Search results

1 – 7 of 7
Article
Publication date: 19 December 2023

Zul-Atfi Ismail

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of…

Abstract

Purpose

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of statement), environmental, economic (campus development) and social (health and wellbeing). Because these standards have proven to be challenging to integrate, local governments are increasingly experimenting with social innovation (SI) as a bottom-up form of standard integration. This study aims to apply the concept of SI to the O&M processes of facilities management at polytechnics in Malaysia to identify problems with conventional working practices in this area and to recommend potential solutions.

Design/methodology/approach

The paper reviews evidence that conventional working methods generate significant problems related to paper-based forms, improper database management and flawed decision-making processes. Because of the lack knowledge about different ways of how standard integration is achieved, the comparison of three polytechnic institutions which are Rensselaer Polytechnic Institute (RPI) and Southern Polytechnic College of Engineering and Engineering Technology (SPCEET) in USA as well as Seberang Perai Polytechnic, Pulau Pinang (PSP) in Malaysia shares the ambition to realise standard integration of O&M through SI.

Findings

The findings reveal that SI leads to four ways of standard integration: computerised maintenance management system, online customer complaint, electronic form and relational database. Application of the concept of SI reveals the need for more sophisticated management solutions in the O&M processes of facilities management.

Originality/value

These standard integration arrangements unfortunately seem to mainly contribute to greater alignment between standard rather than true standard integration. The concept of SI will guide future improvements and developments in maintenance management systems to fulfil requirements in this area.

Details

Journal of Global Responsibility, vol. 15 no. 3
Type: Research Article
ISSN: 2041-2568

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

1290

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 18 March 2024

Shirley Jin Lin Chua, Shiuan Ping Beh, Nik Elyna Myeda and Azlan Shah Ali

This study aims to improve the use of digitalization in facilities management (FM) for shopping complex facilities in the post-COVID-19 era. The resumption of economic activities…

Abstract

Purpose

This study aims to improve the use of digitalization in facilities management (FM) for shopping complex facilities in the post-COVID-19 era. The resumption of economic activities, especially in shopping complexes, poses challenges for FM with throngs of shoppers. To tackle these challenges, enhanced and innovative FM practices are necessary.

Design/methodology/approach

The study used a qualitative research approach, incorporating case studies, interviews, observations and documentation. It focused on super-regional shopping complexes in the Klang Valley, Malaysia, selecting two complexes for qualitative data collection. Supplementary data were gathered from various sources, including government policy publications, websites, books, journal papers and archival records.

Findings

The research provides valuable insights into FM innovations and the application of FM digitalization in shopping complexes after the COVID-19 pandemic. It also addresses challenges faced by FM teams during this period. Recommendations for implementing FM digitalization in super-regional shopping complexes post-COVID-19 include developing skilled personnel, defining appropriate work scopes, strategies and policies, using cost-effective software, and increasing occupant awareness. The involvement of outsourced service providers is advised, emphasizing their understanding of the organization’s business model and innovative approaches.

Originality/value

The findings offer new perspectives on the characteristics of FM digitalization in the commercial sector during business disruptions caused by the pandemic. The proposed strategies are grounded in real industry implementations, aiming to enhance the FM digitalization approach for improved business performance.

Details

Facilities , vol. 42 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 17 April 2024

Zul-Atfi Ismail

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance…

Abstract

Purpose

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.

Findings

This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.

Originality/value

The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.

Details

Facilities , vol. 42 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 2 April 2024

Jorge Furtado Falorca

The purpose of this paper is to report on the results of a study carried out to identify and analyse which potential subject areas may have impact on developments in the field of…

Abstract

Purpose

The purpose of this paper is to report on the results of a study carried out to identify and analyse which potential subject areas may have impact on developments in the field of building maintenance (BM). That is, it is intended to contribute to the integration of new approaches so that building maintenance management (BMM) becomes as automated, digital and intelligent or smartness as possible in the near future.

Design/methodology/approach

The research approach has resulted in a theory that is essentially based on a qualitative design. The route followed was a literature review, involving the collection, analysis and interpretation of carefully selected information, mostly from recently published records. The data assembled and the empirical experience itself made it possible to present a comprehensive viewpoint and some future outlooks.

Findings

Five thematic areas considered as potentially impactful for BM developments have been highlighted, analysed and generically labelled as thematic base words, which are monitoring, automation, digitalisation, intelligence and smart. It is believed that these may be aspects that will lay the groundwork for a much more advanced and integrated agenda, featured by a high-tech vision.

