Search results

1 – 10 of 299
Article
Publication date: 11 April 2024

Xiaowei An, Sicheng Ren, Lunyan Wang and Yehui Huang

The purpose of this paper is to explore the support for multi-party collaboration in project construction provided by building information modeling (BIM). Based on the perspective…

Abstract

Purpose

The purpose of this paper is to explore the support for multi-party collaboration in project construction provided by building information modeling (BIM). Based on the perspective of value co-creation, the research results can provide support for the collaborative application and contract design of BIM platform.

Design/methodology/approach

In this paper, an evolutionary game model involving the owner, designer and constructor is constructed by using prospect theory and evolutionary game theory. Through simulation analysis, the evolution law of the strategy choice of each party in the collaborative application of BIM platform is discussed and the key factors affecting the strategy choice of all parties are analyzed.

Findings

The results show that there is an ideal local equilibrium point with progressive stability in the evolutionary game between the three parties: “the construction party shares information, the designer receives the information and optimizes the project and the owner does not provide incentives”; in addition, the opportunistic behaviors of the design and construction parties, as well as the probability of such behaviors being detected and the subsequent punishment have a significant impact on the evolutionary outcome.

Originality/value

This method can provide support for the collaborative application and contract design of BIM platform.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 27 February 2024

Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh and Hans L.M. Bakker

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern…

Abstract

Purpose

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.

Design/methodology/approach

A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.

Findings

The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.

Originality/value

The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 March 2024

Lama Abu Alieh, M. Reza Hosseini, Igor Martek, Wei Wu and Mehrdad Arashpour

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction…

Abstract

Purpose

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction industry. In response, Australian universities have tried to integrate the teaching of BIM into construction-related curricula, but with limited success. The acknowledged impediment is the lingering mismatch between what universities offer and what industry actually needs. However, the exact nature of that mismatch has yet to be identified. This study addresses that knowledge gap. It assesses both the current status of BIM competencies among university graduates and explores how BIM education at Australian universities may be improved to deliver BIM work readiness, as required by the industry.

Design/methodology/approach

This paper employed a qualitative research approach, utilizing 17 semi-structured interviews with experts in the Australian BIM industry. The Person-Organization (PO) fit theory, which emphasizes the congruence between individual and organizational characteristics, was utilized as a theoretical framework to examine the compatibility between “demand” and “ability” perspectives. The resulting data were analysed using this theoretical framework to gain insights into the PO fit perspectives in relation to BIM industry practices.

Findings

Findings reveal that graduates are generally competent regarding the use of BIM software. However, employers require much more than software skills, and expect recruits to have the capability to implement BIM as a process according to information management standards. Specifically, graduates are significantly deficient in matters of BIM protocols, collaboration and coordination, information workflows as well as completion and handover procedures.

Originality/value

This study is the first of its kind that bridges the gap between industry expectations and university education, in the Australian context, moving beyond the common discourse in education literature, which is exclusively focused on assessing students’ perceptions about BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 February 2024

Murali Jagannathan, Vijayeta Malla, Venkata Santosh Kumar Delhi and Venkatesan Renganaidu

The dispute resolution process in the construction industry is known for delays in settlement, with some cases even escalating to complex arbitration and litigation. To avoid…

Abstract

Purpose

The dispute resolution process in the construction industry is known for delays in settlement, with some cases even escalating to complex arbitration and litigation. To avoid conflicts turning into disputes, the parties need to be proactive in identifying and resolving conflicts in their nascent stages. It is here that innovative lean construction practices can potentially act as a game-changer to avoid disputes, and this study aims to attempt to understand this phenomenon empirically.

Design/methodology/approach

A questionnaire-based empirical study, followed by semi-structured interviews, is conducted to understand the relevance of key tenets of lean principles in dispute avoidance.

Findings

Although stakeholders agree on the usefulness and practicality of lean principles in dispute avoidance, the extent of agreement is lesser when it comes to its implementation practicality. Moreover, there is a demographic influence observed on lean tenets such as “open communication”, “stakeholder collaboration” and “constraint identification”.

Practical implications

The results point towards an approach that combines contractual mandate, training and awareness creation to iron out the differences in the usefulness and practicality of lean approaches to avoid disputes.

Originality/value

Lean implementation is widely discussed in many construction contexts, such as sustainability, productivity improvement and planning. However, a discussion on lean philosophy’s role in dispute avoidance is muted. Therefore, this study assumes significance.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 February 2024

Burhanuddin Susamto and Akhmad Akbar Susamto

This paper aims to develop a novel approach to Islamic deposit insurance, specifically addressing the deficiencies in the current prevailing models of Islamic deposit insurance.

