Search results

1 – 10 of over 2000
Article
Publication date: 19 December 2023

Zul-Atfi Ismail

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of…

Abstract

Purpose

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of statement), environmental, economic (campus development) and social (health and wellbeing). Because these standards have proven to be challenging to integrate, local governments are increasingly experimenting with social innovation (SI) as a bottom-up form of standard integration. This study aims to apply the concept of SI to the O&M processes of facilities management at polytechnics in Malaysia to identify problems with conventional working practices in this area and to recommend potential solutions.

Design/methodology/approach

The paper reviews evidence that conventional working methods generate significant problems related to paper-based forms, improper database management and flawed decision-making processes. Because of the lack knowledge about different ways of how standard integration is achieved, the comparison of three polytechnic institutions which are Rensselaer Polytechnic Institute (RPI) and Southern Polytechnic College of Engineering and Engineering Technology (SPCEET) in USA as well as Seberang Perai Polytechnic, Pulau Pinang (PSP) in Malaysia shares the ambition to realise standard integration of O&M through SI.

Findings

The findings reveal that SI leads to four ways of standard integration: computerised maintenance management system, online customer complaint, electronic form and relational database. Application of the concept of SI reveals the need for more sophisticated management solutions in the O&M processes of facilities management.

Originality/value

These standard integration arrangements unfortunately seem to mainly contribute to greater alignment between standard rather than true standard integration. The concept of SI will guide future improvements and developments in maintenance management systems to fulfil requirements in this area.

Details

Journal of Global Responsibility, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2041-2568

Keywords

Article
Publication date: 18 March 2024

Shirley Jin Lin Chua, Shiuan Ping Beh, Nik Elyna Myeda and Azlan Shah Ali

This study aims to improve the use of digitalization in facilities management (FM) for shopping complex facilities in the post-COVID-19 era. The resumption of economic activities…

Abstract

Purpose

This study aims to improve the use of digitalization in facilities management (FM) for shopping complex facilities in the post-COVID-19 era. The resumption of economic activities, especially in shopping complexes, poses challenges for FM with throngs of shoppers. To tackle these challenges, enhanced and innovative FM practices are necessary.

Design/methodology/approach

The study used a qualitative research approach, incorporating case studies, interviews, observations and documentation. It focused on super-regional shopping complexes in the Klang Valley, Malaysia, selecting two complexes for qualitative data collection. Supplementary data were gathered from various sources, including government policy publications, websites, books, journal papers and archival records.

Findings

The research provides valuable insights into FM innovations and the application of FM digitalization in shopping complexes after the COVID-19 pandemic. It also addresses challenges faced by FM teams during this period. Recommendations for implementing FM digitalization in super-regional shopping complexes post-COVID-19 include developing skilled personnel, defining appropriate work scopes, strategies and policies, using cost-effective software, and increasing occupant awareness. The involvement of outsourced service providers is advised, emphasizing their understanding of the organization’s business model and innovative approaches.

Originality/value

The findings offer new perspectives on the characteristics of FM digitalization in the commercial sector during business disruptions caused by the pandemic. The proposed strategies are grounded in real industry implementations, aiming to enhance the FM digitalization approach for improved business performance.

Details

Facilities , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 7 September 2023

Chioma Okoro

Technological change drives transformation in most sectors of the economy. Industry 4.0 technologies have been applied at different stages of a building’s lifecycle. However…

Abstract

Purpose

Technological change drives transformation in most sectors of the economy. Industry 4.0 technologies have been applied at different stages of a building’s lifecycle. However, limited studies exist on their application in real estate facilities management (REFM). This study aims to assess the existing knowledge on the topic to suggest further research directions.

Design/methodology/approach

Scopus-indexed literature from 2013 to 2023 was examined and visualised using VOSviewer software to output quantitative (descriptive) results. Content analysis was used to complement the quantitative findings.

Findings

Findings indicated a concentration of research in China, Norway and Italy. The knowledge areas included three clusters: lifecycle integration and management, data curation and management and organisational and management capabilities. The benefits, challenges and support strategies were highlighted.

Research limitations/implications

More collaboration is needed across countries and territories on technology integration in REFM. Future research using alternative methodologies is recommended, with a focus on adopting and non-adopting REFM organisations. Further, implications for facility managers, employees, technology suppliers or vendors, training, organisations and management exist.

Practical implications

Further, implications for facility managers, employees, technology suppliers or vendors, training, organisations and management exist.

Originality/value

The study reveals the knowledge base on technology use in REFM. It adds to the evidence base on innovation and technology adoption in REFM.