Originality/value

This is thought to be a different way of looking at the problem, as it addresses five current issues together. Trendy technological aspects are quite innovative and advantageous for BMM, providing opportunities not yet widely explored and boosting the paradigm shift.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 June 2024

Pradipta Patra and Unni Krishnan Dinesh Kumar

Opportunistic and delayed maintenances are increasingly becoming important strategies for sustainable maintenance practices since they increase the lifetime of complex systems…

Abstract

Purpose

Opportunistic and delayed maintenances are increasingly becoming important strategies for sustainable maintenance practices since they increase the lifetime of complex systems like aircrafts and heavy equipment. The objective of the current study is to quantify the optimal time window for adopting these strategies.

Design/methodology/approach

The current study considers the trade-offs between different costs involved in the opportunistic and delayed maintenances (of equipment) like the fixed cost of scheduled maintenances, the opportunistic rewards that may be earned and the cost of premature parts replacement. The probability of the opportunistic maintenance has been quantified under two different scenarios – Mission Reliability and Renewal Process. In the case of delayed maintenance, the cost of the delayed maintenance is also considered. The study uses optimization techniques to find the optimal maintenance time windows and also derive useful insights.

Findings

Apart from finding the optimal time window for the maintenance activities the study also shows that opportunistic maintenance is beneficial provided the opportunistic reward is significantly large; the cost of conducting scheduled maintenance in the pre-determined slot is significantly large. Similarly, the opportunistic maintenance may not be beneficial if the pre-mature equipment parts replacement cost is significantly high. The optimal opportunistic maintenance time is increasing function of Weibull failure rate parameter “beta” and decreasing function of Weibull failure rate parameter “theta.” In the case of optimal delayed maintenance time, these relationships reverse.

Originality/value

To the best of our knowledge, very few studies exist that have used mission reliability to study opportunistic maintenance or considered the different cost trade-offs comprehensively.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 9 January 2024

Fadoua Benhamza Hlihel, Youness Chater and Abderrazak Boumane

Competencies are significant predictors of employee outcome. Nowadays, new technologies are changing maintenance processes and workflow. The role of employees and their…

Abstract

Purpose

Competencies are significant predictors of employee outcome. Nowadays, new technologies are changing maintenance processes and workflow. The role of employees and their competencies will therefore undergo decisive changes in the future. Therefore, a well-designed competency model for maintenance departments is important. The purpose of this paper is to develop a maintenance 4.0 competency model applicable to all industrial sectors by adapting it to the specificities of each sector.

Design/methodology/approach

The research methods consist of a comprehensive literature review on the main characteristics of the competency model and the individual competencies needed for the maintenance 4.0 employees. Interviews were conducted in order to validate and prioritize the required competencies for maintenance 4.0 employees identified in the literature.

Findings

The maintenance 4.0 competency model combines the required competencies in maintenance 4.0 and crosses the three hierarchical levels: managers, engineers and technicians. These competencies are organized in terms of four categories: technical, personal, social and methodological. In addition, a degree of importance for each competency is assigned as very important, moderately important and slightly important. As a result, this study identified the essential competencies for maintenance 4.0 stakeholders, where 12 competencies are considered very important for maintenance 4.0 technicians, 19 for engineers and 18 for managers.

Research limitations/implications

This work has some limitations. First, although the articles related to competencies and their classification were selected very carefully, it is difficult to eliminate the probability of overlooking publications. Second, the limitation of the study is based on the difficulty of implementing the model in a case study, given that a minority of industrial companies have implemented maintenance 4.0 technologies in Morocco.

Practical implications

This work has practical implications for both individuals and institutions (companies and academies) to cope with new competency requirements in maintenance 4.0. Organizations can use the model in the recruitment process and for the identification of training needs. The results of the research will also contribute to identifying the scope of competencies of the maintenance 4.0 actors (engineer, manager and technician), which, in practice, contributes to the creation of requirements for the candidates applying for a job in the maintenance department. Additionally, educational institutions should make the necessary changes to their curricula to suitably prepare students for the required maintenance 4.0 competencies.

Social implications

The social implications of the article result from the contribution to the development of maintenance competencies. Individuals can use this model for their own personal development. Furthermore, companies can use this model to define job profiles for vacancies in M4.0. Therefore, using the model for training program implementation has a positive effect on employee job satisfaction and employees ’morale.

Originality/value

This research develops a novel maintenance 4.0 competency model by categorizing the maintenance workforce into three hierarchical levels: managers, engineers and technicians. In addition, the competency requirement is prioritized to three degrees: very important, moderately important and slightly important. According to the previous studies conducted on maintenance 4.0 and employees' competencies, this study revealed that no research has developed a competency model for maintenance 4.0. Hence, this model is unique, generic and integrative since it presents the most relevant competencies for the three hierarchical levels. Moreover, this work combines the results of the literature review and the experts' returns. This model can be useful in the recruitment of new maintenance employees, the evaluation of their performance and the identification of training needs to cope with new changes in maintenance competencies.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 6
Type: Research Article
ISSN: 0265-671X

Keywords

1 – 7 of 7