Abstract

Purpose

This paper aims to develop a novel approach to Islamic deposit insurance, specifically addressing the deficiencies in the current prevailing models of Islamic deposit insurance.

Design/methodology/approach

The analysis in this paper adopts a qualitative content analysis approach to review the existing literature on Islamic deposit insurance and propose a new model.

Findings

The proposed model includes a revised scheme. In the event of a bank failure, the funds used to reimburse depositors of the failed bank are divided into two distinct categories. The first category includes nonrepayable premiums that have been previously paid by the failed bank and managed by the Islamic deposit insurance agency or Islamic deposit insurance corporation. The second category comprises qard hasan, an interest-free loan provided by the Islamic deposit insurance agency or Islamic deposit insurance corporation using the deposit insurance funds from the collective pool of premiums of other banks.

Practical implications

The proposed model ensures that well-managed banks are not unfairly burdened by the failures of their poorly managed counterparts, thus preventing a sense of unfairness and inefficiency. Implementing the proposed model may result in higher business practices and risk management standards, ultimately leading to better depositors’ protection and banking system’s stability.

Originality/value

This paper offers a significant contribution to the limited literature on Islamic deposit insurance. The proposed model enriches the discourse and offers valuable insights for the future development of Islamic banking.

Details

Journal of Islamic Accounting and Business Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1759-0817

Keywords

Article
Publication date: 30 April 2024

Junesoo Lee

This article conceptualizes and constructs a comprehensive framework that can better help to answer that question – Who is accountable for social and public problems? …

Abstract

Purpose

This article conceptualizes and constructs a comprehensive framework that can better help to answer that question – Who is accountable for social and public problems? – theoretically and practically.

Design/methodology/approach

Tracing the drivers behind two phenomena “accountability hole” and “accountability black hole”, stemming from “pushing power game” and “pulling power game”, respectively, this study considers (1) the three actors of society: citizens (civil society), corporations (market) and civil servants (government), and (2) the principal-agent relationship between the three actors in the face of social and public problems. As a result, the 4CAs framework that contains the three actors’ collaborative accountabilities to one another is presented.

Findings

The 4CAs model emphasizes (1) all three actors function as agents that are accountable to one another, (2) collaborative accountability beyond collaborative governance and (3) repowering citizens and corporations beyond just empowering them, i.e. returning their inherent rights and obligations to serve one another.

Originality/value

The 4CAs model may function as a descriptive and prescriptive lens through which the trilemma between market failure, government failure and citizen failure can be re-assessed and balanced. The model can also be used as a set of indicators for assessing and helping a society to better resolve the social and public problems collectively.

Details

International Journal of Public Sector Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0951-3558

Keywords

Article
Publication date: 11 March 2024

Hisham Said, Aswathy Rajagopalan and Daniel M. Hall

Cross-laminated timber (CLT) is an innovative construction material that provides a balanced mix of structural stiffness, fabrication flexibility and sustainability. CLT…

Abstract

Purpose

Cross-laminated timber (CLT) is an innovative construction material that provides a balanced mix of structural stiffness, fabrication flexibility and sustainability. CLT development and innovation diffusion require close collaborations between its supply chain architectural, engineering, construction and manufacturing (AECM) stakeholders. As such, the purpose of this study is to provide a preliminary understanding of the knowledge diffusion and innovation process of CLT construction.

Design/methodology/approach

The study implemented a longitudinal social network analysis of the AECM companies involved in 100 CLT projects in the UK. The project data were acquired from an industry publication and decoded in the form of a multimode project-company network, which was projected into a single-mode company collaborative network. This complete network was filtered into a four-phase network to allow the longitudinal analysis of the CLT collaborations over time. A set of network and node social network analysis metrics was used to characterize the topology patters of the network and the centrality of the companies.

Findings

The study highlighted the scale-free structure of the CLT collaborative network that depends on the influential hubs of timber manufacturers, engineers and contractors to accelerate the innovation diffusion. However, such CLT supply collaborative network structure is more vulnerable to disruptions due to its dependence on these few prominent hubs. Also, the industry collaborative network’s decreased modularity confirms the maturity of the CLT technology and the formation of cohesive clusters of innovation partners. The macro analysis approach of the study highlighted the critical role of supply chain upstream stakeholders due to their higher centralities in the collaborative network. Stronger collaborations were found between the supply chain upstream stakeholders (timber manufacturers) and downstream stakeholders (architects and main contractors).