Details

Facilities , vol. 41 no. 15/16
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 2 April 2024

Mahmoud Mawed

The UAE is among the fastest-growing facilities management (FM) markets globally. Nevertheless, conclusive evidence on this market is scarce in the literature. Therefore, this…

Abstract

Purpose

The UAE is among the fastest-growing facilities management (FM) markets globally. Nevertheless, conclusive evidence on this market is scarce in the literature. Therefore, this paper aims to provide an in-depth insight into the FM market in the UAE.

Design/methodology/approach

Fourteen interviewees were purposively selected to provide insight into FM status through their field experiences. A SWOT analysis of their answers held place.

Findings

Interviewees revealed that the main trends of FM in the UAE include interests in sustainability, integration of technology, health and safety, outsourcing FM, switching to total facilities management (TFM), and performance management systems use. Besides, the quality of the service in the FM market is driven by the real-estate boom, services sophistication, the increasing awareness of FM and focus on the quality of services. Furthermore, the interviews found that the recruitment of poorly skilled labors can threaten the FM market to meet the allocated budget, misperception of FM, the value of money, the lack of continuous follow-up with recent advancements in technologies and the lack of performance measurement models.

Originality/value

This paper highlights the major trends, drivers and threats of the FM market in the UAE, and the implications of its findings can direct FM organizations and researchers in their practices.

Article
Publication date: 24 April 2024

Mahmoud Mawed

Amidst the complicated nature of the UAE’s facilities management (FM) industry, the need to recalibrate the existing performance measurement (PM) system measures and criteria has…

Abstract

Purpose

Amidst the complicated nature of the UAE’s facilities management (FM) industry, the need to recalibrate the existing performance measurement (PM) system measures and criteria has been resonating to ensure their ability to capture the FM industry trends and dynamics, thus enhancing organizational excellence. Therefore, this research aimed to propose a specific PM tool to the country’s FM industry to accurately assess performance and establish strategic enhancements.

Design/methodology/approach

The study reviewed literature on the available PM systems to gather the available measures, which were presented to a focus group of seven participants, who were purposively selected based on their expertise in FM and PM implementation in the UAE to adjust them and add ones relevant to the UAE’s FM industry.

Findings

The focus group conducted various changes, from retaining certain measures and criteria, renaming them to simplify or make them more representative of the industry, ranking them based on their importance to limit their numbers, to finally categorizing them as enablers or results. Consequently, the final proposed tool was composed of nine dimensions with 51 measures as performance enablers and three dimensions with 11 measures as performance results. Seven measures were added by the experts, who highlighted their increasing popularity in the UAE’s FM industry.

Originality/value

Through addressing the critical void in literature, this paper develops a specific PM tool aligning with the intricacy of the UAE’s FM industry, thus providing proactive contribution to the industry’s effective and sustainable growth.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 11 May 2023

Marco D’Orazio, Gabriele Bernardini and Elisa Di Giuseppe

This paper aims to develop predictive methods, based on recurrent neural networks, useful to support facility managers in building maintenance tasks, by collecting information…

2704

Abstract

Purpose

This paper aims to develop predictive methods, based on recurrent neural networks, useful to support facility managers in building maintenance tasks, by collecting information coming from a computerized maintenance management system (CMMS).

Design/methodology/approach

This study applies data-driven and text-mining approaches to a CMMS data set comprising more than 14,500 end-users’ requests for corrective maintenance actions, collected over 14 months. Unidirectional long short-term memory (LSTM) and bidirectional LSTM (Bi-LSTM) recurrent neural networks are trained to predict the priority of each maintenance request and the related technical staff assignment. The data set is also used to depict an overview of corrective maintenance needs and related performances and to verify the most relevant elements in the building and how the current facility management (FM) relates to the requests.

Findings

The study shows that LSTM and Bi-LSTM recurrent neural networks can properly recognize the words contained in the requests, thus correctly and automatically assigning the priority and predicting the technical staff to assign for each end-user’s maintenance request. The obtained global accuracy is very high, reaching 93.3% for priority identification and 96.7% for technical staff assignment. Results also show the main critical building elements for maintenance requests and the related intervention timings.

Research limitations/implications

This work shows that LSTM and Bi-LSTM recurrent neural networks can automate the assignment process of end-users’ maintenance requests if trained with historical CMMS data. Results are promising; however, the trained LSTM and Bi-LSTM RNN can be applied only to different hospitals adopting similar categorization.

Practical implications

The data-driven and text-mining approaches can be integrated into the CMMS to support corrective maintenance management by facilities management contractors, i.e. to properly and timely identify the actions to be carried out and the technical staff to assign.

Social implications

The improvement of the maintenance of the health-care system is a key component of improving health service delivery. This work shows how to reduce health-care service interruptions due to maintenance needs through machine learning methods.

