantitative data allows demolition professionals to find optimal and more sustainable demolition solutions and more efficient and safer implementation on site. It also contributes to a better understanding of the relationship between demolition strategy and waste sortability. This research represents a significant advancement in applied computing for building demolition waste recycling and notably, it improves the quality of information available in the definition of building demolition strategies.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 September 2023

Li Wang, Yanhong Lv, Tao Wang, Shuting Wan and Yanling Ye

The purpose of this research is to address the existing gap in the study of construction and demolition waste (C&DW) by focusing on its impact on human health throughout the…

Abstract

Purpose

The purpose of this research is to address the existing gap in the study of construction and demolition waste (C&DW) by focusing on its impact on human health throughout the entire life cycle. And this research provides a comprehensive assessment model that incorporates the release of gaseous pollutants and particulate matter during the whole life cycle of C&DW, thereby contributing to a more holistic understanding of its impact on human health.

Design/methodology/approach

The research was conducted in two stages. Firstly, the quantitative model framework of pollutants emitted by C&DW was established. Three types of pollutants were considered, namely nitrogen dioxide (NO2), sulfur dioxide (SO2) and inhalable particulate matter (PM10). Second, disability-adjusted life year (DALY) and willingness to pay (WTP) assessments were used to provide a monetary quantified health impact for pollutants released by C&DW.

Findings

The results show that the WTP value of PM10 is the highest among all pollutants and 8.68E+07 dollars/a, while the WTP value in the disposal stage accounts for the largest proportion compared to the generation and transportation stage. These findings emphasize the importance of PM10 and C&DW treatment stage for pollutant treatment.

Originality/value

The results of this study are of great significance for the management department to optimize the construction management scheme to reduce the total amount of pollutants produced by C&DW and its harm to human health. Meanwhile, this study fills the gap in existing research on the impact assessment of C&DW on human health throughout the whole life cycle, and provides reference and basis for future research and policy formulation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 1000