Originality/value

The study contributes to the field of industrialized and CLT construction by characterizing the collaborative networks between CLT supply chain stakeholders that are critical to propose governmental policies and industry initiatives to advance this sustainable construction material.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 21 February 2024

Hassan Mohamed

The purpose of this paper is to examine the supervening loss of inter-organisational trust in long-term commercial contracts. The underlying research question is whether contract…

Abstract

Purpose

The purpose of this paper is to examine the supervening loss of inter-organisational trust in long-term commercial contracts. The underlying research question is whether contract law – the legal institution regulating economic exchanges – should intervene and enable a party to a long-term commercial contract to extricate itself from a situation where a relationship of trust has broken down irretrievably.

Design/methodology/approach

This paper uses doctrinal methodology and theoretical conceptualisation to answer the underlying research question. The legal instrument chosen for analysis purposes is the UNIDROIT Principles of International Commercial Contracts. This paper also draws on extant literature on inter-organisational trust (including conceptual and empirical studies) to support the arguments and propositions. Furthermore, this study proceeds to assess the substantive justifiability of the proposed remedial measure using four normative values: legal certainty and predictability, protection of the performance interest, economic efficiency and the preservation of the relation.

Findings

The central argument put forward in this paper is the reformulation of draft Article 6.3.1 proposed by the UNIDROIT Working Group on Long-Term Contracts, which confers a novel right to terminate for a compelling reason. This paper presents a multidimensional model of inter-organisational trust that would serve as the conceptual framework for the proposed reformulation of the provision and establishes a coherent juridical basis for the legal solution that would accord with the Principles of International Commercial Contracts’ general remedial scheme. As for the normative assessment, this paper demonstrates that the proposed remedial measure would significantly promote efficient outcomes and positively serve the norms of legal certainty, protection of the performance interest and the preservation of the relation.

Originality/value

This paper addresses the lacuna in current legal scholarship in relation to the adverse socio-economic effects following trust violation and deterioration in inter-organisational relationships. Additionally, the propositions and findings should contribute to the workings of the UNIDROIT in adopting new rules and principles that would serve the special requirements of cross-border trade.

Details

International Journal of Law and Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1754-243X

Keywords

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 19 April 2024

Xiaotong Huang, Wentao Zhan, Chaowei Li, Tao Ma and Tao Hong

Green innovation in supply chains is crucial for socioeconomic development and stability. Factors that influence collaborative green innovation in the supply chain are complex and…

Abstract

Purpose

Green innovation in supply chains is crucial for socioeconomic development and stability. Factors that influence collaborative green innovation in the supply chain are complex and diverse. Exploring the main influencing factors and their mechanisms is essential for promoting collaborative green innovation in supply chains. Therefore, this study analyzes how upstream and downstream enterprises in the supply chain collaborate to develop green technological innovations, thereby providing a theoretical basis for improving the overall efficiency of the supply chain and advancing green innovation technology.

Design/methodology/approach

Based on evolutionary game theory, this study divides operational scenarios into pure market and government-regulated operations, thereby constructing collaborative green innovation relationships in different scenarios. Through evolutionary analysis of various entities in different operational scenarios, combined with numerical simulation analysis, we compared the evolutionary stability of collaborative green innovation behavior in supply chains with and without government regulation.

Findings

Under pure market mechanisms, the higher the green innovation capability, the stronger the willingness of various entities to collaborate in green innovation. However, under government regulation, a decrease in green innovation capability increases the willingness to collaborate with various entities. Environmental tax rates and green subsidy levels promote collaborative innovation in the short term but inhibit collaborative innovation in the long term, indicating that policy orientation has a short-term impact. Additionally, the greater the penalty for collaborative innovation breaches, the stronger the intention to engage in collaborative green innovation in the supply chain.

Originality/value

We introduce the factors influencing green innovation capability and social benefits in the study of the innovation behavior of upstream and downstream enterprises, expanding the research field of collaborative innovation in the supply chain. By comparing the collaborative innovation behavior of various entities in the supply chain under a pure market scenario and government regulations, this study provides a new perspective for analyzing the impact of corresponding government policies on the green innovation capability of upstream and downstream enterprises, enriching theoretical research on green innovation in the supply chain to some extent.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Access

Year

Last 3 months (299)

Content type

Earlycite article (299)
1 – 10 of 299