Originality/value

This study develops original methods and tools easily integrable into IT workflow systems (i.e. CMMS) in the FM field.

Article
Publication date: 29 January 2024

Klaudia Jaskula, Dimosthenis Kifokeris, Eleni Papadonikolaki and Dimitrios Rovas

Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is…

Abstract

Purpose

Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is exposing all relevant data as a single source of truth and facilitating continuous collaboration between stakeholders. A multitude of tools can be used as a CDE, however, it is not clear how the tools are used or if they fulfil the users’ needs. Therefore, this paper aims to investigate current practices of using CDEs for information management during the whole built asset’s life cycle, through a state-of-the-art literature review and an empirical study.

Design/methodology/approach

Literature data is collected according to the PRISMA 2020 guideline for reporting systematic reviews. This paper includes 46 documents in the review and conduct a bibliometric and thematic analysis to identify the main challenges of digital information management. To understand the current practice and the views of the stakeholders using CDEs in their work, this paper used an empirical approach including semi-structured interviews with 15 BIM experts.

Findings

The results indicate that one of the major challenges of CDE adoption is project complexity and using multiple CDEs simultaneously leading to data accountability, transparency and reliability issues. To tackle those challenges, the use of novel technologies in CDE development such as blockchain could be further investigated.

Originality/value

The research explores the major challenges in the practical implementation of CDEs for information management. To the best of the authors’ knowledge, this is the first study on this topic combining a systematic literature review and fieldwork.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 17 April 2024

Zul-Atfi Ismail

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance…

Abstract

Purpose

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.

Findings

This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.

Originality/value

The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.

Details

Facilities , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 28 February 2024

Thayla Zomer, Andy Neely and Paulo Savaget

How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon…

Abstract

Purpose

How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon from a project perspective. So far, there is limited understanding of how projects, which are composed by a constellation of organisations, “respond” to institutional pressures that are exerted on them. This research takes the perspective of projects as adopters/implementers of institutional pressures and analyses how they interact with, and respond to, such pressures. More specifically, this research explores how construction projects respond to the pressure of a Building Information Modelling (BIM) mandate.

Design/methodology/approach

Multiple in-depth case studies were conducted to explore the practical implementation of a BIM mandate in the UK and understand how the construction projects responded to the coercive pressures to implement a new policy mandate for process digitalisation. Multiple sources were employed for data collection and the data were analysed inductively. The findings identify a hybrid response comprising four distinct ways that projects might respond to an institutional pressure.

Findings

We find that projects decouple both from the content and from the intended purpose of a policy, i.e. there are two variance of a policy-practice decoupling phenomenon in projects. The findings also reveal the underlying conditions leading to decoupling.

Originality/value

We advance decoupling literature so that it better applies to the temporary, distributed and interdependent work conducted via projects. Second, we define decoupling in projects as a provisional and fragmented process of wayfinding through heterogeneous institutional spaces, and discuss the potential policy-practice assemblages in projects, influenced by how, if and when project members' activities decouple from the many and often contradicting institutional pressures they face. Third, we discuss how the qualitatively different forms of decoupling that we identified in our work may act as part of a legitimation process in ambiguous situations whereby projects might share a resemblance of conformity with institutional pressures when they are de facto only partially conforming to them.

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 1 April 2024

Frank Ato Ghansah

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the…

Abstract

Purpose

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the high complexity of accurately representing and modelling the physics behind the DTs process. This study thus organises and consolidates the fragmented literature on DTs implementation for smart buildings at the facility management stage by exploring the enablers, applications and challenges and examining the interrelationships amongst them.

Design/methodology/approach

A systematic literature review approach is adopted to analyse and synthesise the existing literature relating to the subject topic.

Findings

The study revealed six main categories of enablers of DTs for smart building at the facility management stage, namely perception technologies, network technologies, storage technologies, application technologies, knowledge-building and design processes. Three substantial categories of DTs application for smart buildings were revealed at the facility management stage: efficient operation and service monitoring, efficient building energy management and effective smart building maintenance. Subsequently, the top four major challenges were identified as being “lack of a systematic and comprehensive reference model”, “real-time data integration”, “the complexity and uncertainty nature of real-time data” and “real-time data visualisation”. An integrative framework is finally proposed by examining the interactive relationship amongst the enablers, the applications and the challenges.

Practical implications

The findings could guide facility managers/engineers to fairly understand the enablers, applications and challenges when DTs are being implemented to improve smart building performance and achieve user satisfaction at the facility management stage.

Originality/value

This study contributes to the knowledge body on DTs by extending the scope of the existing studies to identify the enablers and applications of DTs for smart buildings at the facility management stage and the specific challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

1 – 10 of over 2000